§ 30-317 — Mechanical inspections
Municipal Code of the City of Las Cruces, New Mexico (Supp. No. 34: codified through Ordinance No. 3114, adopted June 1, 2026) · Las Cruces Development Code § 30-317
Corpus is an independent public-information project, not the official City of Las Cruces website. Stable reference: corpuslaw.us/code/e485f3c3-50f8-4212-a560-8f38969d4cab
Sec. 30-317. - Mechanical inspections.
Under this division, the following mechanical inspections shall be required: (1) Duct groundwork rough-in. This inspection includes all underground duct work covered by the permit. The inspection shall be called for after the duct has been installed and secured in the ground, and before the concrete enclosure has been placed. (2) Heating/air conditioning rough-in. This inspection shall include all permitted above grade duct work, vents and refrigeration piping that will be covered or concealed. This inspection shall be called for before any of the above-grade ducts, vents and refrigeration piping are covered or concealed. (3) Other mechanical inspections. Heating/air conditioning final—Final inspection shall be made after all duct work is covered and all registers, grills and furnaces are installed and connected. This inspection may be done at the plumbing and gas final.
(Ord. No. 2478, § I, 11-17-08)
Ask a question about Las Cruces law
Corpus searches the Las Cruces sections it holds and shows the ones that match, with their citations. Free, no sign-in.
