For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 477-1 — Definitions

Code of the City of Paterson, New Jersey (eCode360 publication current through 2025-12-16) · Paterson City Code § 477-1

Corpus is an independent public-information project, not the official City of Paterson website. Stable reference: corpuslaw.us/code/769b68c6-8d62-4b7c-bcb2-ff43189ad6ea

§ 477-1: Definitions.

A. All definitions of words, terms, and phrases that are set forth in the Communications Act of 1934, P.L. 73-416,[1] as amended by various statutory enactments, including, but not limited to, the Telecommunications Act of 1996 P.L. 104-104, are incorporated herein and are made a part hereof. B. All definitions of the words, terms, and phrases that are set forth in the portion of the Middle Class Tax Relief and Job Creation Act of 2012, P.L. 112-96, as codified in 47 U.S.C. § 455, are incorporated herein and are made a part hereof. C. All definitions of words, terms, and phrases that are set forth in the New Jersey Municipal Land Use Law, N.J.S.A. 40:55D-1, et. seq., are incorporated herein and are made a part hereof. D. All of the definitions of words, terms, and phrases that are set forth in the Code of Federal Regulations at 47 CFR § 1.6002, as amended, are incorporated herein and are made a part hereof. E. In addition to the foregoing, the following words, terms, and phrases shall have the meanings indicated unless an alternate meaning clearly is discernable from the context in which the word, term, or phrase is used: APPLICANT The person or entity seeking to place a small wireless facility, cabinet or pole within the Municipal right-of-way that submits an application, and the agents, employees, and contractors of such person or entity. APPLICATION Either a new right-of-way installation application or an existing right-of-way installation application, submitted by an applicant to the City of Paterson for purposes of procuring a right-of-way permit. EXISTING RIGHT-OF-WAY INSTALLATION APPLICATION A formal written request in compliance with the requirements as established by the Township for right-of-way permit to construct or install a small wireless facility on an existing facility within a municipal right-of-way submitted by an applicant to the Township Engineer in accordance with this chapter. EXISTING SMALL WIRELESS FACILITY An existing small wireless facility that is in lawful existence within the municipal right-of-way. INSTALLATION The pole, cabinet and/or small wireless facility installed within the municipal right-of-way in accordance with a right-of-way permit. MUNICIPAL RIGHT(S)-OF-WAY, OR RIGHT(S)-OF-WAY, OR ROW The surface of, and the space above or below, any public street, road, lane, path, public way or place, sidewalk, alley, boulevard, parkway, drive, and the like, held by the Township as an easement or in fee simple ownership, or any other area that is determined by the City of Paterson to be a right-of-way in which the City of Paterson may allow the installation of small wireless facilities, cabinets and poles. This term shall also include county rights-of-way where the County requires the approval of the City of Paterson pursuant to N.J.S.A. 27:16-6 for the use of same. PERSONAL WIRELESS SERVICES As defined in 47 U.S.C. § 332(c)(7)(C), as supplemented and/or as amended. POLE A long, slender, piece of wood, metal, fiberglass composite, or other materials, including, but not limited to, decorative streetlights, nondecorative streetlights and traffic signal structures. RIGHT-OF-WAY PERMIT The permit issued by the Township following approval from the Township which sets forth that the applicant is in compliance with the requirements of this chapter. RIGHT-OF-WAY USE AGREEMENT An agreement that sets forth the terms and conditions for use of the municipal right-of-way. SMALL WIRELESS FACILITY As defined in the Code of Federal Regulations at 47 CFR § 1.6002(1), as supplemented and/or as amended. Small wireless facility means a wireless facility that meets both of the following qualifications: (i) each antenna is located inside an enclosure of no more than six cubic feet in volume or, in the case of an antenna that has exposed elements, the antenna and all of its exposed elements could fit within an imaginary enclosure of no more than six cubic feet; and (ii) all other wireless equipment attached directly to a utility pole associated with the facility is cumulatively no more than 25 cubic feet in volume. The following types of associated ancillary equipment are not included in the calculation of equipment volume: electric meter, concealment elements, telecommunications demarcation box, ground-based enclosures, grounding equipment, power transfer switch, cut-off switch, and vertical cable runs for the connection of power and other services. SMART POLE A decorative utility pole that conceals, disguises, or camouflages one or more small wireless facility installation(s) and may include other features such as street lighting, 911 call service access, public access Wi-Fi, sensors, digital signage, and surveillance cameras. A Smart pole must allow for multiple occupants and allow space for municipal use for other services and/or equipment. Smart poles shall neither have external latches, external hinges, nor external cabling. The pole should be made of an inherently rust-resistant material (i.e., aluminum alloys or stainless steel). UTILITY POLE A wooden or metal pole that is used by public utilities to support electrical wires, telephone wires, coaxial cables, fiber optic cables, like and similar appurtenances. F. In the event that a term, word, or phrase is not defined in any of the aforementioned statutes and is not otherwise defined herein then that term, word or phrase shall have its common, ordinary meaning. Editor's Note: See 47 U.S.C. § 151 et seq.

Ask a question about Paterson law

Corpus searches the Paterson sections it holds and shows the ones that match, with their citations. Free, no sign-in.