§ 23-2.8 — Permit application
Code of Ordinances of the City of Santa Fe, New Mexico (Codified through Ordinance No. 2026-16, adopted June 24, 2026. (Supp. No. 25)) · Santa Fe Municipal Code § 23-2.8
Corpus is an independent public-information project, not the official City of Santa Fe website. Stable reference: corpuslaw.us/code/87ae86f6-0a55-4c57-b144-ce0ac1eaed25
23-2.8 - Permit application.
A. Every person, required to obtain a street cut permit by this section must either be licensed or must be a franchised utility company. The person shall make written application on forms provided by the city prior to the performance of any work. The written application shall state: (1) The name and title of the person; (2) The business telephone number of the person; (3) The business mailing address and principal place of business of the person; (4) An estimate of the location and dimensions of the installation or removal for which the street cut is to be made; (5) The purpose of the facility and the estimated beginning and end dates of the period which will be required to complete such work, including backfilling said street cut, removing all obstructions, material and debris and restoration of the surface. B. A franchised utility company is authorized to cut a public place without obtaining a street cut permit for the purpose of raising or lowering a substructure opening to meet grade changes brought about by city maintenance, repairs or resurfacing or for the installation, reinstallation or removal of a street light or utility pole, provided the raising or lowering a substructure opening occurs within two (2) calendar weeks of the planned starting date for the paving overlay project or major street restoration. C. A franchised utility company is authorized to obtain a single street cut permit in those situations in which the franchised utility company makes separate street cuts within the same right-of-way intersection as part of the same franchised utility company project. D. The approved permit shall be the grant of authority for the permittee to occupy the public place as described in the permit. Normally this permit will be issued within two (2) business days after filing the application not including the day the application is filed. E. The street cut application when approved and signed by the director, constitutes a street cut permit. F. The permittee, other than franchised utility company, shall begin work at the site indicated in the street cut permit within three (3) business days from the date the permit is issued, unless the city extends that period due to weather conditions. Should no work be started at the work site within the three-day period and the city has not granted a time extension, the permit shall be null and void, with no reimbursement of fees. The applicant shall obtain a new permit, including payment of the permit fees before any work is started. After a street cut is commenced, the permittee shall perform with diligence all work covered by the street cut permit and shall promptly complete work and restore the public place. G. A franchised utility company shall begin work at the site indicated in the street cut permit within three (3) business days from the date set in the permit for commencement of construction unless the city extends that period due to weather conditions or other conditions beyond the control of the franchised utility company. Should no work be started at the work site within the three-day period and the city has not granted a time extension, the permit shall be null and void, with no reimbursement of fees. H. In the event of an emergency, street cuts may be made by a franchised utility company without first obtaining a street cut permit therefor, provided that each franchised utility company so making an emergency street cut shall file their application for a street cut permit within two (2) business days after the city is open for business. I. A franchised utility company is authorized to file its application for a street cut permit and all supporting data for a street cut for all projects except major projects through the use of a telecopy machine located in the city offices in accordance with procedures set up between the director and the franchised utility company.
(Ord. #1988-2, § 9)
Ask a question about Santa Fe law
Corpus searches the Santa Fe sections it holds and shows the ones that match, with their citations. Free, no sign-in.