§ 12.08.020 — Permit required
Municipal Code of the City of New Brunswick, New Jersey (Codified through Ordinance No. O-042606, passed April 15, 2026. (Supp. No. 39, Update 2)) · New Brunswick City Code § 12.08.020
Corpus is an independent public-information project, not the official City of New Brunswick website. Stable reference: corpuslaw.us/code/ab231baf-911d-4867-848a-8154a4b7e2bd
12.08.020 - Permit required.
A. No person, firm, or corporation shall construct, remove, replace or repair any sidewalk, curbing, driveway, street opening or any excavation or place any form of construction in, over or upon any street, or otherwise endanger or obstruct the normal flow of traffic or normal flow of surface water by the placing of any barricade, structure, material or equipment not normally designated to be operated, placed or used on a street without first obtaining a written permit, approved by the city engineer, which shall be issued by the city engineer for such fees as provided in this chapter. Before a permit is issued, application must be made therefor upon forms provided by the city. The application includes scaled or dimensioned drawings satisfactory to the city engineer, showing all details of any structures, pipes, ducts, wires, cables, or other facilities being installed in the street or of any street being altered in any way. B. Every permit specifies the name and residence of the applicant, the place and places at which the work is to be done, the character of the work and the time within which it is to be completed. The permit must be in the possession of the parties doing the work and must be exhibited to the city engineer or his or her authorized representative upon request. No such permit is valid except for the place, time and character of work specified therein. C. The city engineer shall have the right to revoke or cancel the permit at any time should the permittee fail to comply with any of the terms, agreements, covenants and conditions thereof. D. The permit shall not be assigned or transferred except upon the prior written consent of the city engineer. E. Such permit is valid for an effective period, not to exceed thirty (30) consecutive calendar days, to be determined and specified by the city engineer. Such effective period may be extended, if so requested in writing by the permittee prior to the expiration thereof, for such additional period as the city engineer, at the latter's discretion, may authorize. F. All work performed in accordance with permits issued under this chapter is constructed, removed, replaced or repaired in accordance with such grades and specifications as may be determined or promulgated by the city engineer and the permittee shall perform the work so as to meet the grade and alignment of the adjoining sidewalk, curb and driveway and/or such established line and grade as may be determined by the city engineer and in accordance with the latter's directions and the city's Engineering, Utility and Landscaping Standards. All materials and installation procedures shall conform to the NJDOT Standard Specification for Road and Bridge Construction, current edition. G. No permit is issued for a newly constructed permanent street, which street was constructed after the passage of this article for a period of five years from the date of acceptance of such construction, except in cases of emergency as described in Section 12.08.160. Ninety (90) days prior to the start of construction of permanent pavement on any street, the city clerk shall notify, in writing, all property owners of record on such street, all utility companies serving such street, the police chief and the fire chief of such construction and of the provisions of this section. Sidewalks are exempt from the provisions of this section. H. All street openings, excavations, and restorations are made under the supervision and control of the city engineer and subject to his or her inspection. The city engineer shall not be required to inspect any work done under the provisions of this chapter unless the permittee shall have given not less than forty-eight (48) hours notice that the work is ready for inspection. All means and methods employed shall conform with OSHA standards for trench safety and confined space regulations. Failure to comply, as determined by the city engineer or his or her representative, shall be justification for stopping the work and removal from the site. I. The permittee shall clean up and remove promptly from the site of work upon daily completion of work, all surplus excavated material and debris, and upon final completion of the project shall leave the site of work in a neat and orderly condition as good as it was previously. J. Where top soil, seeded areas or sod are disturbed in the course of the work, permittee shall restore such ground surfaces to a condition equal to that prior to commencement of work.
(Ord. No. O-022305, § I, 3-1-23; Prior code § 19-1.2)
Ask a question about New Brunswick law
Corpus searches the New Brunswick sections it holds and shows the ones that match, with their citations. Free, no sign-in.
