For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14-8.2 — TERRAIN AND STORMWATER MANAGEMENT

Code of Ordinances of the City of Santa Fe, New Mexico (Codified through Ordinance No. 2026-16, adopted June 24, 2026. (Supp. No. 25)) · Santa Fe Municipal Code § 14-8.2

Corpus is an independent public-information project, not the official City of Santa Fe website. Stable reference: corpuslaw.us/code/1a5c8793-1b51-4c56-a12d-a9c4cfe53721

14-8.2 - TERRAIN AND STORMWATER MANAGEMENT

(Ord. No. 2011-37 § 10) (A) Purpose The purpose of this Section 14-8.2 is to protect, maintain and enhance the health, safety and general welfare of the citizens and natural environment of Santa Fe. The following considerations shall be used during the design and planning process for all proposed developments subject to this Section 14-8.2: (1) ensure sound and orderly development of the natural terrain; (2) protect life and property from the dangers of flooding and the hazard of improper cuts and fills ; (3) minimize erosion and sedimentation; (4) minimize destruction of the natural landscape ; (5) protect the scenic character of Santa Fe from the visual blight of indiscriminate cuts and fills and vegetation removal resulting from extensive grading and utility scars; (6) treat stormwater runoff as a valuable natural resource in Santa Fe, a community that is prone to drought, by encouraging water collection and infiltration on site; (7) control the adverse impacts associated with accelerated stormwater runoff on natural drainage ways and all structures due to increased development and impervious surfaces; (8) minimize erosion and degradation of arroyo channels and improve the condition of the channels where possible; (9) respect, protect, maintain and restore natural drainageways , wetlands, bosques, floodplains , steep slopes , riparian vegetation and wildlife habitat areas; (10) prevent stormwater runoff from entering or damaging acequias or other irrigation facilities; (11) integrate stormwater management measures into the landscape and site planning process as set forth in Section 14-8.4 (Landscape and Site Design); (12) provide aesthetically pleasing solutions to stormwater management and erosion control measures by integrating measures into the overall landscape and site design; and (13) promote improved water quality through compliance with the EPA NPDES MS4 permit and Construction General Permit (CGP). (B) Applicability (1) Minimum Standards and Submittal Requirements (a) Minimum standards and submittal requirements for terrain and stormwater management are based on the type of project and all projects shall meet the minimum standards in Subsection 14-8.2(D) (Standards for All Grading). (b) Projects for which a construction permit for grading is required by Section 14-3.10(E) (Development in Special Flood Hazard Areas) shall also meet the applicable minimum standards and submittal requirements in Subsection 14-8.2(E) for minor development or Subsection 14-8.2(F) for all other development . (c) Master plan, preliminary development plan and preliminary subdivision plat applications shall also meet the minimum standards and submittal requirements in Subsection 14-8.2(G). (d) Final development plan and subdivision plat applications shall also meet the requirements in Subsection 14-8.2(H). (e) All city departments that implement construction projects shall comply with the objectives, intent and minimum standards of this Section 14-8.2. (2) Exemptions A development is exempt from the requirements of this Section 14-8.2 if it meets the following conditions: (a) less than two hundred fifty (250) square feet of total land area is disturbed; (b) no slopes greater than ten percent are disturbed; (c) existing drainage patterns on the property are not changed in a way that would increase the amount of stormwater runoff leaving the property or cause significant change to on-site drainage patterns as determined by the city engineer , and (d) adequate erosion control is provided. (3) Alternate Means of Compliance Applicants may propose alternatives to standard stormwater management techniques, so long as these alternatives allow the project to meet the minimum standards and general requirements of this Section 14-8.2. Alternative techniques may be proposed that achieve improved environmental performance, including reduced stormwater runoff, increased infiltration, reduced sedimentation and erosion , and for aesthetic purposes. Proposals for alternative compliance to standard stormwater management techniques are subject to review and approval of the city engineer in writing, stating the basis for such a waiver. (C) Procedures and General Requirements (1) The city engineer may determine the following: (a) the completeness of all required terrain and stormwater management submittals; (b) compliance with all minimum standards; (c) the acceptability of all proposed erosion control and stormwater management methods; and (d) the need for additional information or written approval in order to determine compliance with the purposes, intent and minimum standards of this Section 14-8.2. (2) The preparation of submittals shall be as provided in this Subsection 14-8.2(C)(2) and in accordance with the provisions of Chapter 61 NMSA 1978 (Professional and Occupational Licensing) regulating the practice of architecture, landscape architecture, engineering and land surveying. (Ord. No. 2013-16 § 44) (a) Grading submittals for minor development or for grading incidental to the construction or modification of a structure may be prepared by any person, including the homeowner, who has the legal authority to design the structure ; however, the city engineer may require that submittals be prepared and signed by