§ 22-5.7 — Compliance with specifications; acceptance by city
Code of Ordinances of the City of Santa Fe, New Mexico (Codified through Ordinance No. 2026-16, adopted June 24, 2026. (Supp. No. 25)) · Santa Fe Municipal Code § 22-5.7
Corpus is an independent public-information project, not the official City of Santa Fe website. Stable reference: corpuslaw.us/code/e6b9df2a-3b41-4714-ba8d-1775e9a448d2
22-5.7 - Compliance with specifications; acceptance by city.
Upon completion of construction satisfactory to the city, the improvements shall be formally accepted by the city. Completion of construction satisfactory to the city shall not be established until the division has received the following: A. As-built drawings, television logs and tapes which have been reviewed and found acceptable by the division; and B. The engineer whose design supported the construction permit has certified in writing that the constructed improvements have been properly inspected during construction and were installed in conformance with the original specifications or with approved written change orders. If the construction of the sanitary sewers does not meet the specifications, the improvements shall not be accepted by the city and the contractor shall be required to make the corrections necessary for the work to conform to such specifications. All corrective work shall be accomplished within sixty (60) calendar days from notice of non-compliance by the division. Failure of the contractor to perform corrective work, or complete the requirements for acceptance by the city shall entitle the city to execute the bond and complete the work as designed.
(Ord. #1997-3, § 33)