§ 407-31 — Fees and charges
Code of the City of Paterson, New Jersey (eCode360 publication current through 2025-12-16) · Paterson City Code § 407-31
Corpus is an independent public-information project, not the official City of Paterson website. Stable reference: corpuslaw.us/code/3bcdb090-839f-4d44-9d31-db7c15ed31be
§ 407-31: Fees and charges.
Unless a fee is provided for below, fees and charges will be made by the City at actual cost for the following: A. Application for new connections: $25. B. Administrative or engineering review of new connections, including field inspection of installations: See § 435-31B. C. Inspection, installation or repair costs of facilities where the condition is not caused by or the responsibility of the City. D. Fixed administrative fee in conjunction with connection charges or reconnection charges: $250. E. Sampling, analysis or flow monitoring charges. F. Damages, reconstruction or repair costs where City facilities are damaged by others. G. Other costs incurred by the City at the request of or as a result of action (or inaction) by other parties.[1] H. Variable statutory connection fees or reconnection fees: (1) Fee for service; timing of payment: Connection fees shall be paid no later than the time that a certificate of occupancy, certificate of continued occupancy, or any amendment thereto is issued for the structure for which the new or expanded sewer connection is made. Payment of such connection fees shall be a condition precedent for the issuance or amendment of the said certificate(s). (2) Fee for additional capacity, including change of use. An application for additional capacity shall be made by any existing nonresidential user whenever there is an increase in the projected sewer usage for any existing building or unit resulting from an increase in size in the building or unit, or resulting form a change in use. Such an application shall also be made by an existing residential user when further dwelling units are added to an existing site. A connection fee shall be charged to the nonresidential user based upon the increase in projected sewer usage associated with the aforesaid increase in size, and to a residential user based on the increase in number of units. (3) Fee to reinstate service after a lapse of years; no fee for prompt restoration. In the event that an application is made to reinstate sewer service to a residential structure that was previously abandoned or terminated when the prior structure was demolished or substantially totally destroyed because of catastrophe, no additional connection fee shall be due, provided that the application for service is made within three years of the date of the prior termination of service. In the event that an application is made to reinstate water service to a nonresidential structure that was previously abandoned or terminated when the prior structure was demolished or substantially totally destroyed because of catastrophe, no additional connection fee shall be due, provided that: 1) the application for service is made within two years of the date of the prior termination of service; and 2) there is no change in the projected sewer usage of the building. In the event that condition 1) herein has been satisfied, but there will be an increase in the projected sewer usage of the building, then the applicant shall pay a connection fee only on the amount of the increase in the projected sewer usage. (4) Fifty-percent fee for prompt restoration at a different location within the City of Paterson. In all situations where Subsection H(3) above would authorize a fee waiver for restoration of service at the same location after a demolition or catastrophic destruction, a fee reduction of 50% will be awarded if service is initiated at a new site within the City of Paterson, other than the original location, within the periods of time set forth within Subsection H(3). The said reduction of 50% shall be granted only where the owner of the demolished or destroyed site owned it for at least five years before the date of demolition or destruction. (5) Unit for connection fee. The connection fee to be paid to the City of Paterson shall be $1,877.12 per equivalent dwelling unit (EDU), including any proportionate fraction thereof. The minimum connection fee per unit shall be based on one full EDU. In order to determine the appropriate number of equivalent dwelling units per application for nonresidential users, the projected flow criteria, as defined in N.J.A.C. 7:14A-23.3, shall be utilized. (6) Sample calculations for connection fees. The following are sample calculations for determining connection fees for connecting to the City of Paterson sanitary sewer system: (a) Residential sample calculations. All residential single-family dwelling units, including detached houses, each unit in multifamily dwellings, garden apartment units, townhouse or condominium units, are deemed to be one equivalent dwelling unit (EDU). For example: [1] Single family detached house: 1 EDU | x | $1,877.12 | = | $1,877.12 EDU [2] A multifamily dwelling with three units: 3 EDU | x | $1,877.12 | = | $5,631.36 EDU [3] Two buildings of garden apartments, townhouses, or condominiums, with eight units per building: 8 units | x | 2 buildings | x | 1 EDU | x | $1,877.12 | = | $30,033.92 Building | | | | Unit | | EDU (b) Nonresidential sample calculations. In all nonresidential uses, the projected flow criteria, as defined in N.J.A.C. 7:14A-23.3, shall be used in order to determine the anticipated gallons per day of wastewater flow which shall then be computed at the rate of $1,877.12 per 265 gallons of wastewater flow per day (one EDU). For example: [1] A 20,000-square-foot office building or shopping center with a projected flow criteria of 0.1 gallon per square foot per day: 20,000 sf | x | 0.1g/sf/day | x | 1 EDU | x | $1,877.12 | = | $14,166.94 265g/day | | EDU [2] A fast-food restaurant with 70 seats and a projected flow criteria of 15 gallons per seat per day: 70 seats | x | 15 gal/day | x | 1 EDU | x | $1,877.12 | = | $7,437.65 Seat | | 265g/day | | EDU (7) Minimum fee. In no event shall the minimum connection fee as outlined above for any nonresidential building be less than $1,877.12. (8) Housing authorities and nonprofits. As required by N.J.S.A. 40:14B-22.3, connection fees to public housing authorities and nonprofit organizations building affordable housing projects that consists of new connections to the system are to be computed by providing a reduction of 50% in the connection fee established in this subsection. Connection fees to public housing authorities and nonprofit organizations building affordable housing projects that consist of replacement units for demolished or refurbished units, and for which a connection fee was previously paid, are to be computed by charging the lesser of the reduced rate of 50% of the connection fee established in this rate schedule or the connection fee established in this subsection, minus a credit in the amount of a connection fee previously paid for the housing units being replaced, provided the public housing authority and nonprofit organization can establish the connection fee previously paid. If the amount of the previous connection fee cannot be established, the reduced rate of 50% of the connection fee established in this subsection shall apply.
[Amended 6-9-1999 by Ord. No. 99-031 ; 12-2-2003 by Ord. No. 03-085 ; 6-26-2018 by Ord. No. 18-036 ; 11-14-2024 by Ord. No. 24-047 ]
Ask a question about Paterson law
Corpus searches the Paterson sections it holds and shows the ones that match, with their citations. Free, no sign-in.
