§ 150.25 — RULES OF CONSTRUCTION; DEFINITIONS
Municipal Code, City of Rio Rancho, New Mexico (Code 2026-04-23) · Rio Rancho Municipal Code § 150.25
Corpus is an independent public-information project, not the official City of Rio Rancho website. Stable reference: corpuslaw.us/code/ab7d24d4-24c8-4c6f-965b-751450ac91ac
§ 150.25: RULES OF CONSTRUCTION; DEFINITIONS.
(A) Construction. For the purposes of administration and enforcement of this subchapter, unless otherwise stated, the following rules of construction shall apply: (1) In cases of any difference of meaning or implication between the text of this subchapter and any caption, illustration, summary table or illustrative table, the text shall control. (2) The word “shall” is always mandatory and not discretionary; the word “may” is permissive. (3) Words used in the present tense shall include the future and words used in the singular number shall include the plural and the plural, the singular, unless the context clearly indicates the contrary. (4) The word “persons” includes an individual, a corporation, a partnership, an incorporated association, a governmental entity or any other similar entity. (5) The word “includes” shall not limit a term to the specific example but is intended to extend its meaning to all other instances or circumstances of like kind or character. (6) Words used in the masculine include the feminine and vice versa. (B) Definitions. For the purpose of this subchapter, the following definitions shall apply unless the context clearly indicates or requires a different meaning. ACCOUNTS. A method of tracking and monitoring the impact fee revenues and expenditures segregated by the category of capital improvements (roads, bikeways and trails, parks, public safety, water utilities and drainage facilities). APPLICANT. The person, including governmental entities, seeking a zoning plan check, development approval, a building permit, a refund or a credit, whichever is applicable. ASSESSMENT. The determination of the amount of the impact fee, the applicable fee schedule, or both; whichever is appropriate. BUILDING PERMIT. The permit as required by the General Construction Industries Commission of the state, as administered pursuant to the construction standards of the city, by the Building Inspection Division and the Department of Development Services, as set forth in Chapter 151, Building Regulations. CAPITAL IMPROVEMENTS. Any of the following facilities that have a life expectancy of 10 or more years and are owned and operated by or on behalf of the city: (1) Roadway facilities, including roads, bridges, bus bays, rights-of-way, traffic signals, landscaping and any local components of state and federal highways; (2) Bikeways and trails; (3) Parks, recreational areas, open space trails and related areas and facilities; (4) Buildings for fire, police and rescue and essential equipment costing $10,000 or more and having a life expectancy of 10 years or more; (5) Water and wastewater facilities, including wells, transmission mains, storage reservoirs, collection mains, lift stations, wastewater treatment plants; and (6) Drainage facilities, including regional facilities typically constructed by the Southern Sandoval County Arroyo Flood Control Authority and local facilities typically constructed by the City of Rio Rancho. Regional facilities include stormwater conveyances of more than 500 cubic feet per second. CAPITAL IMPROVEMENTS PLAN. (See IMPACT FEES CAPITAL IMPROVEMENTS PLAN.) CAPITAL IMPROVEMENTS PLAN CITIZEN ADVISORY COMMITTEE, or CIPCAC. The standing committee appointed by the Governing Body to advise the city in the preparation, implementation and update of the impact fees. COLLECTION. The payment of the applicable impact fees. COMMERCIAL. The type of development which is consistent with, but not exclusive to, the C-1, retail commercial zoning designation. COMPREHENSIVE PLAN or MASTER PLAN. The Vision 2020 Integrated Comprehensive Plan, adopted June 2001, in accordance with NMSA 1978 § 3-19-9, as may be subsequently amended. CREDIT. The value of payments, contributions, dedication and improvements made by development towards the cost of existing or future system improvements, as defined herein. CREDIT HOLDER. The person entitled to transfer, apply or seek reimbursement for credit or excess credit. DEEMED COMPLETE. An applicant has submitted an application for a building permit, with the applicable fees, and the application and fees have been accepted by the city. DEVELOPER. Any person or legal entity undertaking development. DEVELOPMENT. The subdivision of land, reconstruction, redevelopment, conversion, structural alteration, relocation or enlargement of any structure or any land use, change of land use or