a professional engineer , architect , professional land surveyor or landscape architect licensed in New Mexico if necessary to fulfill the requirements of this Section 14-8.2, Chapter 61 NMSA 1978 or applicable regulations; (b) Submittals for development other than minor development or incidental to the construction or modification of a structure shall be prepared as follows: (i) topographic plans shall be prepared and certified by a professional engineer or professional land surveyor ; (ii) stormwater management submittals for master plans, subdivisions and development plans shall be prepared and certified by a professional engineer . Stormwater management submittals for all other types of development shall be prepared by a professional engineer or an architect or landscape architect registered in New Mexico; and (iii) site restoration submittals shall be prepared and certified by a professional engineer , architect or landscape architect licensed in New Mexico. (3) No certificate of occupancy or any type of final construction approval shall be issued by the city unless a parcel is in full compliance with the requirements of this Section 14-8.2 and all inspections have been conducted as described in this Section 14-8.2. (4) Activities permitted pursuant to this Section 14-8.2 may also require notification or permitting by other agencies, including written approval from the Acequia Madre de Santa Fe community acequia association or other official watercourse-related entity, the EPA, the United States army corps of engineers, the federal emergency management agency (FEMA) and the New Mexico Department of Environment. It is the responsibility of each applicant to determine whether additional notification or permitting is required. (5) All inspections shall be documented in written form, shall be made available to the city engineer or code enforcement officer upon request. (D) Standards for All Grading When a construction permit for grading is required by this Section 14-8.2, applications for the permit shall show compliance with the following minimum standards: (1) Cut and Fill Slopes (a) exposed cut slopes on a site shall not exceed ten (10) feet in height, except as otherwise permitted by this Section 14-8.2. In no case shall the height of a cut exceed the height of any building constructed in the excavated area; (Ord. No. 2013-16 § 45) (b) fill slopes on a site shall not exceed fifteen (15) feet in height. Retaining walls for fill slopes shall be no greater than six (6) feet in height as provided in Section 14-8.5(B)(1), except as otherwise provided in Section 14-5.6(G) (Escarpment Overlay District Landscaping). Fill slopes shall be no steeper than 3:1, unless a structural alternative such as a retaining wall or some other measure acceptable to the city engineer is provided; (c) cut or fill slopes for roads shall not exceed fifteen (15) feet in height; and (d) all cut slopes that are not stabilized by a retaining wall or some other measure acceptable to the city engineer , shall be no steeper than 2:1, unless a structural alternative is provided or unless it can be demonstrated by a geotechnical study that existing soils will naturally accommodate a steeper slope and acceptable revegetation or other erosion control can be achieved. (2) Grading (a) Grading for buildings is limited to fifteen (15) feet beyond the outer edge of the building foundation, patio, wall , driveway, road, parking area or other constructed facility except as necessary: (i) for the construction of stormwater runoff management measures in compliance with this Section 14-8.2; or (ii) to accommodate required horizontal to vertical measurements for cut and fill slopes . (b) Natural slopes thirty percent or greater shall remain undisturbed, except for arroyo crossings and for no more than three isolated occurrences of sloped areas where each individual disturbance shall not exceed one thousand (1,000) square feet, as approved by the city engineer . The city engineer may waive this provision, in writing, stating the reasons and basis for such approval, if evidence is provided by the applicant showing that strict enforcement of this provision would prohibit access to the lot or placement of utilities. This provision applies solely to the construction of roads, driveways and utility placement and is not intended to allow development on natural slopes exceeding thirty percent. The other provisions of the escarpment overlay district ordinance and the terrain and stormwater management regulations shall remain in effect. (c) Phasing for grading and clearing may be required by the city engineer on all sites where construction will not begin immediately after clearing and grading ; (d) A construction permit for grading for driveway construction shall not be issued unless the city engineer has first determined that the driveway provides access to a buildable area as defined in Subsection 14-8.2(D)(3) and that the permit complies with the requirements of Section 14-5.6 (Escarpment Overlay District); and (e) All grading completed on the site shall conform to the approved grading plan. (f) The land use director may grant an application submitted to the building division of the planning and land use department for a preliminary clearing and grubbing permit or a limited grading permit , allowing for work authorized under such permit solely at the risk of the owner while an application for an associated permit for comprehensive grading and drainage or landscape and utilities is pending. (g) Under emergency circumstances, the land use director may issue an emergency grading at owner's risk permit prior to the submission of an application . A permit issued under this subparagraph shall expire twelve (12) months after issuance with no allowance for extensions. (3) Topography (Ord. No. 2014-31 § 28; Ord. #2020-22, § 16; Ord. #2020-23, § 6) (a) Each residential lot shall have a buildable site designated as suitable for a building with a footprint of not less than forty percent of the minimum required net lot area or two thousand (2,000) square feet, whichever is less, which can be developed in accordance with the terrain and stormwater management standards and with other applicable development standards, including required setbacks and access requirements. The planning commission or the land use director for summary plats or resubdivisions, may approve residential lots with a smaller buildable site to accommodate lot size averaging or within multi-family developments. (b) At least one-half of the area designated as suitable for building and at least one-half of any building footprint shall have a natural slope of less than twenty percent; the remainder of the area or building footprint may have a natural slope of twenty percent or greater, but less than thirty percent. (c) The first floor finished floor elevation at any point of any portion of a building built on a natural slope of twenty percent or greater shall not exceed five (5) vertical feet above the natural slope at that point. (d) A structure shall not be built on a natural slope of thirty percent or greater. (4) Stormwater Management (a) General Standards: (i) stormwater management measures shall be selected to best accommodate the specific geologic, hydrologic and topographic features of the land to be developed; (ii) stormwater management measures shall be designed as both a comprehensive and integral part of the development ; (iii) stormwater management measures shall be designed to directly address additional flows from the proposed development . Compliance with these standards shall not be achieved solely by alterations to flows upstream of a proposed development ; and (iv) stormwater management plans may be designed to incorporate measures that are shared by two or more developments ; provided that the measures comply with the minimum standards of this Section 14-8.2, including provision of an enforceable legal agreement for construction and maintenance. (b) Discharge Standards: (i) except as otherwise required by this Section 14-8.2, the stormwater runoff peak flow rate discharged from a site shall not exceed pre- development conditions for any frequency storm event up to the one percent chance, twenty-four-hour storm event at each discharge point; (ii) runoff control measures may include the use of detention or retention basins and active water harvesting and passive water harvesting techniques, swales , berms, check dams, vegetative ground cover, permeable pavements , tree wells, dry wells, cisterns and other techniques appropriate for retaining and infiltrating water on site; (iii) stormwater shall not be discharged into any watercourse or drainage channel without adequate reduction of flow velocity, which shall be accomplished by erosion control techniques that may include the routing or energy dissipation of stormwater runoff to a vegetated swale , vegetated basin or stone-protected area. The techniques used shall be sufficient to diminish runoff velocity and spread runoff flow adequately to avoid erosion upon entering the watercourse; (iv) stormwater runoff shall not be routed into irrigation ditches, canals, acequias or watercourses related to an acequia system unless specific plans have been approved in writing by the person legally responsible for the operation and maintenance of the facility and the city engineer . The developer is responsible for obtaining all such approvals before submittal of an application ; and (v) an active, historic acequia, whether on site or off site, shall not be disturbed in any way by building development or construction activity unless specific plans have been approved in writing by the person or entity legally responsible for the operation and maintenance of the acequia. The developer is responsible for obtaining all such approvals before submittal of an application . (c) Detention Basin Standards: (i) stormwater detention basins and overflow structures shall be sized and designed to adequately accommodate flows from one percent chance , twenty-four-hour storm events; provided, however, that such basins shall also be equipped with outflow structures that limit flow-through from lesser magnitude storms to runoff rates equal to or less than pre- development runoff rates; (ii) infiltration, detention and retention basins shall provide a means of controlling and removing sediment. Methods may include sedimentation settling ponds, sediment traps, filters on drop inlets or other methods. All basins shall be designed to empty within no more than twenty-four hours; (iii) landscape treatment of detention and retention basins may be required in accordance with Section 14-8.4 (Landscape and Site Design); and (iv) discharge standards for minor development are provided in Subsection 14-8.2(E)(2). (d) Detention in Cisterns (i) Cisterns may be used if they are connected to an irrigation system or other water use. (ii) A maximum of fifty percent of required stormwater detention volume may be stored in cisterns , except that one hundred percent may be stored in cisterns for minor development . (iii) Cisterns shall be installed and operated in compliance with applicable provisions of other regulations, including Section 14-8.4 (Landscape and Site Design) and Chapter 7 SFCC 1987 (Building and Housing). (e) Arroyo, Stream and Watercourse Standards: (i) for arroyos, streams or watercourses that carry one hundred (100) cubic feet per second or more of stormwater flow in a