For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14-16-2-5(E) — NON-RESIDENTIAL – SENSITIVE USE ZONE DISTRICT (NR-SU)

Albuquerque, New Mexico Code of Ordinances (2026 S-96: current through Ordinance 2026-033, passed 8-17-2026) · Albuquerque Integrated Development Ordinance § 14-16-2-5(E)

Corpus is an independent public-information project, not the official City of Albuquerque website. Stable reference: corpuslaw.us/code/8ecc9d73-19c9-47ec-8803-83cd8c1038a7

2-5(E) NON-RESIDENTIAL – SENSITIVE USE ZONE DISTRICT (NR-SU)

2-5(E)(1) Purpose The purpose of the NR-SU zone district is to accommodate highly specialized public, civic, institutional, or natural resource-related uses that require additional review of location, site design, and impact mitigation to protect the safety and character of surrounding properties. Uses that require NR-SU zoning are not allowed in other zone districts. [image omitted; see the official PDF] 2-5(E)(2) Use and Development Standards The allowable uses and development standards of this zone district are applied on a case-by-case basis for primary uses that require the NR-SU zone district. Other allowable uses may be negotiated but shall not include any use that is not listed in Table 4-2-1. New development standards may be established or IDO standards may be modified by a Site Plan – EPC. Where the Site Plan is silent on any standard, IDO standards apply. Table 2-5-9: Other Applicable IDO Sections[1] Overlay Zones | Part 14-16-3 Allowable Uses | As negotiated from among those listed in § 14-16-4-2 Use-specific Standards | § 14-16-4-3 unless modified in the NR-SU approval process Dimensional Standards Tables and Exceptions | As applicable to the most similar use or district as shown in § 14- 16-5-1, unless different standards are approved in the NR-SU approval process Site Design and Sensitive Lands | § 14-16-5-2 unless modified in the NR-SU approval process Access and Connectivity | § 14-16-5-3 unless modified in the NR-SU approval process Subdivision of Land | § 14-16-5-4 unless modified in the NR-SU approval process Parking and Loading | § 14-16-5-5 unless modified in the NR-SU approval process Landscaping, Buffering, and Screening | § 14-16-5-6 unless modified in the NR-SU approval process Walls and Fences | § 14-16-5-7 unless modified in the NR-SU approval process Outdoor and Site Lighting | § 14-16-5-8 unless modified in the NR-SU approval process Neighborhood Edges | § 14-16-5-9 unless modified in the NR-SU approval process Solar Access | § 14-16-5-10 unless modified in the NR-SU approval process Building Design | § 14-16-5-11 unless modified in the NR-SU approval process Signs | § 14-16-5-12 unless modified in the NR-SU approval process Operation and Maintenance | § 14-16-5-13 unless modified in the NR-SU approval process [1] Some of the general controls in these sections may not apply to specific types of NR-SU zone districts or specific types of development if exempted by other provisions of this IDO. 2-5(E)(3) District Standards 2-5(E)(3)(a) Eligibility for Rezoning to NR-SU 1. A Zoning Map Amendment is required to establish or change allowable uses (i.e., specify permissive, conditional, accessory, or temporary uses) pursuant to § 14-16-6-7(G) (Zoning Map Amendment – EPC) or § 14-16-6-7(H) (Zoning Map Amendment – Council), as applicable. 2. A Site Plan – EPC is required to establish development standards and/or modify IDO development standards and document allowed uses pursuant to § 14-16-6-6(I). 3. A Zoning Map Amendment shall be voided if a related Site Plan – EPC is not approved and signed-off pursuant to § 14-16- 6-4(O)(4) (Conditions on Approvals). 2-5(E)(3)(b) Allowable Uses and Use-specific Standards 1. The following uses require an NR-SU zone district: a. Airport. i. See § 14-16-3-3(C) (Airport Protection Overlay Zone Use Regulations) for Use-specific Standards for private airport aircraft landing fields, airport runways, and taxiways. ii. A cumulative impacts analysis may be required at the time of application submittal for projects within the Railroad and Spur Small Area pursuant to § 14-16-5-2(E) (Cumulative Impacts) and § 14-16-6-4(H) (Cumulative Impacts Analysis Requirements). b. Cemetery. c. Correctional facility. d. Crematorium. e. Fairgrounds. f. Natural resource extraction. i. This use must obtain all applicable State and federal permits or approvals for the activity and comply with the terms of those permits and approvals throughout the duration of the activity. ii. This use must comply with air quality permitting requirements found in Part 9-5 of ROA 1994 (Air Quality