Sec. 30-394. - Submittal requirements.

The following describes appropriate material required to be submitted for each permit application submitted under division 8: (1) Completed application to include property owner's signature, contractor's name and license number. (2) Written approval from adjacent property owners if extending existing wall/fences on property lines only. (3) Plan review fee; (4) Permit fee (required at time of permit issuance); (5) Construction drawings. Construction drawings shall be blueline or similar process and drawn to accurately display appropriate information, the minimum scale to be one-quarter inch = 1.0 foot. Blueline copies shall consist of the following drawings (smaller scale may be approved by the plan reviewer): a. Site plan, if applicable. The site plan shall be blueline or similar process on a sheet of paper measuring at least 8½ inches x 11 inches. Copies provided shall be legible and at a scale that accurately represents the information thereon. 1. Name, address, phone number, and license number of builder/contractor (if applicable). 2. Date of preparation, north arrow, and written and graphic scales. 3. General legal description of subject property. If the tract is not within an approved and on-file subdivision, a vicinity map must be included showing the exact location of the property. The site plan shall include the entire lot or tract. 4. Boundary lines, including dimensions and angles. 5. All adjacent streets, public rights-of-way, and easements shall be shown and labeled. 6. Indicate grades for front yard, pad, finished floor, backyard and existing grades outside property line. b. Design and specification drawings for all masonry walls and retaining walls. The applicant shall submit a design and specifications, signed and stamped by an engineer registered to practice in the state. Expiration of plan review. Plan review submittals will expire after 180 days if either no approval or issuance of a building permit has been attained.

(Ord. No. 2478, § I, 11-17-08)

Ask a question about Las Cruces law

Corpus searches the Las Cruces sections it holds and shows the ones that match, with their citations. Free, no sign-in.