extension of the use of land which increases the number of service units. DEVELOPMENT AGREEMENT. The written agreement between the developer and the city for construction of system improvements which memorializes the terms of construction, the estimated cost of the system improvements, the schedule for initiation and completion of the system improvements, a requirement that the system improvements be completed to accepted city standards, and such other terms and conditions as deemed necessary by the city. DEVELOPMENT APPROVAL. Written authorization, such as approval of a rezoning application or issuance of a building permit or other forms of official action required by the city prior to commencement of construction. DIRECT ACCESS IMPROVEMENTS. The portion of roadway facilities built off site but adjacent to new development which serves the needs of the new development. DIRECT ACCESS IMPROVEMENTS do not include through lanes or other necessary components of any arterial or collector street, but are limited to traffic signals, acceleration/deceleration lanes or other minor improvements which primarily serve traffic entering a development project from the major road system. DWELLING UNIT or DU. One or more rooms and a single kitchen designed as a unit for occupancy by one family for living and sleeping purposes, but not including a recreation vehicle or travel trailer. ECONOMIC BASE DEVELOPMENT. An enterprise that exports 60% or more of its products or services outside of the state. EFFECTIVE DATE. The date on which this subchapter, or amendments to this subchapter, becomes effective. ENCUMBERED. Funds committed for a specified improvement on a specified time schedule. EXCESS CREDIT. That portion of the credit granted to the credit holder for system improvements which exceeds the value of the impact fees otherwise due from the development. EXEMPTION. Development which satisfies the criteria in Section 150.31 and, therefore, is released from the obligation of paying all or a portion of the impact fees otherwise due for the development. FACILITY EXPANSION. The expansion of the capacity of an existing facility that serves the same function as an otherwise necessary new capital improvement, in order that the existing facility may serve new development. The term does not include the repair, maintenance, modernization or expansion of an existing facility to improve service to existing development. FUNCTIONAL POPULATION. The number of “full time equivalent” people present at the site of a land use. FUNCTIONAL POPULATION can also be defined as the number of people occupying space in the city or service area on a 24-hour-per-day, sevenday-per-week basis, and who are required to be served by capital improvements. GROSS FLOOR AREA. The sum of all the floor areas of a building or buildings, measured from the exterior of the supporting walls or supporting devices, including all accessory buildings on the same lot, but excluding vehicle parking structures or pedestrian walkways which are accessory, ancillary, or supportive to a principal use. IMPACT FEE. A charge or assessment imposed by the city on new development in order to generate revenue for funding or recouping the costs of capital improvements or facility expansions necessitated by and attributable to new development. The term includes amortized charges, lump-sum charges, capital recovery fees, contributions in aid of construction, development fees and any other fee that functions as described by this definition. IMPACT FEES ADMINISTRATOR. The Director of the Department of Development Services or designee, when administering this subchapter. IMPACT FEES CAPITAL IMPROVEMENTS PLAN, or IFCIP. A plan required by the New Mexico Development Fees Act that identifies capital improvements or facility expansions for which impact fees may be assessed. In NMSA 1978 § 5-8-6, it is referred to as the Capital Improvement Plan (CIP); it is referred to herein as the IFCIP. The IFCIP is to be distinguished from the local Infrastructure Capital Improvements Plan (ICIP) which sets forth an inventory of existing capital improvements deficiencies, planned capital projects and sources of funding for these projects which sources may or may not include impact fees, and from the Budget Capital Improvements Plan which governs general fund allocations for capital improvements. INDEPENDENT FEES DETERMINATION. A finding by the Impact Fees Administrator that an independent fee study does or does not meet the requirements for such a study as established by this subchapter and, if the requirements are met, the fee calculated by the Impact Fees Administrator therefrom. INDEPENDENT FEES STUDY. The engineering, financial and/or economic documentation prepared by the applicant