§ 22-6.7 — special sewer construction and assessments; authorization
Code of Ordinances of the City of Santa Fe, New Mexico (Codified through Ordinance No. 2026-16, adopted June 24, 2026. (Supp. No. 25)) · Santa Fe Municipal Code § 22-6.7
Corpus is an independent public-information project, not the official City of Santa Fe website. Stable reference: corpuslaw.us/code/fbab1cb7-8264-480d-979a-ca417c05b037
22-6.7 - special sewer construction and assessments; authorization.
When the city pays for construction of a new sewer main, the governing body shall establish a special sewer connection assessment district by ordinance. The connection district shall not be applied to sewer line replacements or to lines funded out of an improvement district under Sections 3-33-3 through 3-33-24 NMSA 1978. The ordinance shall: A. Define the geographic area to be benefited by the sewer main; B. State the projected number of residential units and describe projected commercial development within the defined service area, based on the city's plans and zoning. The potential number of commercial outlets shall be estimated based on comparable existing structures and applicable code requirements; C. Project the "residential unit equivalents" within the service area. This figure shall be calculated by dividing the estimated number of commercial outlets by four (4) and adding the projected number of residential units to be served by the new sewer main; D. State the projected cost of the sewer main, based on accepted construction bids, design costs and bonding costs and shall state the percentage of this cost which directly benefits the service area; E. Set a base year special sewer connection assessment, based on total projected cost which directly benefits the service area divided by the number of "residential unit equivalents" projected within the service area; F. Set an annual interest rate to be applied to the base year assessment. This interest shall be compounded each twelve (12) months following the effective date of the ordinance. The interest rate shall be equal to the interest rate paid by the city on bonds issued to pay for the sewer main construction. If no bonds are issued for the project, the interest rate shall be equal to the rate paid by the city for the most recent bond issued before the effective date of the ordinance; and G. Assess each property owner who is required to connect or voluntarily connects with sewers within the service area a fee equal to the base year special sewer connection plus interest compounded as set out above. This fee shall be assessed for each residential unit and for every four (4) outlets or fraction thereof in a commercial structure connecting to the sewer. This fee shall be assessed in addition to the sewer service connection fee set out in subsection 22-4.6 SFCC 1987.
(Ord. #1997-3, § 44)
Ask a question about Santa Fe law
Corpus searches the Santa Fe sections it holds and shows the ones that match, with their citations. Free, no sign-in.
