Sec. 16-381. - Design and construction requirements.

(a) In accordance with generally applicable construction or building codes, grantee shall not construct any cable system facilities until grantee has secured the necessary permits from grantor. (b) In those areas of the city where transmission lines or distribution facilities of the public utilities providing telephone and electric power service are both underground, the grantee likewise shall construct, operate and maintain any new transmission and distribution facilities therein underground. (c) In those areas of the city where the grantee's cables are located on the above-ground transmission or distribution facilities of the public utility providing telephone or electric power service, and in the event that the facilities of both such public utilities subsequently are placed underground, then the grantee likewise shall reconstruct, operate and maintain its transmission and distribution facilities underground, at grantee's cost. Certain of grantee's equipment, such as pedestals, amplifiers and power supplies, which normally are placed above ground, may continue to remain in above-ground enclosures, unless otherwise provided in the franchise agreement. (d) The grantee may be required to establish all services in new subdivisions underground. Upon receipt of reasonable advance written notice, to be not less than five business days, the grantee may also be required to relocate its facilities underground where feasible, at the city's sole discretion, at such time as the city is completely reconstructing any street. Upon its receipt of advance written notice, to be not less than five business days, the grantee may be required to relocate facilities that are located in the way of construction projects. An additional penalty may be assessed on a daily basis, up to $200.00 a day which represents the potential costs the city would incur for extended traffic control on any given project if the city has to wait on the grantee. (e) Any major changes to the cable system in, upon, along, across, under or over the public ways shall be made under the direction of grantor's city engineer or a designee, who shall, if the proposed change, extension or construction conforms to the provisions hereof, issue written permits therefor in compliance with generally applicable existing building codes. The height above public thoroughfares of all aerial wires shall conform to the requirements of the New Mexico Public Utilities Council or other regulatory body having jurisdiction thereof. (1) All transmission and distribution structures, lines and equipment erected by the grantee shall be located so as not to interfere with the proper use of the public ways, and to cause minimum interference with the rights or reasonable convenience of property owners who adjoin any of the said public ways, and not to interfere with existing public utility installations. (2) In the event that any property or improvement of the grantor in the public way is disturbed or damaged by the grantee or any of its contractors, agents or employees in connection with undertaking any and all work pursuant to the right granted to the grantee pursuant to this article and the franchise agreement, the grantee shall promptly, at the grantee's sole cost and expense, restore as nearly as practicable to their former condition said property or improvement which was so disturbed or damaged, and in the event that any such property or improvement shall at a later time become uneven, unsettled or otherwise require restoration, repair or replacement because of such disturbance or damage by the grantee, then the grantee, as soon as reasonably possible upon receipt of notice from the grantor and at the grantee's sole cost and expense, restore as nearly as practicable to their former condition said property or improvement which was disturbed or damaged. Any such restoration by the grantee shall be made in accordance with such materials and specifications as may, from time to time, be then provided for by grantor ordinance. Grantee shall only be responsible for maintaining such restoration or repairs for a period not to exceed 18 months from completion of the original repair. (3) Prior to commencing any work in the public way, the grantee shall obtain any and all permits lawfully required by such grantor codes and ordinances of general application for such work. In the event that emergency work may be required by the grantee, however, the grantee shall obtain any and all such permits within three working days after the beginning of such emergency work. (4) There shall be no unreasonable or unnecessary obstruction of the public way by the grantee in connection with any of the work herein provided for, and the grantee shall maintain such barriers, signs and warning signals during any such work performed on or about the public way or adjacent thereto as may be necessary to reasonably avoid injury or damage to life and property. (5) If at any time during the period of this article the grantor shall lawfully elect to alter or change the grade or location of any street, alley or other public way, the grantee upon reasonable notice from the grantor, to be not less than 90 days, shall remove, relay and relocate its poles, wires, cables, underground conduits, manholes and other fixtures at it own expense, and in each instance comply with the reasonable requirements of the grantor. If public funds are available to offset grantee's expenses as described in this section, grantee may request use of such funds, and grantor may make reasonable efforts to assist grantee in such request. (6) The grantee shall not place poles, conduits or other fixtures above or below ground where the same will interfere with any gas, electric, telephone fixtures, water hydrants or other utility, and all such poles, conduits or other fixtures placed in any street shall be so placed as to comply with all generally applicable ordinances of the grantor. (7) The grantee shall, on request of any person holding a moving permit issued by the grantor, temporarily move its wires or fixtures to permit the moving of buildings, the expense of such temporary removal to be paid, or at grantee's request, prepaid by the person requesting the same, and the grantee shall be given not less than seven working days advance notice to arrange for such temporary changes. (8) The grantee may be asked by the grantor to permit the joint use of its property and appurtenances located in the public way insofar as such use may be reasonably practical and upon reasonable rental therefor. (f) In the event of a failure by grantee to complete any work required herein or by any other generally applicable law or ordinance, or if such work is not completed within the reasonable time specified in the written notice received from grantor or, if grantee does not commence such work within such period and diligently complete the work thereafter (except in cases of emergency constituting a threat to public health, safety or welfare), grantor may take the steps afforded in this article or such other steps or remedies available under the law.

(Ord. No. 1711, § 21, 11-16-98)