For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10.08.010 — Adoption

Municipal Code of the City of New Brunswick, New Jersey (Codified through Ordinance No. O-042606, passed April 15, 2026. (Supp. No. 39, Update 2)) · New Brunswick City Code § 10.08.010

Corpus is an independent public-information project, not the official City of New Brunswick website. Stable reference: corpuslaw.us/code/a06833ee-373b-4459-a445-c2106c82a341

10.08.010 - Adoption.

A. The council finds and determines: 1. That problems of traffic control occur when traffic must be moved through or around street construction, maintenance operations, and utility work, whether above or below ground, which require blocking the roadway and/or obstructing the normal flow of traffic; 2. That such obstructions are or can become dangerous when not properly controlled; and 3. That in order to better promote the public health, safety, and welfare it is appropriate to establish controls and regulations directed to the safe and expeditions movement of traffic through construction and maintenance zones and to provide safety for the work force performing these operation. B. The city adopts the current manual on uniform traffic control devices hereafter known as M.U.T.C.D., except as supplemented and amended, to control and regulate whenever construction maintenance operations or utility work obstructs the normal flow of traffic. Any person, contractor or utility work obstructs the normal flow of traffic. Any person, contractor or utility who or which fails to comply with the provisions of the M.U.T.C.D. while performing such work is in violation of this chapter. C. It is the responsibility of any person, contractor or public utility seeking to conduct work on, under or above any city roadway to contact the city engineer, department of engineering and traffic safety division of the police department in order to arrange a pre-construction meeting and to submit plans for the safe movement of traffic during the period of construction of such work. Any person, contractor or utility who or which fails to comply with this chapter prior to the commencement of such work or whose plans are not approved by the traffic safety bureau of the policy department is in violation of this chapter. D. The person, contractor, or utility provides the city engineer, department of engineering or traffic safety division of the police department with at least two emergency contact numbers to be called in case of emergency problems at the construction or maintenance site prior to the start of any work. If for any reason emergency contact cannot be achieved, or if the emergency contact person does not respond to a call from the city engineer, department of engineering and/or traffic safety division of the police department to correct a hazardous condition, the city may respond to and correct such hazardous condition. The reasonable costs for such emergency service by the city are charged to the person, contractor, or utility responsible for such condition or conditions. E. There is no construction, maintenance operations, or utility work on any roadway in the city before the hour of nine a.m. or after 3:30 p.m. provided that this time limit may be adjusted to permit work prior to nine a.m. or after 3:30 p m by the officer in charge of the traffic safety division of the police department and/or the city engineer, department of engineering. F. Road closings and/or traffic detours are not permitted unless approved by the city engineer, department of engineering and traffic safety division of the police department and, where appropriate, by resolution of city council. G. Police officers to direct and control traffic are posted at all construction or maintenance sites when determined by the division of traffic safety of the police department that the same are necessary to provide for the safe and expeditions movement of traffic. 1. When police officers are determined to be necessary, the person, contractor or public utility reimburses the city for the services of the officers at the current schedule of reimbursement on file with the city engineer. The traffic safety division is authorized to require and collect and deposit for fifty (50) percent of the estimated cost of police services as a condition of the plans required by subsection (C) hereof. H. The city engineer, department of engineering and traffic safety division of the police department shall have the authority to stop work, including the removal of equipment and vehicles and stored material within the street right-of-way, back filling of open excavations and/or other related work, in order to abate any nuisance and/or safety hazard or for any violation of this chapter. I. No materials, vehicles or equipment are to be placed in any roadway or sidewalk area until all construction, signs, lights, devices and pavement markings are installed.

(Prior code § 6-27.1)

Ask a question about New Brunswick law

Corpus searches the New Brunswick sections it holds and shows the ones that match, with their citations. Free, no sign-in.