one percent chance event , all structures , paved roads, driveways and parking lots shall be set back a minimum of twenty-five (25) feet from the top shoulder of an arroyo plus the depth of the arroyo channel. This setback provision does not apply to stormwater management structures or public access trails. The city engineer may waive this provision, in writing, stating the reasons and basis for such approval, if evidence is provided by a professional engineer demonstrating arroyo bank stability; (ii) for arroyos, streams or watercourses that carry less than one hundred (100) cubic feet per second in a one percent chance event , the city engineer may require a setback based on soils and hydrologic information supplied by the applicant . (iii) except for erosion control measures, stormwater management measures, public access trails or the placement of underground utilities required for development , no grading shall occur within the setback area; (iv) where practical, erosion control and channel stability in arroyos, streams or watercourses shall be achieved using techniques that reduce stormwater velocity and pollution, preserve active floodplains , provide adequate room for flood waters to spread safely and use native vegetation. Arroyo and watercourse banks shall not be armored with concrete, gabion baskets, sheet piling, rip-rap or similar hardened material unless no reasonable alternative exists to protect public infrastructure or pre-existing structures ; and (v) fences, walls and similar structures may not be constructed in or across an arroyo, stream or watercourse. (5) Site Restoration: (a) soil stabilization and erosion control measures for all land disturbed by construction shall be completed within twenty-one days after completion of construction or other activities on site that interfere with soil stabilization measures. If the time of year is not conducive to planting, it may be delayed until the next appropriate planting season if all appropriate temporary erosion control measures are maintained until permanent erosion control measures are implemented; (b) one or more of the following stabilization and erosion control measures shall be used: (i) revegetation with appropriate drought-tolerant plant materials, including grasses or other ground cover; (ii) restoration with bioengineering techniques such as live staking , brush layering , brush mattress and live crib walls ; and (iii) stabilization with stones, terracing or similar techniques; and (c) all trees and shrubs shall be mulched and irrigated until established. Grass seed should either be hydroseeded or covered with biodegradable material or synthetic soil erosion control blankets or matting and irrigated until established. Irrigation shall be pursuant to the irrigation requirements in Section 14-8.4 (Landscape and Site Design). (6) Increase in Minimum Standards The city engineer may require implementation of more than the minimum stormwater standards if arroyos on site or immediately downstream of a site show evidence of increased flooding , channel erosion or sedimentation as a direct result of conditions on the site. Increased requirements shall be limited to the following on-site measures: (a) erosion and sediment control measures extended to a broader area of the site than the development area; (b) revegetation or stabilization of highly eroded areas; (c) arroyo restoration or other erosion control measures within highly eroded channels; or (d) a combination of the measures specified in Subsections 14-8.2(D)(6)(a) through (c). (7) Best Management Practices. (Ord. No. 2016-40 § 2) The following best management practices shall be used before and during the construction process: (a) disturbed areas shall be protected from erosion during construction by diverting stormwater around the disturbed area, dissipating the energy of stormwater adequate to prevent erosion , retaining sediment on the disturbed area or other means adequate to retain soil on site, or a notice of intent (NOI) is filed; (b) except as necessary to install temporary erosion and sediment control devices, land shall not be graded or cleared of vegetation until all such temporary devices have been properly installed and inspected. Temporary erosion and sediment control devices may include silt fencing, swales , straw bales, berms, geotextiles, sediment basins or traps and fencing. Control devices shall be kept in place and functional until the disturbed area is permanently stabilized; or notice of termination (NOT) is filed; (c) all significant trees , and other trees and vegetation, areas with substantial grass coverage and drainageways that are to remain undisturbed shall be fenced off prior to the use of any heavy machinery on-site and shall remain fenced during the entire construction process. Fencing material may include snow fencing, plastic mesh or other similar fencing material. To protect the root zone of all significant trees , and other trees and vegetation, fencing shall be placed five (5) feet to the outside of their dripline; (d) to prevent soil from leaving a site, soil stockpiles shall be protected from wind and water erosion throughout the time the stockpile remains by using appropriate erosion control techniques. Staging and soil stockpile areas shall be clearly designated on the site. All topsoil shall be kept on site, within the disturbance zone of a construction site and then reintroduced into planting areas to the extent possible. Stockpiled soil shall not be allowed to enter arroyos or other drainageways ; (e) techniques to prevent the blowing of dust or sediment from the site, such as watering down exposed areas, are required for projects that disturb greater than five thousand (5,000) square