For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

41:15-8-1 — General

Code of the City of Newark, New Jersey (Newark City Code and Charter current through the 2026-09-23 codification (eCode360 publication NE4043, scraped 2026-11-17)) · Newark City Code § 41:15-8-1

Corpus is an independent public-information project, not the official City of Newark website. Stable reference: corpuslaw.us/code/44bbe8b7-125b-4c5e-9b63-19c0aa8cc95a

§ 41:15-8-1: General.

The information hereunder is required as part of an application for site plan review. Failure to supply any of the required information and/or payment of fees shall constitute an incomplete submission and the application will not be acted upon by the Central Planning Board. 1. Site plans submitted shall conform to the zoning regulations as set forth in Title XLI, Zoning and Land Use Regulations of the Revised General Ordinances of the City. 2. The applicant shall submit a completed City of Newark Central Planning Board/Zoning Board of Adjustment application with the payment of the required fee, as provided in Section 41:15-12-2. 3. Clear, color photos of site. 4. The applicant shall submit the required number of site plan drawings, each of which shall bear the impression seal and the inked signature of the licensed architect, engineer or land surveyor for the appropriate drawing as required by N.J.A.C. 13:40-1 and 13:40-2 and shall be in conformance with the preliminary and final site plan requirements detailed in Sections 41:15-8-2 and 41:15-8-3. 5. The following must be submitted at least two days prior to the hearing: a. Certified Mail Receipts for notice requirement. i. Mounted on 8.5 x 11 inch bound paper. ii. Six to a page. iii. Arranged in the same order as indicated on the certified list of property owners (a properly certified U.S. Postal Form 3877 will be accepted in lieu of the mounted receipts, provided that the addresses are arranged in the same order as indicated on the certified list). b. Affidavit of Proof of Service by individual who performed mailing certified. c. Affidavit of publication from newspaper. 6. For projects greater than 5,000 square feet, the applicant shall submit for the Final Site Plan six copies of the Soil Erosion and Sedimentation Control Plan to the Central Permit Office, Department of Engineering for their review. The Department of Engineering shall inform the Secretary of the Central Planning Board of its action and/or comments and forward a copy of the plan after it has been approved. 7. Technical Review Meeting. a. The applicant for any development for 15 or greater residential units or 10,000 or greater square feet of non-residential building area shall participate in a technical review meeting involving representatives from the City Departments/Divisions of Planning and Zoning, Engineering, Traffic and Signals, and Water and Sewer. b. Participation in the technical review meeting shall be a mandatory action prior to the application being deemed complete. The meeting will be scheduled within 45 days of the submission of the application materials unless an extension is requested by the applicant and agreed to by the city. c. The purpose of the technical review meeting shall be to evaluate the feasibility of the project from an infrastructure, engineering, and design standpoint to identify potential structural impediments and to ensure consistency with the NZLUR and Master Plan.

[Adopted 11-1-2023 by Ord. No. 6PSF-E, 11-01-2023 ]

Ask a question about Newark law

Corpus searches the Newark sections it holds and shows the ones that match, with their citations. Free, no sign-in.