For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 435-67 — Backfilling methods and requirements

Code of the City of Paterson, New Jersey (eCode360 publication current through 2025-12-16) · Paterson City Code § 435-67

Corpus is an independent public-information project, not the official City of Paterson website. Stable reference: corpuslaw.us/code/92e30a1b-5b28-4412-8940-73c8cce65304

§ 435-67: Backfilling methods and requirements.

A. All pavement cuts, openings and excavations shall be properly made and backfilled. All backfill and fill shall be approved by the City. Backfill shall be placed in lifts that are no thicker than necessary to achieve the specified compaction with the equipment that is being utilized for compaction. Where ordered by the City, soil compaction and optimum dry density of backfill and fill, be it imported or native to the site, shall be determined in accordance with the most recent revision of ASTM D-1557 by a geotechnical laboratory, certified by the state. The geotechnical laboratory results, certified by an engineer that is licensed in the state is to be submitted to the City for approval. B. All backfill for trenches and excavations within the City's ROWs shall be approved imported granular backfill material. Backfill shall be placed from six inches above the top of pipe to the underside of paving to be placed. C. Unsuitable backfill shall consist of excavated material containing rejected organic matter, boggy, peaty humus or other unsuitable material such as silt, rubbish, waste, ash, or cinders. Frozen earth and any stones more than three inches in the largest dimension shall not be used for backfill or fill. D. Approved imported granular backfill shall consist of bank run sand and gravel. Bank run sand and gravel shall consist of hard, sharp, clean granular material, free of organic matter. The material shall be free of any considerable amount of flat, laminated, or elongated particles and shells, silt, clay, limestone, shale, or other deleterious matter. The material must be capable of compaction to the densities specified or required. The material shall contain no stones larger than three inches in their largest dimension, and no more than 10% of the material by weight shall pass a No. 200 sieve. A particle size analysis of backfill and fill, be it imported or native to the site, shall be determined in accordance with the most recent revision of ASTM D-422 by a geotechnical laboratory, certified by the State of New Jersey. The geotechnical laboratory result certified by an engineer that is licensed in the state, is to be submitted to the City for approval. E. If approved by the City, backfill shall consist of sand and gravel, approved blast furnace slag, or stone. Subbase material shall be free from organic or other deleterious materials. F. Gravel and crushed stone shall consist of hard, sharp, clean material, shall be free from fines, shells, clay, limestone, shale or other deleterious matter, and shall be supplied as a mixture of sizes with 5% to 10% of the material passing a No. 40 sieve and the remainder ranging in size from 3/8 inch to one inch. G. Dense graded aggregate and its installation shall be in accordance with Section 301 of the Standard Specifications for Road and Bridge Construction, NJDOT, 2007 or latest edition. H. Backfilling in any street opened or excavated pursuant to an excavation permit issued hereunder shall be compacted to a degree equivalent to that of the undisturbed ground in which the trench was dug. I. Backfill shall be placed to a subgrade such that it permits topsoil or pavement of the required depth to be placed and compacted to finished grade. As far as practicable, the underlying backfill shall be given time to settle through several heavy rains and by artificial wetting before the new topsoil or pavement is placed. J. Backfilling up to the first 18 inches above the top of utility pipes or similar installations shall be done with thin layers. Each layer is to be tamped by manual or mechanical means. Layers that are power-tamped shall not exceed four inches in thickness. The same requirements shall apply to the remainder of the backfilling if tamping is the method used for backfilling. Backfilling of all pipes of over 24 inches in diameter shall be carried up to the spring line of the pipe in three-inch layers, with each layer slightly moistened and not saturated and thoroughly tamped with suitable mechanical equipment. The backfill around all pipes 24 inches or less in diameter shall be flooded or tamped as specified above to a depth of 18 inches above the tops of the pipe before any additional backfilling is placed thereon. K. Whenever any excavation for the laying of pipe is made through rock, the pipe shall be laid six inches above the rock bottom of the trench, and the space under, around and six inches above the pipe shall be backfilled with clean river sand, noncorrosive soil or one-quarter-inch minus gravel. Broken pavement, stones and debris shall not be used in the backfill. L. The contractor shall provide additional material as required, to compensate for settlement of backfill and fill. M. Compaction of soils shall be achieved by the use of suitable methods and adequate equipment acceptable and approved by the Engineer. The minimum density to be obtained in compacting soils shall be the following percentages of "maximum dry density" as defined in ASTM D-1557, Moisture Density Relations of Soils (Modified Proctor Compaction Test), Method D: Location | Percentage Foundation material under slabs on grade, piping and other structures | 95% Backfilling of trenches | Compaction shall be 95% when pavement will be placed atop the backfill and 90% when grass will be placed atop the backfill N. Compacted fill and pavement courses not meeting required density when tested in place shall be replaced or reworked until additional tests, performed at contractor's expense, indicate compliance with the City's requirements. O. Subgrade for all pavements shall be compacted materials placed to the lines and grades required. P. Subbase: dense graded aggregate and its installation shall be in accordance with Section 301 of the Standards Specifications for Road and Bridge Construction, NJDOT, 2007 or latest edition. Q. Bituminous materials shall conform to NJDOT Standard Specification Section 902. Fine aggregate, course aggregate and mineral filler shall conform to NJDOT Standard Specification Section 901. R. Binder course shall be hot plant mix placed to the compacted thickness utilizing paving machinery approved by the owner. S. Aggregate for binder course shall be composed in such proportions that the resulting composite blend meets the following as per the NJDOT Table 901.11-1. Table 401-1: Sieve Size | Percentage Passing 2" | 100% 3/4" | 65% to 100% No 4 | 40% to 75% No 50 | 5% to 30% No 200 | 0% to 7% Bituminous Dense Surface Course (NJDOT Mix I-5): Aggregates for bituminous dense surface course shall be composed in such proportions that the resulting composite blend meets the following as per the NJDOT Table 901.11-1: Sieve Size | Percentage Passing 2" | 100% 3/4" | 70% to 100% No 4 | 30% to 80% No 50 | 10% to 35% No 200 | 5% to 12% T. A prime coat shall be applied to any and all layers of aggregate subbase prior to the placement of asphalt courses. The prime coat shall be allowed to cure properly prior to asphalt placement. No traffic will be permitted on aggregate subbases after prime coat has been placed. Tack coats shall be prepared and applied as specified in Section 904 of the NJDOT Standard Specifications for Road and Bridge Construction, 2007 or latest edition. U. All joints and key areas cut for the pavement restoration work shall be sealed in accordance with Section 914, Joint Materials, of the NJDOT Standards Specifications for Road and Bridge Construction, 2007 or latest edition. V. The contractor shall furnish and apply thermoplastic pavement stripes, markings, and symbols as necessary to replace disturbed pavement striping markings, and symbols in accordance with Section 912, Paints, Coatings, Traffic Stripes and Traffic Markings, of the Standard Specifications for Road and Bridge Construction, 2007 or latest edition. W. The temporary pavement shall be a layer of bituminous stabilized base course, six inches thick. Temporary pavement shall be allowed to settle for a period of not less than three months, but no more than six months, before final pavement is installed. X. The final pavement shall be installed by milling two inches from the temporary pavement and placing the surface course as required.

[Amended 10-13-2015 by Ord. No. 15-076 ]

Ask a question about Paterson law

Corpus searches the Paterson sections it holds and shows the ones that match, with their citations. Free, no sign-in.