feet; and alternate forms shall be readily available and used if watering is not sufficient; (f) protection for storm drain inlets, drainageways and any stormwater conveyance shall be provided to prevent the entry of sediment and pollutants from the site while still allowing the entry of stormwater. (E) Standards for Minor Development; Submittal Requirements (1) Minor Development A minor development includes the construction of any structure , including single family residences, additions, sheds, garages , fences, driveways or pavement, that meets all of the following criteria: (a) it takes place on a single lot or a subdivision of fewer than three lots ; (b) it results in cumulative total disturbance of less than five thousand (5,000) square feet of land on a lot ; (c) it disturbs no slope equal to or greater than twenty percent; and (d) no more than three thousand five hundred (3,500) square feet of new impervious surface is created per lot . (2) Minimum Standards; Discharge Standards Minor development must comply with the standards in Subsection 14-8.2(D), except that the minimum volume of water to be contained or infiltrated on site shall be determined by multiplying the total area of new impervious surface, in square feet, by 0.16 feet to arrive at a value expressed in cubic feet, i.e. one hundred sixty (160) cubic feet of water containment is required per one thousand (1,000) square feet of impervious surface. (3) Submittals Construction permit applications for grading for minor development must provide sufficient information to demonstrate compliance with the standards in Subsection 14-8.2(D) and Subsection 14-8.2(E)(1) and (2), including the following, unless the requirement is waived by the land use director : (a) a brief narrative description of the proposed project; (b) a topographic map of the property to scale, including United States Geological Survey quadrangle maps or maps generated by the city , adequate to show elevation contours, natural drainageways and existing and proposed improvements; (c) a brief written description or representative photographs of the type of existing vegetation, such as piñon and juniper trees, annual weeds, grass cover, bare ground and so on, and approximate coverage of existing vegetation at the site, and a plan for vegetation removal at the site; (d) a description of all proposed grading or ground disturbance; (e) calculations and a plan drawing showing: (i) the size, volume, dimensions and location of all proposed runoff containment structures or methods and how water will be directed to the structures or methods; and (ii) percolation test results or other means of demonstrating that containment structures will empty within twenty-four hours; (f) a roof run-off drainage plan; and (g) a planting plan for revegetation showing proposed plant materials and a description of the proposed irrigation method or other methods used to establish vegetation and prevent erosion until vegetation becomes established. (F) Submittal Requirements For All Other Development (Ord. No. 2014-31 § 29) All other development that requires a construction permit for grading , and that is not classified as minor development under the provisions of Subsection 14-8.2(E), shall meet the following minimum submittal requirements: (1) Submittals for construction permit applications for grading must provide sufficient information to show compliance with Subsection 14-8.2(D) and (E). Unless waived by the land use director , submittals must include: (a) a topographic survey and grading plan with elevation contours shown at not more than two (2) foot intervals on slopes less than thirty percent and five (5) foot intervals on slopes of thirty percent or greater that shows: (i) all sloped areas of zero to twenty percent, twenty-one to thirty percent and greater than thirty percent shall be clearly marked and differentiated by shade, tone or color at a scale sufficient to allow verification of the calculations; (ii) ground elevations that conform to either the United States Geological Survey sea level datum, as modified, or to the city 's monument system; (iii) the designated buildable sites or buildable areas ; (iv) all areas to be graded on the site and the final contours to be achieved by the grading ; (v) all finished floor or grade elevations; (vi) spot elevations, as needed; (vii) areas of soils with severe limitations for the intended use; (viii) the location of temporary erosion control structures and methods used, including staging and stockpile areas; (ix) all significant trees and areas with substantial grass coverage to be removed; (x) a construction schedule when the project will be developed in phases; (xi) the location of fencing around the areas to be protected; (xii) the ratio of horizontal to vertical measurement for cut and fill slopes ; (xiii) the total volume, in cubic yards, of earth to be moved; (xiv) all existing disturbed areas; (xv) special flood hazard areas designated by FEMA on the Flood Insurance Rate Map (FIRM) ; and (xvi) date, method of survey and certification from a New Mexico professional engineer or professional land surveyor that the plan is in compliance with national map accuracy standards; (G) Standards for Master Plans, Preliminary Development Plans and Preliminary Subdivision Plats; Submittal Requirements (1) Minimum Standards: (a) projects shall meet the minimum standards of Subsection 14-8.2(D); (b) all land below the base flood elevation for a one percent chance event shall be dedicated as a drainage easement and as public or private open space or public right of way ; and (c) for all development where one-half or more of the land within the project site exceeds twenty percent slope , the quantity and peak flow