23:1-9 — CONSTRUCTION ZONE: TRAFFIC CONTROLS FOR STREET AND HIGHWAY CONSTRUCTION AND MAINTENANCE OPERATION AND ADOPTION OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS. (Municipal Roads Only)
Code of the City of Newark, New Jersey (Newark City Code and Charter current through the 2026-09-23 codification (eCode360 publication NE4043, scraped 2026-11-17)) · Newark City Code § 23:1-9
Corpus is an independent public-information project, not the official City of Newark website. Stable reference: corpuslaw.us/code/08b63190-0e1d-42ee-9b48-2c67ee5c061e
§ 23:1-9: CONSTRUCTION ZONE: TRAFFIC CONTROLS FOR STREET AND HIGHWAY CONSTRUCTION AND MAINTENANCE OPERATION AND ADOPTION OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS. (Municipal Roads Only)
a. Controls Established for Construction Zone. The Governing Body hereby finds and declares that problems of traffic control occur and traffic must be moved through or around street construction, maintenance operations, and utility work, above and below ground which requires blocking the roadway and obstructing the normal flow of traffic; and that such obstructions are or can become dangerous when not properly controlled. In order to better promote the public health, safety, peace and welfare, it is necessary to establish controls and regulations directed to the safety and expeditious movement of traffic through construction and maintenance zones and to provide safety for the work force performing these operations. The City of Newark, in the County of Essex, State of New Jersey, does hereby adopt the current Manual on Uniform Traffic Control Devices hereafter known as M.U.T.C.D., except as hereby supplemented and amended, as it controls and regulates whenever construction maintenance operations of utility work obstructs the normal flow of traffic. Any person, contractor, or utility, who fails to comply with the provisions of M.U.T.C.D. while performing such work is in violation of this section. b. Pre-Construction Meetings. It shall be the responsibility of the person, contractor, or in the case of a public utility agreement, wishing to conduct work on, under or above the roadway to contact the Director of the Department of Public Safety in order to arrange a pre-construction meeting in order to submit plans for the safe movement of traffic during such period of construction work. Any person, contractor or utility who fails to comply with this section prior to the start of such work or whose plans are not approved by the Director of the Department of Public Safety is in violation of this section. c. Hazardous Conditions. The person, contractor, or utility shall provide the Director of the Department of Public Safety with at least two emergency contact phone numbers to be called in case of emergency problems at the construction or maintenance site prior to the start of any work. If for any reason emergency contact cannot be reached, or if the emergency contact person does not respond to the call from the Director of the Department of Public Safety to correct a hazardous condition, the City may respond to correct such hazardous condition. The reasonable fees for such emergency service by the City shall be charged to the person, contractor, or utility for such condition. d. Hours. There shall be no construction, maintenance operations, or utility work on any roadway in the City before the hour of 9:00 a.m. or after 4:00 p.m. This time limit may be adjusted to permit work prior to 9:00 a.m. or after 4:00 p.m. by the Officer in charge of the Division of Police. If it is determined by the Officer in charge that the construction or maintenance operations prior to 9:00 a.m. or after 4:00 p.m. would substantially delay traffic or cause a safety or health hazard, the work shall then be permitted only between 9:00 a.m. and 4:00 p.m. e. Road Closing and Detours. Road closing and/or traffic detours shall not be permitted unless approved by the Director of the Department of Public Safety. f. Traffic Directors. Traffic directors shall be posted at all construction or maintenance sites when determined by the Director of the Department of Public Safety that same is necessary to provide for the safety and expeditious movement of traffic. g. Stop Work. The Director of the Department of Public Safety shall have the authority to stop work, including the removal of equipment and vehicles, stored material within the street right-of-way, back filling of open excavations and/or other related work, in order to abate any nuisance and/or safety hazard or for any violation of this section. h. Site Preparation. It is to be expressly understood that no materials, vehicle or equipment are to be placed in the roadway or sidewalk or until all construction, signs, lights, devices and pavement markings are installed. i. Violations and Penalties. Any person, contractor or utility who commits a violation of this section shall, upon conviction thereof for a first offense, pay a fine of not less than $100 nor more than $500 and/or be imprisoned in the County jail for a term not exceeding 90 days. For a second offense, the person, contractor or utility shall, upon conviction thereof, pay a fine of not less than $250 and/or be imprisoned in the County jail for a term not exceeding 90 days. A separate offense shall be deemed committed on each day during or on which a violation occurs or continues. j. Inconsistent Regulations. All ordinances or parts of ordinances which are inconsistent with the provisions of this section are hereby repealed to the extent of any such inconsistency. k. Approval by Commissioner of Transportation. This section shall take effect after approval by the Commissioner of Transportation 20 days after passage and publication as prescribed by law.
[New]
Ask a question about Newark law
Corpus searches the Newark sections it holds and shows the ones that match, with their citations. Free, no sign-in.
