Sec. 30-598. - Submittal requirements.

(a) The following material is required for each type of permit application submitted under division 14: (1) Completed application, to include property owner's signature, contractor's name and license number; (2) Plan review fee; (3) Building permit fee (required at time of permit issue); (4) Site plan. The site plan shall be either blueline or a similar process on paper measuring at least 8½ x 11 [18 x 24] inch sheet of paper. Copies submitted shall be legible and at a scale that accurately represents the information. The following information is required on all site plans: a. Name, address, phone number and license number of builder/contractor (if applicable); b. Date of preparation, north arrow, and written and graphic scales; c. General legal description of subject property. If the tract is not within an approved and filed subdivision, a vicinity map must be included showing exact location of property. Site plan shall include the entire lot or tract; d. Boundary lines, including dimensions; e. All adjacent streets, public rights-of-way, and easements shall be shown and labeled; f. Zoning, or proposed zoning, of subject parcel of land; g. Required setback lines, shown as dashed lines and labeled; h. All structures and storage tanks, accurately located and labeled on site plans, including accessory structures, porches, carports, patios, concrete slabs, etc.; i. All dimensions, shown from the closest point between any parts of a structure (e.g., dwelling, porch, carport, etc.) and at right angles from the property line; j. Type of material being stored within the tanks. (b) The following criteria from the city fire and emergency services department shall be met before a permit can be obtained and excavation begins. The following information must be stated or shown on submitted plan sets before a building permit can be issued: (1) Underground utilities will be checked by appropriate service department and marked in the excavation area. (2) Work area to be flagged or roped off to prevent pedestrian access into the area. (3) No smoking, on excavation site. (4) Grounding of the backhoe tractor, to be in effect before and during a dig. (5) Product will be drained, and tanks will be rendered inert or purged to comply with state environmental department regulations. (6) Tools that come in contact with or that could come in contact with any part of the piping, tank or lines will be of the nonsparking type. (7) All holes capped for transport, except for a one-eighth-inch vent hole, required for pressure release only. (8) State environmental department personnel shall be contacted and present during excavation to monitor readings before and during excavations, to obtain the lower explosive limit of vapor in the tank. (9) Charged fire extinguisher on hand in work area (2-A, 20-B, C). (10) Omissions of any and all of these actions could result in cessation of excavation activities until compliance is achieved, or issuance of citations. Expiration of plan review. Plan review submittals will expire after 180 days if either no approval or issuance of a building permit has been attained.

(Ord. No. 2478, § I, 11-17-08)

Ask a question about Las Cruces law

Corpus searches the Las Cruces sections it holds and shows the ones that match, with their citations. Free, no sign-in.