§ 153.21 — STORMWATER QUALITY PROTECTION
Municipal Code, City of Rio Rancho, New Mexico (Code 2026-04-23) · Rio Rancho Municipal Code § 153.21
Corpus is an independent public-information project, not the official City of Rio Rancho website. Stable reference: corpuslaw.us/code/cf00a592-2926-4c71-a9e2-91bb9d85efa3
§ 153.21: STORMWATER QUALITY PROTECTION.
(A) Stormwater quality protection for construction phase. (1) For all grading, construction, development, and redevelopment projects, both public and private, with land disturbances equal to or greater than one acre, including sites which disturb less than one acre but are part of a larger common plan of development, a stormwater pollution prevention plan in accordance with EPA NPDES regulations for construction site stormwater runoff control shall be submitted to the City Engineer, prior to the issuance of a building or paving permit or approval of a grading and drainage plan. This requirement is in addition to any other provisions of this chapter that may apply. (2) The stormwater pollution prevention plan shall outline the structural and nonstructural BMPs to be undertaken by the operator/owner of the project to protect stormwater quality during the construction phase of the project. These BMPs shall be maintained by the owner of the property. Inspection of these BMPs shall be made at a frequency consistent with the CGP by the owner, and a log of this inspection shall be kept on site for review by the City Engineer. The city may also inspect these BMPs on a periodic basis. These BMPs shall be subject to review by the City Engineer. (B) Stormwater quality protection for post-construction phase. (1) State water laws, flood control authorities and application to post-construction BMP selection. (a) The position of Office of the State Engineer, at the time of enactment of this chapter, is that all detained stormwater must be released within 96 hours and local flood control authority requirements prevail over the requirements of the NPDES permit. (b) The NPDES permit provides that where state water law limits the ability to fully retain stormwater quality design volume on site, measures to minimize increased discharge consistent with requirements under state water law must still be implemented. Local flood control requirements and NPDES permit requirements may be met through a combination of on-site and off-site controls. (c) The NPDES permit contains a list of possible infeasibility considerations for post-construction BMPs. The permit allows for consideration of “multiple criteria that rule out an adequate combination of the practices,” and further indicates that state water law may limit the ability to fully manage the stormwater quality design volume on site. Authorization to use off-site stormwater quality mitigation shall be solely determined by the city. (d) Where applicable state water law limits the ability to address stormwater BMPs requiring infiltration, reuse or other beneficial uses that require permits under state environmental or water law or acquisition of water rights, such BMPs may be determined by the city to be “not practicable” and alternative compliance may be considered. (2) Post-construction BMP design requirements and implementation. (a) For all development and redevelopment projects with land disturbances equal to or greater than one acre, including sites which disturb less than one acre but are part of a larger common plan of development, that discharge into the city’s storm drainage system, post-construction water quality BMPs to manage the stormwater quality design volume are required. This requirement is in addition to any other requirements that may apply. These BMPs shall be subject to the approval of the City Engineer and NPDES Project Manager. (b) The selection of management BMPs must be included in a stormwater quality design (incorporated into the grading and drainage plan as part of the preconstruction review process and, as such, subject to inspection during construction, at final inspection, and as a condition of final construction approval) that manages the ninetieth percentile stormwater quality design volume for new development and the eightieth percentile stormwater quality design volume associated with redevelopment sites. (c) Management of the stormwater quality design volumes on site, as defined in this chapter, is expected to be implemented, in large part, for new development in a manner consistent with the NPDES permit’s intent to reduce pollutants in stormwater (e.g., a water quality facility). (d) The selection of structural treatment control BMPs for priority projects must be included in a stormwater quality design to meet the criteria listed in Volume II, Section 10 of the City of Rio Rancho Development Manual, or as may be amended from time to time. (e) Where practicable, BMPs will be selected and designed to first and primarily manage flow from the contributing area impervious surfaces. Selected BMPs should include the following elements to improve on-site stormwater runoff quality: 1. Grade impervious surfaces, such as driveways, during construction to drain to vegetated areas. 2. Minimize the area of impervious surfaces such as paved areas, roof and concrete driveways. 3. Incorporate pervious or porous surfaces where allowable (e.g., gravel, permeable pavers or blocks, pervious or porous concrete) that minimize runoff. 