in accordance with Section 150.32 to allow individual determination of a development or land use specific impact fee other than by use of the applicable fee schedule. INDUSTRIAL/WAREHOUSE. The type of development which is consistent with, but not exclusive to, uses permitted in zoning districts with a designation of C-2: wholesale and warehousing commercial district or M-1: industrial and business park district. INFRASTRUCTURE CAPITAL IMPROVEMENTS PLAN, or ICIP. The ICIP is a multi-year plan that identifies planned capital improvements and infrastructure, an inventory of existing infrastructure and capital projects, plus sources of funding for proposed capital projects. The projects and funding sources in the ICIP are identified in the city’s annual budget which may include impact fees as one of the funding sources. LAND USE ASSUMPTIONS, or LUA. The land use assumptions adopted or as may be amended by the Governing Body, pursuant to the New Mexico Development Fees Act, NMSA 1978 §§ 5-8-19, 5-8-28, 5-8-30, 5-8-31 and 5-8-36. The LAND USE ASSUMPTIONS are incorporated herein by reference. LEVEL OF SERVICE or LOS. A measure of the relationship between service capacity and service demand for public facilities in terms of demand to capacity ratios or the comfort and convenience of use or service of public facilities or both. Minimum LEVEL OF SERVICE refers to the minimum standard adopted by the Governing Body upon which these impact fees have been calculated in order to provide for the health and safety of the functional population of the community. MOBILE HOME. A transportable structure built on a chassis and designed to be used as a permanent dwelling with or without a permanent foundation when connected to the required utilities. MULTI-FAMILY. The type of development, other than single-family dwelling units, which is consistent with, but not exclusive to, uses permitted in zoning districts with a designation of R-3: mixed residential district, or R-6: multi-family residential district. NONRECOUPMENT IMPACT FEES. Impact fees collected by the city for purposes other than recoupment, as defined herein. OFFICE/INSTITUTIONAL. A type of development which is consistent with, but not exclusive to, uses permitted in zoning districts with a designation of O-1: office district. OFFSET. The amount by which an impact fee is reduced to fairly reflect the credits applied for system improvements. OWNER OF RECORD. The person whose name appears in the property title records of either Bernalillo County or Sandoval County for a property subject to the terms of this subchapter. PLAN CHECK. (See ZONING PLAN CHECK.) POST-SUBCHAPTER CREDIT. Credit for dedications, contributions or construction of system improvements accepted by the city after the effective date of this subchapter as defined herein. PRE-SUBCHAPTER CREDIT. Credit for dedications, contributions or construction of system improvements accepted by the city prior to the effective date of this subchapter as defined herein. PRESENT VALUE. The current value of past, present or future payments, contributions or dedications of goods, materials, construction or money, taking into account, when appropriate, depreciation and inflation. PROJECT IMPROVEMENTS. Site specific improvements or facilities that are planned, designed or built to provide service for a specific development project and that are necessary for the use and convenience of the occupants or users of that project, and that are not system improvements. The character of the improvement shall control a determination of whether an improvement is a PROJECT IMPROVEMENT or a system improvement, and the physical location of the improvement on site or off site shall not be considered determinative of whether an improvement is a PROJECT IMPROVEMENT or a system improvement. No improvement or facility included in a plan for public facilities approved by the Governing Body shall be considered a PROJECT IMPROVEMENT. No improvement that is the same type of facility included in the calculation of an impact fee shall be considered a PROJECT IMPROVEMENT. If an improvement or facility provides or will provide more than incidental service or facilities capacity to persons other than users or occupants of a particular project, the improvement or facility shall not be considered a PROJECT IMPROVEMENT. Nothing in this definition restricts, constrains or reduces the need for a development to construct, or contribute to, a project that is not a PROJECT IMPROVEMENT, and receive no credit or compensation for, if such improvement is not listed in the city’s IFCIP. Direct access improvements to the particular development are PROJECT IMPROVEMENTS. PROPORTIONATE SHARE. s The portion of the cost of system improvements