§ 153.35: CITY ENGINEER; DUTIES AND DETERMINATIONS.
(A) It shall be the responsibility of the City Engineer to produce, approve, make and retain records of all drainage plans, drainage reports, design analyses, design drawings, as-built drawings and maintenance schedules related to all drainage control, flood control and erosion control facilities constructed within city rights-of-way or easements. (B) Applications for all land use changes shall address drainage control, flood control, stormwater quality and erosion control in terms of the interactions of these parameters with other requirements and needs produced by the proposed land use changes. (C) Requests for the platting of land for the purpose of subdivision or development shall be accompanied by appropriate drainage control, flood control and erosion control information. (D) (1) The City Engineer shall not approve any plan or report pertaining to proposed construction, platting or other development where the proposed activity or change in the land affected would result in downstream capacity being exceeded. (2) Downstream capacity is determined based on the assumption of fully developed watersheds. This assumption prevents “the first come, first served” approach where downstream development unduly constrains upstream development. Parameters used in the determination of downstream capacity include, but are not limited to: (a) Channel stability; (b) Crossing structure hydraulic capacity; (c) Reservoir capacity; (d) Hydraulic capacity of street, storm sewer or channel; (e) Public safety; and (f) Maintenance constraints. (3) Planned public storm drainage facilities are assumed as in place in determining downstream capacity; provided, that construction funds are available and design has progressed to the point where capacity can be ascertained. (E) Temporary facilities are only allowed and/or required on a case-by-case basis as determined by the City Engineer. The level of protection to be provided by temporary facilities shall be determined by considering: (1) The likelihood and consequences of a failure; (2) Length of time until permanent facilities will be in place; and (3) The acceptance of maintenance responsibilities and legal liabilities. (F) (1) Requests for approval of construction, development and/or platting proposals to the City Engineer shall be accompanied by drainage control, flood control and erosion control information and/or commitments. This information must be prepared by a professional engineer, licensed in the State of New Mexico, unless the City Engineer waives this requirement. (2) The particular nature, location and scope of the proposed development defines the degree of detail. One or more of the following levels of submittal may be required based on the following: (a) Conceptual grading and drainage plan. A graphic representation of existing and proposed grading, drainage, flood control and erosion control information. The information should be of sufficient detail to determine project feasibility. The purposes of this plan are to check the compatibility of the proposed development within grading, drainage, flood hazard and erosion control constraints as dictated by on-site physical features as well as adjacent properties, streets, alleys and channels. Modifications to the comprehensive plan and the development of area plans, sector plans, site development plans and landscaping plans on tracts of five acres or more are appropriate applications of conceptual grading and drainage plans. (b) Drainage plans. A short, detailed presentation required for approval of small, simple development approvals. Drainage plans are prepared in combination with the detailed grading plan and address both on-site and off-site drainage control, flood control, stormwater quality and erosion control issues. Drainage plans are required for building permits, site development plans and land-scaping plans for developments involving less than five acres. (c) Drainage report. A drainage report is a comprehensive analysis of the drainage control, flood control and erosion control constraints on and impacts resulting from a proposed platting, development or construction project. Drainage reports are required for subdivisions containing more than 10 lots or constituting five acres or more, platting or construction within a designated flood hazard area and for any platting or development adjacent to a major arroyo. (d) Erosion control plan. An erosion control plan is usually incorporated into the drainage plan or drainage report. Erosion control plans address all phases of each project from initial grading through and including final occupancy. Phased projects required special attention. All construction projects, both public and private, within the jurisdiction of this chapter, unless specifically excluded, require an approved erosion control plan prior to start of construction. (e) Stormwater quality design. A stormwater quality design includes a plan for stormwater quality treatment for the stormwater quality design volume, including the incorporation of design elements to manage the stormwater quality design volume on site, or the basis for requesting and the proposed method for alternative treatment options. The stormwater quality design should also address opportunities for the use of GI/LID practices, including, but not limited to, the use of rooftop discharge and passive water harvesting or other water conservation methods as permissibly allowed without water right by state water law and State Engineer interpretation. Stormwater quality designs are required for all grading, construction, development, and redevelopment projects with land disturbances equal to or greater than one acre, including sites which disturb less than one acre but are part of a larger common plan of development. (G) Drainage control considerations specifically address safety, convenience and economics for both private property and public facilities. (H) (1) The 100-year design storm is the 100-year six-hour storm as defined by the National Oceanic Atmospheric Administration (NOAA) and by the storm distributions for time and area as developed by the City Engineer. The 100-year storm has a one percent probability of occurring in any year. Watersheds with times of concentration greater than six hours will require the use of the 100-year 24-hour storm volumes and distributions. Detention basins with longer than six hours evacuation times shall use a 24-hour or longer storm volume and distribution. (2) Design circumstances may require larger or smaller storm volumes. Examples are emergency spillways for dams and erosion control plans, respectively. The sources for rainfall data are current NOAA publications and the City Engineer. When the need for other design storms is apparent, the City Engineer will provide requirements concerning appropriate storms, frequencies and durations. (I) The 100-year design storm does not apply for the stormwater quality design storm. The stormwater quality design storm shall be the ninetieth percentile storm event for newly developing properties and the eightieth percentile event for redevelopment properties. The definition for the ninetieth percentile and eightieth percentile stormwater design volume shall be determined by the direction of the City Engineer or his designee. In no case shall it be less than the event as defined in the NPDES permit as related to post-construction stormwater management. Nothing in this chapter shall preclude the definition of the stormwater quality design storm to be greater than prescribed in the NPDES permit. In the event of conflicting design storm events, the design storm with the larger associated runoff volume shall be utilized for flood and drainage control purposes. A storm event resulting in a discharge volume larger than the stormwater quality design volume may be utilized for stormwater management design and stormwater quality purposes. (J) The City Engineer shall, within 14 to 30 calendar days after the submission to him of a request in writing for the approval of a plat, development plan, drainage submittal or exemption, approve or deny the request and mail a copy of his decision to the applicant. If the request is denied, the reasons for the denial shall be stated in writing. Appeal of the decisions is as provided in Section 153.38. (K) Grading or paving permits issued by the City Engineer or approvals by the City Engineer of drainage plans, erosion control plans or other improvement plans within the context of this chapter shall expire by limitation and become null and void if the work or improvement authorized is not commenced within 12 months of the approvals. In the event the authorized work or improvement is suspended or abandoned for a period of 12 months after the work or improvement is commenced, the permit or approval shall expire and become null and void. Before the work or improvement is recommenced, resubmittals must be made for approval by the City Engineer. (L) The NPDES permit requires that submittals contain the signature of the principal executive official or ranking elected official or, alternatively, a duly authorized representative of that person, so long as that individual or position has an overall responsibility for environmental matters for the city. The duly authorized representative may either be a named individual or any individual occupying a named position. The signature authority may be delegated.
( ’87 Code, § 8-7-12 ; Ord. 84-113 ; Am. Ord. 91-037 ; Am. Ord. 01-020 ; Am. Ord. 18-13 )
Ask a question about Rio Rancho law
Corpus searches the Rio Rancho sections it holds and shows the ones that match, with their citations. Free, no sign-in.