4. Direct runoff from paved surfaces and roof areas into planting beds or landscaped areas to maximize site water capture and reuse. 5. Incorporate rain gardens, cisterns, and other rain harvesting or catchment systems consistent with current New Mexico State Engineer guidance. 6. Incorporate beds, swales, basins and other such features to manage stormwater and dry weather runoff (e.g., irrigation system overspray) and increase percolation into the soil for landscape use. (f) The BMPs and structural treatment control BMPs must include an evaluation by the applicant of the GI/LID practices and a determination and inclusion of the viable BMPs that will be implemented. The evaluated BMPs can and should be integrated with water conservation techniques such as passive water harvesting, rooftop harvesting as allowed by state water law, and/or soil amendment programs that improve the capacity of the soil texture to retain water. Examples of suitable BMPs that employ GI/LID practices can be found within the National Pollutant Discharge Elimination System Manual – Stormwater Management Guidelines for Construction and Industrial Activities. (g) As-built plans for stormwater quality designs must be submitted prior to final inspection. Grading and drainage plans or other required planning documents must specifically identify post-construction BMPs that are required to be maintained and inspected. (h) BMP(s) must be inspected by the NPDES Project Manager or other city designated qualified person and found to be in compliance with all approved plans and specifications prior to the release of certificate of occupancy or other city required approval for the site. (i) Post-construction agreements and inspection and maintenance requirements are as outlined in subsections (B)(3) and (B)(4) of this section. (3) Alternative compliance for post-construction due to infeasibility. (a) The applicant may submit to the City Engineer a request for a determination of infeasibility for on-site management of all or a portion of the stormwater quality design volume based on the limitations provided in subsection (B)(1)(d) of this section. If, at the discretion of the City Engineer, the request is confirmed, an alternative compliance strategy acceptable to the City Engineer shall be implemented to address predevelopment hydrology concern prior to discharge to waters of the U.S. or to a co-permittee’s MS4. (b) The limitations of subsection (B)(1)(d) of this section should not be construed to be exclusive, and other valid bases, other than costs, may also be considered. Such bases may include, but are not limited to: 1. Entitlements granted prior to the effective date of the permit. 2. Previous authorization from the city or co-permittees to utilize existing public off-site infrastructure granted prior to the effective date of the permit. 3. Proposed use of a public, common, or private facility that is not strictly on site, but that is designed to be utilized by an area or plan of common development (i.e., minor facilities incorporated into a master plan, planned community, subdivision, or village center). 4. Proposed and contracted use of a joint private facility, with agreement terms subject to approval by the City Engineer, though not an area of common development, and located prior to a discharge to the MS4 (e.g., reciprocal drainage agreements and easements). 5. Instances where post-development drainage does not and/or cannot practically connect to the Rio Grande or the MS4 or co-permittee’s MS4. 6. Instances where appropriate public or private drainage facilities are available off site and will be used in a manner consistent with the goals and intent of this division to manage the stormwater quality design volume to mimic predevelopment hydrology and to address stormwater quality improvement, and located prior to discharge to waters of the U.S., and as determined and approved by the City Engineer. (c) Availability of off-site private facilities will be demonstrated through appropriate engineering reports demonstrating the shared capacity of the facility and a joint voluntary agreement between parties that addresses ownership, maintenance, and inspection responsibilities that is equally, jointly, and severably enforceable against and between all parties. (d) Availability of off-site public facilities of the city or other co-permittees as documented by and subject to: 1. A determination by the city, a letter from SSCAFCA or other applicable co-permittee, as pertains to their respective facilities conditioned as needed, indicating that: a. Existing infrastructure capacity is adequate to accept the stormwater quality design volume from the fully developed watershed or subwatershed within which the development or redevelopment is located. b. The requirement for on-site retention from the releasing property may, accordingly, be waived for all or a portion of the stormwater quality design volume, and clearly stating the proportional volume that must be addressed on site. c. Specifying any water quality treatment that is required prior to release. d. Assurance to the city that water quality compliance will be fully addressed by the accepting parties’ infrastructure prior to discharge to waters of the U.S. 2. Full or partial on-site treatment for stormwater quality acceptable to the City Engineer and to owner and operator of the alternate compliance facility will be required prior to discharge to the receiving facility. The more stringent of treatment requirements specified by the City Engineer or the co-permittee will apply. 