rate of post- development stormwater runoff on all developed or disturbed land shall not exceed seventy-five percent of the quantity and peak flow rate of the pre- development runoff. (2) Submittals Submittals for master plans, preliminary development plans and subdivision plats shall include: (a) a conceptual plan and report that shows the general approach proposed for terrain and stormwater management, and how the proposed development meets all of the minimum standards described in Subsection 14-8.2(D); (b) a topographic survey and grading plan as outlined in Subsection 14-8.2(F)(5); and (c) a brief description of the watershed directly upstream and downstream of the parcel , including the size, terrain, type and extent of vegetation cover and degree of development for all areas draining to the project site. (H) Final Development Plans and Subdivision Plats (1) Minimum standards Final development plans and subdivision plats shall meet the minimum standards described in Subsection 14-8.2(D) and (G). (2) Submittals Submittals for final development plans and subdivision plats shall include: (a) all submittals required pursuant to Subsection 14-8.2(F); (b) a long-term maintenance schedule for the life of the stormwater management measures, including the time frame for completion and the responsible party who shall perform the maintenance; and (c) an as-built certification signature block to be executed by a professional engineer after the project completion to ensure that the constructed stormwater management systems comply with the approved stormwater plans. (I) Inspections and Violations During Construction Process (1) For all nonresidential projects and all residential projects that do not qualify as minor development , an applicant shall notify the land use director to set up an inspection at the following times: (a) when the construction erosion and sediment control devices and measures are in place; (b) when final stormwater management measures are completed; (c) when the final site restoration measures are completed; provided, however, that if final site restoration measures are being delayed due to the season, the applicant shall notify the land use director when temporary erosion control measures, for use until site restoration is complete, in place and ready for inspection; and (d) further construction or issuance of any permits shall not occur until written approval has been granted by the inspector after each inspection that the best management practices and stormwater management control methods have been completed in accordance with approved plans; (2) the land use director may enter upon any property subject to this Subsection 14-8.2 at reasonable times to conduct inspections of grading , erosion and stormwater management measures to determine compliance with city policies and procedures and to carry out duties in the enforcement of this Subsection 14-8.2; and (3) the land use director may waive or consolidate any inspections required under this Section 14-8.2. (J) Dedications, Easements and Rights of Way (1) All land below the base flood elevation for a one percent, twenty-four-hour storm event shall be dedicated as a drainage easement and as public or private open space or public right of way . (2) Dedications to the city may be required by the city engineer for the components of the stormwater drainage system, including access for maintenance. The types of all easements and open space dedications shall be determined by the city engineer . If a dedication is required, it shall be designated on the plan or plat and in effect prior to construction permit approval. (3) An applicant may make requests for acceptance of dedications of a stormwater drainage system to the city ; however, the city is not obligated to accept a dedication offer. Only the governing body may accept dedications to the city . If a dedication is offered to and accepted by the city , it shall be designated on the plan or plat and shall be in effect prior to construction permit approval. (K) Long-Term Maintenance Responsibilities and Inspections (1) Responsibilities All stormwater management measures and facilities shall be maintained by the fee simple owner of the property or a property owners association, unless a dedication of the stormwater management system was required and accepted by the city , in which case, the city is responsible for maintenance. The stormwater management system shall be maintained in good condition and promptly repaired. Maintenance shall include the repair and restoration of all grade surfaces, walls , swales , drains, dams, ponds, basins, site restoration measures, associated vegetation and any other stormwater measure constructed on site. The maintenance shall be in accordance with approved stormwater management plans. (2) City Inspections The city or its authorized agent may enter upon a property that is subject to this Section 14-8.2 at reasonable times to access the stormwater management system to ensure that the system is maintained in proper working condition that meets the approved stormwater management plans and the objectives and minimum standards of this section. (3) Maintenance Violations If, after notice by the city to correct a violation requiring maintenance work, satisfactory corrections are not made by the owner or responsible party within a reasonable period of time, the city may perform all necessary work to place the facility in proper working condition. The owner or responsible party of the facility shall be assessed the associated costs of the work.

(Ord. No. 2019-27, § 11)

Ask a question about Santa Fe law

Corpus searches the Santa Fe sections it holds and shows the ones that match, with their citations. Free, no sign-in.