which is reasonably and fairly related to the service demands and needs of a project. PUBLIC SAFETY. Fire, police and rescue services, as provided through an integrated service delivery system through the Department of Public Safety, the Police Department, or Department of Fire and Rescue. QUALIFIED PROFESSIONAL. A professional engineer, surveyor, financial analyst or planner providing services within the scope of his license, education or experience. RECOUPMENT. Reimbursement to the city through impact fees for system improvements which provide excess capacity available to serve new development. REFUND. To return or give back all or a portion of the impact fees to the owner of record pursuant to provisions of this subchapter. ROADWAY FACILITIES. Arterial or collector streets or roads that have been designated on the city comprehensive plan, including bridges, bike and pedestrian trails, bus bays, rights-of-way, traffic signals, landscaping and any local components of state or federal highways. SERVICE AREA. An area within the city or the extraterritorial jurisdiction of the city to be served by the capital improvements or facility expansions specified in the IFCIP. SERVICE UNIT. A standardized measure of consumption, use, generation or discharge attributable to an individual unit of development calculated in accordance with generally accepted engineering or planning standards for a particular category of capital improvements of facility expansions. SINGLE-FAMILY. A building, including a mobile home, arranged or designed to be occupied by one family, the structure having only one dwelling unit. SINGLE-FAMILY EQUIVALENT CONNECTOR. Has the water and wastewater characteristic of an average single-family customer, the exact size of which is defined in the land use assumptions or Impact Fees Capital Improvement Plan and Impact Fees Study. SYSTEM IMPROVEMENTS. Capital improvements that are public facilities designed to provide service to more than one development project or to the community at large, in contrast to project improvements. Improvements of the same type as are used in calculating an impact fee shall be considered SYSTEM IMPROVEMENTS, regardless of whether they are specifically listed in the Capital Improvements Plan and regardless of whether they primarily serve a particular development project. Nothing in this definition restricts, constrains or reduces the need for a development to construct, or contribute to, a project that is a SYSTEM IMPROVEMENT, and receive no credit or compensation for such construction or compensation, if such improvement is not listed in the city’s IFCIP. TRIP GENERATION RATE. The number of trips generated by a particular type of development, as set forth in commonly accepted traffic engineering standards. TRIP. The entry or exit of a vehicle to or from the site of a land use. VEHICLE MILES OF CAPACITY or VMC. The maximum number of vehicle miles of travel that can be accommodated on a roadway system during an average week day at LOS C, calculated by summing the products of the maximum service volumes of each roadway segment by the lengths of the roadway segments expressed in miles. VEHICLE MILES OF TRAVEL or VMT. The total number of miles traveled by vehicles on a roadway system during an average week day, calculated by summing the products of traffic counts for each roadway segment by the lengths of roadway segments expressed in miles. VMC/VMT RATIO. The ratio total vehicle miles of capacity of the city’s roadway facilities, as herein defined, during an average week day to the total vehicle miles of travel on the roadway facilities. WAIVED. To relinquish or abandon a claim or right. WATER CAPACITY. Wells, storage capacity and transmission mains. WATER UTILITIES or UTILITIES. All water and wastewater facilities, including wells, transmission mains, storage reservoirs, collection mains, lift stations and wastewater treatment plants. WASTEWATER CAPACITY. Trunk collection mains, lift stations, and treatment plant capacity. ZONING PLAN CHECK. The administrative review and approval by the Department of Development Services staff, of all plans for proposed new buildings and structures, additions to existing buildings and structures, and renovations of existing buildings and structures within the city, prior to the issuance of a state building permit, to insure compliance with the zoning, soil erosion and flood control regulations of the city, in accordance with Section 151.03.
( ’87 Code, § 9-11-6 ; ’87 Code, § 9-11-7 ; Ord. 95-031 ; Am. Ord. 00-005 ; Am. Ord. 05-37 ; Am. Ord. 07-23 ; Am. Ord. 17-12 )
Ask a question about Rio Rancho law
Corpus searches the Rio Rancho sections it holds and shows the ones that match, with their citations. Free, no sign-in.
