15.44.020 - Permit requirements.

A. Permit Required for Deposit of Acceptable Soil Material. 1. No owner, agent, lessor, lessee, tenant or occupant of any lot, grounds, street, road or alley within the city of New Brunswick shall deposit thereon or permit the depositing thereon of any acceptable soil material unless a permit is issued by the engineering department. The following shall be exempt from the provisions of this section: a. Select fill for septic installation and/or repair certified by a New Jersey licensed engineer; or b. Routine landscaping activities that do not require in excess of twenty (20) cubic yards of approved soil material conducted in connection with residential use, or forty (40) cubic yards commercial use not subject to any other permitting requirements set forth in the ordinances of the city of New Brunswick. Any materials used in activities permitted herein shall nevertheless conform to all applicable local, state and federal regulations. c. Certified clean backfill for underground storage tank and/or contaminated soil removals pursuant to permits issued by the New Jersey Department of Environmental Protection under N.J.A.C. 7:14B and demolition permits issued by the city of New Brunswick Construction Code Division shall be exempt from the provision of this chapter. 2. Construction operations related to, but not limited to, road, pipe, utility service or public improvements as installed by the city or through a city-authorized contractual agreement. 3. Unless otherwise exempt under the terms of this chapter, no permit to deposit approved soil material upon or used to fill up or raise the surface or level of any lot, grounds, street, road, or alley in the city of New Brunswick shall be issued unless such fill operation is performed in connection with: a. A building permit issued by the construction code division; or b. A site plan or subdivision approval granted by the (planning board and/or zoning board of adjustment). 4. Responsibility for obtaining a permit for approval to deposit approved soil material is with the property owner. 5. Each permit issued under the terms of this chapter shall be valid only for the locations(s) described in the permit and for a period of six months from the date of issuance, subject to renewal. B. Proof of Compliance with Soil Cleanup Criteria. 1. Unless otherwise exempt under the terms of this chapter, no permit to deposit acceptable soil material upon or used to fill up or raise the surface of any lot, ground, street, road, or alley in the city of New Brunswick shall be issued unless the applicant submits, to the city engineer, proof that the acceptable soil material has been tested at the source for compliance with the soil ranking criteria found in N.J.A.C. 7:26F, Appendix C, Table 1-A as may be amended from time to time. 2. Proof shall be a letter from a laboratory certified by the state to perform soil analyses, stating that results meet or exceed the present ranking criteria for residential direct contact as contained above, along with the actual test results. 3. All expenses connected with such testing are to be borne by the recipient of the fill. 4. The city engineer shall have the authority to order additional reports or inspections as it may deem necessary and appropriate. 5. Acceptance or rejection of any approved soil material is to be made by the city engineer according to this article and any additional rules or regulations it may from time to time enact. 6. A minimum of two samples are to be extracted from the source for laboratory analysis for each five hundred (500) cubic yard lot, or fraction thereof. Samples must be biased to the location of the highest suspected contaminated concentrations, as determined by the laboratory professional or his or her duly assigned representative. C. Fees. 1. The fee for issuance of a permit under this chapter shall be one hundred dollars ($100.00). 2. No permit shall be issued unless the applicant furnishes to the engineering department an approved plot plan, site plan or subdivision plan, as the case may be, for the proposed filling project, the permit fee, and a performance guarantee, if not covered elsewhere. Such guarantee shall be a performance bond in the amount of one hundred (100) percent of the cost of the proposed work. The cost of the proposed work shall be furnished in writing by the applicant and must include importation and transportation of the acceptable soil material. Such funds to be released upon inspection of the fill project and approval thereof by the engineering department as having met the provisions of this section. 3. The inspection fee shall be five percent of the cost of the project. 4. The engineering department shall have a period of thirty (30) days from receipt of the complete application within which to issue or deny the permit application. 5. The applicant shall obtain any necessary soil erosion permit from the Freehold Conservation District as may be required.

(Ord. O-040801 § 2 (part), 2008)