and Environmental Health Control). iii. Extraction working areas shall be set back at least 200 feet from each property line of the site adjacent to any Residential zone district, and at least 100 feet from each property line of the site with any other zone district. iv. This use is prohibited in the following locations: a. Within 330 feet of Major Public Open Space. b. Within 1,000 feet of a lot containing a religious institution; elementary, middle, or high school; or residential use other than an accessory dwelling unit used for a caretaker in a non-residential development. v. Within the Airport Protection Overlay Zone, mining only is permissive in the Noise Contour Sub-area. See § 14-16-3-3(C) (Airport Protection Overlay Zone Use Regulations). vi. A cumulative impacts analysis may be required at the time of application submittal for projects within the Railroad and Spur Small Area pursuant to § 14-16-5-2(E) (Cumulative Impacts) and § 14-16-6-4(H) (Cumulative Impacts Analysis Requirements). g. Solid waste convenience center. i. This use is prohibited within 330 feet of Major Public Open Space. ii. A cumulative impacts analysis may be required at the time of application submittal for projects within the Railroad and Spur Small Area pursuant to § 14-16-5-2(E) (Cumulative Impacts) and § 14-16-6-4(H) (Cumulative Impacts Analysis Requirements). h. Stadium or racetrack. i. Waste and/or recycling transfer station. i. This use is prohibited within 330 feet of Major Public Open Space. ii. A cumulative impacts analysis may be required at the time of application submittal for projects within the Railroad and Spur Small Area pursuant to § 14-16-5-2(E) (Cumulative Impacts) and § 14-16-6-4(H) (Cumulative Impacts Analysis Requirements). 2. Uses that require a Zoning Map Amendment to NR-SU are not allowed in other zone districts. 3. Uses listed in Table 4-2-1 may be approved as allowable on the same premises as a primary NR-SU use if they are found to be compatible with or complementary to the proposed primary use, pursuant to § 14-16-6-7(G) (Zoning Map Amendment - EPC) or § 14-16-6-7(H) (Zoning Map Amendment - Council), as relevant. 4. Uses approved in an NR-SU zone district shall be subject to the relevant Use-specific Standards or any other standards deemed appropriate and necessary by the relevant decision-making body, except that Conditional Use Approvals are not required, since NR-SU requires a Site Plan to be reviewed and decided by the EPC to establish appropriate development standards to mitigate potential impacts pursuant to § 14-16-6-6(I) (Site Plan – EPC). 2-5(E)(3)(c) Development Standards 1. General A Site Plan – EPC is required pursuant to § 14-16-6-6(I) (Site Plan – EPC) to establish development standards and/or modify IDO development standards. Where the Site Plan is silent on any standard, IDO standards apply. 2. Parking a. The minimum off-street parking requirements for uses that require an NR-SU zone district are specified in Table 2-5-10, unless modified in the NR-SU approval process. Table 2-5-10: Minimum Off-street Parking Requirements GFA = Gross Floor Area Design Capacity = Maximum occupancy per building or fire codes, whichever is greater NR-SU Primary Uses | IDO Parking Requirement Airport | Determined by airport management Cemetery | No requirement Correctional facility | 4 spaces / 2,500 sq. ft. GFA Crematorium | 2 spaces / 2,500 sq. ft. GFA Fairgrounds | 8 spaces / 2,500 sq. ft. of site area where attendees circulate, participate, or watch activities Natural resource extraction | No requirement Solid waste convenience center | No requirement Table 2-5-10: Minimum Off-street Parking Requirements GFA = Gross Floor Area Design Capacity = Maximum occupancy per building or fire codes, whichever is greater NR-SU Primary Uses | IDO Parking Requirement Stadium or racetrack | 1 space / 5 seats in main assembly area[1] Waste and/or recycling transfer | No requirement station [1] 30 in. bench space = 1 seat. If the minimum off-street parking requirement is for seats in a main assembly area, but the proposed main assembly area will not have seats, then the measurement shall be 1 space / 3 persons design capacity. b. Parking for other uses listed in Table 4-2-1 shall be provided pursuant to § 14-16-5-5 (Parking and Loading), unless modified in the NR-SU approval process. 2-5(E)(3)(d) Provisions for Specific Areas Approved Site Plans are on file with the City Clerk.

Ask a question about Albuquerque law

Corpus searches the Albuquerque sections it holds and shows the ones that match, with their citations. Free, no sign-in.