For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 27-2.8 — Obligations of providers regarding the public rights-of-way

Code of Ordinances of the City of Santa Fe, New Mexico (Codified through Ordinance No. 2026-16, adopted June 24, 2026. (Supp. No. 25)) · Santa Fe Municipal Code § 27-2.8

Corpus is an independent public-information project, not the official City of Santa Fe website. Stable reference: corpuslaw.us/code/80973ad4-2ede-4744-b943-8d6899e71896

27-2.8 - Obligations of providers regarding the public rights-of-way.

A. Compliance with Law. Providers are explicitly subject to the police powers of the city, all other lawful governmental powers, and the city's rights as a property owner under state and federal laws. This section is governed by and construed and enforced in accordance with the laws of the state of New Mexico. B. Land Use Requirements. Providers shall comply with subsection 27-2.19 SFCC 1987 regarding land use requirements. C. Construction Plans and Drawings. (1) Before the provider may conduct underground work involving excavation, new construction, or major relocation work in any public rights-of-way: (a) The provider shall first notify the city through the acquisition of a street cut permit as per Section 23-2 SFCC 1987 and shall comply with any special conditions relating to location, scheduling, coordination, and public safety; and (b) The provider shall file maps and/or drawings with the director showing the location of any construction or extension of its facilities and services in any public rights-of-way of the city. For multi-conduit duct banks, maps and drawings shall show overall size, material, and configuration of the duct bank showing the horizontal and vertical locations within the rights-of-way, size and type of equipment and materials and location of other utilities. The provider shall provide city with updates of the maps and drawings showing the location of any new construction, extension, or relocation of its underground facilities or line spot such facilities. (2) Proposed construction work to be done by the provider shall be performed in a safe manner and in accordance with applicable federal and state laws and city requirements now or hereinafter existing. D. Construction Forecast. On or before the first day of June each year within three (3) years of which the provider anticipates constructing all or any identified and approved portion of its telecommunications network in the city's public rights-of-way, the city and provider will meet and exchange three (3) year construction forecasts, including aerial builds, together with such additional information as the city and provider deem appropriate relating to projects planned within the city. Any such information may be designated by provider as proprietary if the provider believes in good faith that such information is exempt from disclosure under the New Mexico Inspection of Public Records Act, Section 14-2 NMSA 1978, or other applicable law. Provider shall mark any such materials by clearly marking each page, or portion thereof, for which a proprietary designation is claimed. The city shall maintain the confidentiality of such information to the maximum extent permitted by law. The provider has the burden of demonstrating that such information is exempt from disclosure. