For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22-9.5 — Wastewater permit eligibility

Code of Ordinances of the City of Santa Fe, New Mexico (Codified through Ordinance No. 2026-16, adopted June 24, 2026. (Supp. No. 25)) · Santa Fe Municipal Code § 22-9.5

Corpus is an independent public-information project, not the official City of Santa Fe website. Stable reference: corpuslaw.us/code/300b0f09-581b-413a-ae32-31e7f98206f6

22-9.5 - Wastewater permit eligibility.

A. When requested by the division, users must submit information on the nature and characteristics of their wastewater by completing a wastewater questionnaire. The division is authorized to prepare a form for this purpose and may periodically require users to respond to the questionnaire. Failure to accurately complete this questionnaire within thirty (30) calendar days shall be grounds for disallowing or terminating service to the industrial user and shall be considered a violation of this section. Additional information may be requested and/or a facility inspection performed by the division to assist in determining the need to permit an industrial user. B. The POTW may deny or condition new or increased contributions of pollutants, or changes in the nature of pollutants, to the POTW by industrial users where such contributions do not meet applicable pretreatment standards and requirements or where such contributions would cause the POTW to violate its NPDES permit. C. The POTW by permit, or similar means, will control the contribution to the POTW by each industrial user to ensure compliance with applicable pretreatment standards and requirements. In the case of industrial users identified as significant under 40 CFR 403.3(t), this control shall be achieved through permits or equivalent individual control mechanisms issued to each such user. D. It shall be unlawful for significant industrial users to discharge wastewater into the city's sanitary sewer system without first obtaining a wastewater discharge permit from the division. Any violation of the terms and conditions of a wastewater permit shall be deemed a violation of this section and subjects the industrial user to the sanctions set out in this section. Obtaining a wastewater permit does not relieve a permittee of its obligation to obtain other permits required by federal, state, local or other applicable laws. Under special conditions, at the division directors discretion, may require other industrial users, including septage waste haulers, to obtain discharge permits as reasonably necessary to carry out the purposes of this section. E. Upon notice from the division, any significant industrial user who is currently not permitted by the division and who discharges industrial waste into the POTW prior to the effective date of this section [6] and who wishes to continue such discharges in the future, shall within ninety (90) calendar days after said notice, apply to the division for a discharge permit in accordance with this section, and shall not cause or allow discharges to the system to continue after one hundred eighty (180) calendar days of the effective date of this section except in accordance with a permit issued by the division. F. Any significant industrial user proposing to begin or recommence discharging industrial wastes into the POTW shall be required to obtain a discharge permit prior to beginning such discharge. Any industrial user who has ceased discharge for any reason for a period of six (6) months or longer shall be considered a new source. G. All industrial users required to have a permit must submit the following information on an application form provided by the division. Incomplete or inaccurate applications will not be processed and will be returned to the industrial user for revision. (1) Name, mailing address, and business location (if different from the mailing address); (2) Environmental control permits held by or for the facility; (3) Material safety data sheets; (4) Standard industrial classification (SIC) codes for the facility and any facility processes for which categorical pretreatment standards have been promulgated; (5) Description of activities, facilities, and plant processes on the premises, including a list of all raw materials and chemicals used at the facility; (6) Number and type of employees, and hours of operation, and proposed or actual hours of operation of the pretreatment system; (7) Each product and by-product produced by type, amount, process or processes and rate of production; (8) Type and amount of raw materials process (average and maximum per day); (9) The site plans, floor plans, and mechanical and plumbing plans and details to show all sewers, floor drains, and appurtenances by size, location and elevation, and all points of discharge; (10) Time and duration of the discharge; (11) Measured or estimated average daily and maximum daily flow, in gallons per day, to the municipal system from categorical and other permitted process streams and other streams as necessary to use the combined wastewater formula in 40 CFR 403.6(e); (12) Daily maximum, daily average, and monthly average wastewater flow rates, including daily, monthly, and seasonal variations, if any; (13) Wastewater constituents and characteristics, including but not limited to any pollutants in the discharge which are limited by any federal, state, or local standards, pretreatment standards applicable to each categorical and other permitted process; and nature and concentration (or mass if pretreatment is required) of pollutants in each process (daily maximum and average concentration or mass when required by a pretreatment standard). Sampling and analysis will be undertaken in accordance with 40 CFR Part 136 and with any local rule or regulation and shall demonstrate compliance with all local, state and federal discharge regulations; (14) A statement by an authorized representative of the user and by a qualified professional as determined by the division verifying that the pretreatment standards listed in this section are not being violated, and if they are, what additional pretreatment is reasonably necessary. The statement shall contain certification by the authorized representative of the user and by the qualified professional in the form set forth in subsection 22-9.5H; (15) If additional pretreatment and/or operation and maintenance will be reasonably required to meet the pretreatment standards, the industrial user shall indicate the shortest practicable time schedule necessary to accomplish installation or implementation of such additional treatment and/or O&M. The completion date in this schedule shall not be longer than the compliance date established for the applicable pretreatment standard. The following conditions apply to this schedule: (a) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include hiring an engineer, completing preliminary plans, completing construction, beginning operation, and conducting routine operation). No increment referred to above shall exceed nine (9) months, nor shall the total compliance period exceed eighteen (18) months; and (b) No later than seven (7) calendar days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the division including, as a minimum, whether or not it has complied with the increment of progress, the reason for any delay, and if appropriate, the steps being taken by the user to return to the established schedule. In no event shall more than nine (9) months elapse between such progress reports to the division. (16) Any other information as may be deemed by the division to be reasonably necessary to evaluate the permit application; and (17) ALARA plans as set forth in Section 22-9.4 I SFCC 1987. H. All permit applications, ALARA plans as set forth in subsection 22-9.4I and industrial user reports must contain the following certification statement and be signed by an authorized representative of the industrial user. "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment."

(Ord. #2006-42, § 7)

Ask a question about Santa Fe law

Corpus searches the Santa Fe sections it holds and shows the ones that match, with their citations. Free, no sign-in.