Sec. 34-133. - Stormwater discharge from construction activities.
(a) Manual. All operators of construction sites with a disturbed area of one (1) acre or more shall use the methodology on BMPs and SWPPP development from the state department of transportation "Storm Water Management Guidelines for Construction & Industrial Activities" 2002 manual, appendices, and all addenda. The city may, by resolution, adopt a stormwater quality best management practices for construction activities manual. Alternate BMPs may be submitted for consideration at any time. (b) Inspection. Qualified personnel (provided by the operator of the construction site) shall inspect disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, structural control measures, and locations where vehicles enter or exit the site, at least twice a month, (or as required by law) and within 24 hours of the end of a rainfall event that is 0.5 inches or greater. Disturbed areas and areas used for storage of materials that are exposed to precipitation shall be inspected for evidence of or the potential for pollutants entering the drainage system. Erosion and sediment control measures identified in the SWPPP shall be observed by the operator to ensure that they are operating correctly. Where discharge locations or points are accessible, they shall be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to receiving waters or the MS4. Locations where vehicles enter or exit the site shall be inspected for evidence of off-site sediment tracking on a daily basis. (c) Erosion and sediment control plan. All operators of sites of construction activity, including clearing, grading, and excavation activities, that result in the disturbance of one or more acres of total land area, or that are part of a common plan of development or sale within which one or more acres of total land area are disturbed, or who are required to obtain an NPDES permit for stormwater discharges associated with construction activity, shall include an erosion and sediment control plan in the plan set, 18″ × 24″ minimum. (d) Certification. Any operator who is required to obtain coverage for stormwater discharges from a construction site under the NPDES general permit for stormwater discharges from construction sites ("the construction general permit") shall submit a signed copy of the following certification prior to commencement of work: I certify under penalty of law that I understand the terms and conditions of the National Pollutant Discharge Elimination System (NPDES) Construction General Permit(63CFR 36506) that authorizes stormwater discharges associated with construction activity from the site identified as part of this certification. Prior to any earthwork or clearing a Notice of Intent (NOI) will be approved by EPA Region Six for this project and I understand I must keep a copy of my Stormwater Pollution Prevention Plan (SWPPP) on site, or posted location thereof, available for public viewing. I understand that my project shall not damage the city of Las Cruces' municipal stormwater system (MS4). The certification must include: (1) Address of site. (2) Legal description of property. (3) Property owner's name, address and phone. (4) Contractor's name, address and phone number, if applicable. (5) SWPPP preparer's name, address and phone. (6) Start and end date of construction. (7) Acreage of disturbed area. (e) Operator changes. For stormwater discharges from construction sites where the operator changes, an NOI shall be accepted by EPA prior to the operator commencing work at the site. The NOI must be signed by an officer of the company. (f) Additional requirements. Additional requirements which may be requested from operator could include: (1) Location of all easements and rights-of-way; (2) The delineation, if applicable, of the 100-year floodplain, including the flood fringe and floodway, if available, and any on-site or adjacent wetlands; (3) Percolation test results for all areas with retention ponds or other facilities designed for infiltration and a description of techniques to be used to prevent the clogging of soil pores by fine sediment; (4) A description of the approximate area of the watershed above the site, including the vegetative coverage and impervious surfaces; (5) SWPPP; (6) The NOI. (g) Denial and review. The director of public works may deny approval of any building permit, grading permit, subdivision plat, site development plan, or any other city approval necessary to commence or continue construction, or to assume occupancy, on the grounds that the management practices described in the plans, or observed upon a site inspection by city personnel, are determined not to control and reduce the discharge of sediment, silt, earth, soil, and other materials associated with clearing, grading, excavation, and other construction activities to the maximum extent practicable. Together with written notification to the applicant that the approval sought is denied, the director of public works shall provide the applicant a written explanation of the reasons for the denial. The applicant may request review of the decision made by the director of public works by the development review committee. Any such request for review shall be made within ten days of the date the applicant receives notification of the decision by the director of public works. The decision whether or not to review the decision shall