3. No discharge of any portion of the stormwater quality design volume (other than under those approved through other NPDES permit means) will be discharged from the site to any MS4 without a minimum level of treatment (GI/LID or structural) to address floatables, gross pollutants, and/or site specific pollutants of concern as determined by the City Engineer and the NPDES Project Manager. 4. The maintenance of the on-site stormwater quality feature remains the responsibility of the property owner/operator. 5. Annual inspection of the installed on-site water quality feature will be performed and documented by the owner/operator and records will be provided upon request by the City Engineer and/or equivalent position of the co-permittee. Because of the reliance on off-site public facilities, an annual inspection applies rather than the threeyear inspection schedule for private facilities specified for post-construction inspection and maintenance, as described in subsection (B)(4)(b) of this section. (4) Post-construction inspection and maintenance. (a) Private stormwater facilities shall be maintained by the facility or property owner to standards established by the City Engineer, published in the Development Process Manual, and/or in related city ordinances. (b) Periodic inspection and certification of private facilities by a professional engineer licensed in the State of New Mexico or otherwise qualified stormwater person (as determined by the City Engineer) are required of the facility/property owner and shall occur no less frequently than once every three years from the date of final construction inspection. 1. When reliance on off-site public facilities exists, an annual inspection applies rather than the three-year inspection schedule for private facilities specified for post-construction inspection and maintenance. 2. The responsibility and cost for the inspection is the responsibility of the private facility owner and/or property owner. The owner and property owner of each structural BMP shall keep records of inspections, maintenance, and repairs for at least five years from the date of creation of the record, whether the inspection schedule is annual or every three years. (c) Documentation of the inspection, maintenance activities, and repairs shall be provided to the City Engineer upon request or in the case of off-site mitigation to the owner of the receiving facility. Copies of the inspection reports shall be kept on file at the subject property/facility or at the offices of the property owner and/or manager, and shall be made available within two working days of an inspection request (whether verbal or written). A facility or BMP that cannot be certified or for which records cannot be provided in a timely manner shall be certified by current inspection and/or deficiencies corrected within 90 days of notice from the city that such correction or inspection is needed unless a more immediate action is deemed necessary by the City Engineer. (d) All on-site post-construction BMPs or alternate compliance methods and techniques are subject to random inspections by the City Engineer per the inspection provisions of Section 153.20 and subsection (B)(1) of this section. (e) Inspections and inspection programs by the city may be conducted or established on any reasonable basis, including but not limited to routine inspections; random inspections; inspections based upon complaints or other notice of possible violations; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to: reviewing maintenance and repair records; sampling discharges of surface water, groundwater, and material or water in BMPs; and evaluating the condition of BMPs. (C) The multisector general permit (MSGP) and industrial facility stormwater quality protection. (1) For any existing industrial activities subject to the MSGP, proof of compliance with the relevant EPA industrial sector permit provisions shall be provided to the City Engineer prior to issuance of any building, zoning, special use, development or redevelopment permit or approval of a grading and drainage plan. For new industrial development projects, such proof will be provided no later than 90 days after receipt of the certificate of occupancy or other necessary permit or approval from the city. In cases where MSGP proof of coverage is required, an active EPA Notice of Intent or No Exposure Certification serves as proof. (2) The City Engineer or NPDES Project Manager may require monitoring of nonstormwater discharges if the Engineer/Manager reasonably believes that such discharges violate the provisions of this chapter or of the terms of the MSGP provisions. (3) Upon request by the City Engineer or the NPDES Project Manager, an industrial facility subject to the MSGP shall submit the results of any sampling or monitoring undertaken pursuant to the MSGP or other water-related discharge permit.
( Ord. 18-13 )
Ask a question about Rio Rancho law
Corpus searches the Rio Rancho sections it holds and shows the ones that match, with their citations. Free, no sign-in.