16.24.200 - Off-tract improvements.
A. As a condition of final subdivision or site plan approval, the planning board may require an applicant to pay a pro rata share of the cost of providing reasonable and necessary circulation improvements and water, sewerage, drainage facilities and other improvements, including land and easements, located off-tract of the property limits of the subdivision or development but necessitated or required by the development. "Necessary" improvements are those clearly and substantially related to the development in question. The planning board provides in its resolution of approval the basis of the required improvements. The capacity and design of proposed improvements are based upon the circulation plan element and utility service plan element of the adopted master plan. The proportionate or pro rata amount of the cost of such facilities within a related or common area is based on the following criteria. A. Cost Allocation. 1. Full Allocation. In cases where off-tract improvements are necessitated by the proposed development, and where no other property owner(s) receive(s) a special benefit thereby, the applicant may be required at his or her sole expense and as a condition of approval, to provide and install such improvements. 2. Proportionate Allocation. a. Where it is determined that properties outside the development will also be benefited by the off-tract improvements, the following criteria shall be utilized in determining the proportionate share of the cost of such improvements to the developer. b. Allocation formula. i. Sanitary sewers. The applicant's proportionate share of distribution facilities including the installation, location, or replacement of collector, trunk and interceptor sewers and associated appurtenances, is computed as follows: (A) The capacity and the design of the sanitary sewer system are based on the standards specified in Section 16.24.270 of this chapter; (B) The city engineer or planner shall provide the applicant with the existing and reasonably anticipated peak hour flows as well as capacity limits of the affected sewer system; (C) If the existing system does not have adequate capacity to accommodate the applicant's flow given existing and reasonably anticipated peak-hour flows, the pro rata share is computed as follows: Total cost of enlargement or improvement | = | Capacity of enlargement (gallon per day) (gpd) _____ | _____ Developer's cost | Development generated gallons per day to be accommodated by the enlargement or improvement ii. Water supply. The applicant's proportionate share of water distribution facilities including the installation, relocation or replacement of water mains, hydrants, valves, and associated appurtenances is computed as follows: (A) The capacity and the design of the water supply system are based on the standards specified in Section 16.24.270 of this chapter, (B) The city engineer or planner shall provide the applicant with the existing and reasonable anticipated capacity limits of the affected water supply system in terms of average demand, peak demand, and fire demand; (C) If the existing system does not have adequate capacity as defined above to accommodate the applicant's needs, the pro rata share is computed as follows: Total cost of enlargement or improvement | = | Capacity of enlargement or improvement (gallon per day) (gpd) _____ | _____ Developer's cost | Development generated gallons per day to be accommodated by the enlargement or improvement iii. Roadways. The applicant's proportionate share of street improvements, alignment, channelization, barriers, new curbs, sidewalks, trees, utility improvements not covered elsewhere, the construction or reconstruction of new or existing streets, and other associated street or traffic improvements shall be as follows: (A) The city engineer or planner shall provide the applicant with the existing and reasonable anticipated future peak-hour flows for the off-tract improvement; (B) If the existing system does not have adequate capacity as defined above, the pro rata share is computed as follows: Total cost of enlargement or improvement | = | Capacity of enlargement or improvement (peak-hour traffic) _____ | _____ Developer's cost | Development peak-hour traffic to be accommodated by the enlargement or improvement iv. Drainage improvements. The applicant's proportionate share of storm water and drainage improvements including the installation, relocation or replacement of storm drains, culverts, catch basins, manholes, riprap, improved drainage ditches and appurtenances, and relocation or replacement of other storm drainage facilities or appurtenances, is determined as follows: (A) The capacity and the design of the drainage system to accommodate storm water runoff shall be based on the standard specified in Section 16.24.270 of this chapter, computed by the developer's engineer and approved by the city engineer. (B) The capacity of the enlarged, extended or improved system required for the subdivision and areas outside of the developer's tributary to the drainage system is determined by the developer's engineer subject to approval of the city engineer. The plans for the improved system are prepared by the developer's engineer and the estimated cost of the enlarged system calculated by the city engineer. The pro rata share for the proposed improvements is computed as follows: Total cost of enlargement or improvement | = | Capacity of enlargement or improvement (total capacity expressed in cubic feet per second) _____ | _____ Developer's cost | Development - generated peak rate of run off expressed in cubic feet per second to be accommodated by the enlargement or improvement. v. Other improvements. The applicant's proportionate share of other capital improvements shall be computed as follows: Total cost of enlargement or improvement | = | Capacity of enlargement or improvement _____ | _____ Developer's cost | Development share of enlargement or improvement
(Prior code § 23-9.1)
Ask a question about New Brunswick law
Corpus searches the New Brunswick sections it holds and shows the ones that match, with their citations. Free, no sign-in.