For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11 — Cable System, Technical Standards, and Testing

Code of Ordinances of the City of Santa Fe, New Mexico (Codified through Ordinance No. 2026-16, adopted June 24, 2026. (Supp. No. 25)) · Santa Fe Municipal Code, App. H, § 11

Corpus is an independent public-information project, not the official City of Santa Fe website. Stable reference: corpuslaw.us/code/42140a40-2e83-4d0b-8940-76d90795fdb7

Section 11. - Cable System, Technical Standards, and Testing.

11.1 Subscriber Network. (A) Grantee's Cable System shall be equivalent to or exceed technical characteristics of a traditional HFC 750 MHz Cable System and provide Activated Two-Way capability. The Cable System shall be capable of supporting video and audio. The Cable System shall deliver no less than one hundred ten (110) Channels of digital video programming services to Subscribers, provided that the Grantee reserves the right to use the bandwidth in the future for other uses based on market factors. (B) Equipment must be installed so that all closed captioning programming received by the Cable System shall include the closed caption signal so long as the closed caption signal is provided consistent with FCC standards. Equipment must be installed so that all local signals received in stereo or with secondary audio tracks (broadcast and Access) are retransmitted in those same formats. (C) All construction shall be subject to the City's permitting process. (D) Grantee and City shall meet, at the City's request, to discuss the progress of the design plan and construction. (E) Grantee will take prompt corrective action if it finds that any facilities or equipment on the Cable System are not operating as expected, or if it finds that facilities and equipment do not comply with the requirements of this Franchise or Applicable Law. (F) Grantee's construction decisions shall be based solely upon legitimate engineering decisions and shall not take into consideration the income level of any particular community within the Franchise Area. 11.2 Technology Assessment. (A) The City may notify Grantee on or after five (5) years after the Effective Date, that the City will conduct a technology assessment of Grantee's Cable System. The technology assessment may include, but is not be limited to, determining whether Grantee's Cable System technology and performance are consistent with current technical practices and range and level of services existing in the fifteen (15) largest U.S. cable systems owned and operated by Grantee's Parent Corporation and/or Affiliates pursuant to franchises that have been renewed or extended since the Effective Date. (B) Grantee shall cooperate with the City to provide necessary non-confidential and proprietary information upon the City's reasonable request as part of the technology assessment. (C) At the discretion of the City, findings from the technology assessment may be included in any proceeding commenced for the purpose of identifying future cable-related community needs and interests undertaken by the City pursuant to 47 U.S.C. § 546. 11.3 Standby Power. Grantee's Cable System Headend shall be capable of providing at least twelve (12) hours of emergency operation. In addition, throughout the term of this Franchise, Grantee shall have a plan in place, along with all resources necessary for implementing such plan, for dealing with outages of more than four (4) hours. This outage plan and evidence of requisite implementation resources shall be presented to the City no later than thirty (30) days following receipt of a request. 11.4 Emergency Alert Capability. Grantee shall provide an operating Emergency Alert System ("EAS") throughout the term of this Franchise in compliance with FCC standards. Grantee shall test the EAS as required by the FCC. Upon request, the City shall be permitted to participate in and/or witness the EAS testing up to twice a year on a schedule formed in consultation with Grantee. If the test indicates that the EAS is not performing properly, Grantee shall make any necessary adjustment to the EAS, and the EAS shall be retested. 11.5 Technical Performance. The technical performance of the Cable System shall meet or exceed all applicable federal (including, but not limited to, the FCC), state, and local technical standards, as they may be amended from time to time, regardless of the transmission technology utilized. The City shall have the full authority permitted by Applicable Law to enforce compliance with these technical standards. 11.6 Cable System Performance Testing. (A) Grantee shall, at Grantee's expense, perform the following tests on its Cable System: (1) All tests required by the FCC; (2) All other tests reasonably necessary to determine compliance with technical standards adopted by the FCC at any time during the term of this Franchise; and (3) All other tests as otherwise specified in this Franchise. (B) At a minimum, Grantee's tests shall include: (1) Cumulative leakage index testing of any new construction; (2) Semi-annual compliance and proof of performance tests in conformance with generally accepted industry guidelines; (3) Tests in response to Subscriber complaints; (4) Periodic monitoring tests, at intervals not to exceed six (6) months, of Subscriber (field) test points, the Headend, and the condition of standby power supplies; and (5) Cumulative leakage index tests, at least annually, designed to ensure that one hundred percent (100%) of Grantee's Cable System has been ground or air tested for signal leakage in accordance with FCC standards. (C) Grantee shall maintain written records of all results of its Cable System tests, performed by or for Grantee. Copies of such test results will be provided to the City upon reasonable request. (D) If the FCC no longer requires proof of performance tests for Grantee's Cable System during the term of this Franchise, Grantee agrees that it shall continue to conduct proof of performance tests on the Cable System in accordance with the standards that were in place on the Effective Date, or any generally applicable standards later adopted, at least once a year, and provide written results of such tests to the City upon request. (E) The FCC semi-annual testing is conducted in January/February and July/August of each year. If the City contacts Grantee prior to the next test period (i.e., before December 15 and June 15 respectively of each year), Grantee shall provide City with no less than seven (7) days prior written notice of the actual date(s) for FCC compliance testing. If City notifies Grantee by the December 15th and June 15th dates that it wishes to have a representative present during the next test(s), Grantee shall cooperate in scheduling its testing so that the representative can be present. Notwithstanding the above, all technical performance tests may be witnessed by representatives of the City. (F) Grantee shall be required to promptly take such corrective measures as are necessary to correct any performance deficiencies fully and to prevent their recurrence as far as possible. Grantee's failure to correct deficiencies identified through this testing process shall be a material violation of this Franchise. Sites shall be re-tested following correction. 11.7 Additional Tests. Where there exists other evidence that, in the judgment of the City, casts doubt upon the reliability or technical quality of Cable Service, the City shall have the right and authority to require Grantee to test, analyze, and report on the performance of the Cable System. Grantee shall fully cooperate with the City in performing such testing and shall prepare the results and a report, if requested, within thirty (30) days after testing. Such report shall include the following information: (A) the nature of the complaint or problem which precipitated the special tests; (B) the Cable System component tested; (C) the equipment used and procedures employed in testing; (D) the method, if any, in which such complaint or problem was resolved; and (E) any other information pertinent to said tests and analysis which may be required.

Ask a question about Santa Fe law

Corpus searches the Santa Fe sections it holds and shows the ones that match, with their citations. Free, no sign-in.