be within the sole discretion of the committee, and may be limited to written materials considered by the committee to be relevant. (h) Increase in minimum standards. The director of public works may require implementation of more than the minimum stormwater standards if arroyos on-site or immediately downstream of a site show evidence of increased flooding, accelerated erosion, channel erosion of sedimentation, as a direct result of conditions on the site. Increased requirements shall be limited to the following on-site measures: (1) Erosion control measures extended to a broader area of the site than the development area; (2) Revegetation of highly eroded areas; (3) Arroyo restoration or other erosion control measures within highly eroded channels; or (4) A combination of the above measures. (i) Waivers. If a waiver is granted by EPA, the operator will not be required to sign the certification for permit. However he must still comply with the general and specific prohibitions and may still be required to have a SWPPP. Specifically he must ensure no harmful substances are introduced into the MS4 or groundwater by mechanical means. It is the operator's sole responsibility to meet the requirements of the waiver. If the operator fails to meet the requirements of the waiver, he shall be required to comply with this section prior to expiration of the waiver. Failure to do so will constitute a knowing violation of this section. (j) Notification or permitting by other agencies. Activities permitted by this section may also require notification or permitting by other agencies, including but not limited to written approval from the Elephant Butte Irrigation District or other official watercourse related organization, the federal Environmental Protection Agency, the United States Army Corps of Engineers, the Federal Emergency Management Agency (FEMA) and the state environment department. It is the responsibility of each applicant to determine whether additional notification or permitting is required. (k) Maintenance responsibilities for stormwater systems. (1) The stormwater management system shall be maintained in good condition and promptly repaired. Maintenance shall include the repair and restoration of all grade surfaces, walls, swales, drains, dams, ponds, basins, site restoration measures, associated vegetation, and any other stormwater measure constructed on site. Such maintenance shall be in accordance with the National Pollutant Discharge Elimination System Manual Storm Water Management Guidelines for Construction and Industrial Activities, latest version. (2) All stormwater management measures and facilities shall be maintained by the fee simple owner of the property or a homeowners association, unless a dedication of the stormwater management system has been required or accepted by the city, in which case, the city shall be responsible for maintenance. (3) Prior to project construction plan approval by the city, applicants must ensure implementation and maintenance of the BMPs. Applicants shall propose a maintenance agreement assuring that all permanent BMPs will be maintained throughout the "use" of the project site, satisfactory to the public works department. (4) For all properties, the verification mechanism will include the applicant's signed statement, as part of the construction permit application, accepting responsibility for all permanent BMP maintenance, repair and replacement. (l) Maintenance agreement. The maintenance agreement shall include the following: (1) Operation and maintenance (O&M) plan. The applicant shall include an operation and maintenance (O&M) plan, prepared satisfactory to the city, with the approved maintenance agreement, which describes the designated responsible party to manage the stormwater BMP(s), employee's training program and duties, operating schedule, maintenance frequency, routine service schedule, performance bond up to 15 years, specific maintenance activities (including maintenance of storm drain inlet markers), copies of resource agency permits and any other necessary activities. At a minimum, maintenance agreements shall require the applicant to provide inspection and servicing of all permanent BMPs on an annual basis. The project proponent or city-approved maintenance entity shall complete and maintain O&M forms to document all maintenance requirements. Parties responsible for the O&M plan shall retain records for at least five years. These documents shall be made available to the city for inspection upon request at any time. (2) Access easement/agreement. Unless the applicant accepts permanent maintenance responsibilities, the applicant shall execute an access easement, if needed, to the official maintenance entity that shall be binding on the land throughout the life of the project, until such time that the permanent treatment BMP requiring access is no longer required to be in use, satisfactory to the city. (3) Maintenance violations. If, after notice by the city to correct a violation requiring maintenance work, satisfactory corrections are not made by the owner(s) or responsible party within a reasonable period of time, the city may perform all necessary work to place the facility in proper working condition. The owner(s) or responsible party of the facility shall be assessed the associated costs of the work and shall reimburse the costs for said work.
(Ord. No. 2146, § I, 11-1-04)