§ 16.04.150 — Installation costs—Deposit required
Code of Ordinances of the City of Elizabeth, New Jersey (Supp. No. 31: codified through Ordinance No. 6138, passed June 24, 2025) · Elizabeth City Code § 16.04.150
Corpus is an independent public-information project, not the official City of Elizabeth website. Stable reference: corpuslaw.us/code/af3ca51d-f1bf-49ef-9205-82a756461bf7
16.04.150 - Installation costs—Deposit required.
All improvements (except electric, gas and water lines) shall be installed under the supervision and inspection of the city engineer, the cost thereof to be borne by the developer. Such costs shall be estimated at five percent of the total cost of the improvement, and such amount in the form of cash or certified check, to the order of the city treasurer, shall be sent to the city engineer for deposit with the city treasurer before commencement of any construction. If the deposit shall be insufficient, any additional inspection costs shall be paid by the developer before the improvement is accepted by the city. Any balance from the deposit, after inspection costs have been deducted therefrom, shall be refunded to the developer. Upon completion of all improvements and prior to acceptance thereof by the municipality, the subdivider shall post a one-year maintenance bond (and deed to convey all streets and utilities and easements, same to contain metes-and-bounds description) in a form approved by the city attorney.
(Prior code § 129-19)
Ask a question about Elizabeth law
Corpus searches the Elizabeth sections it holds and shows the ones that match, with their citations. Free, no sign-in.
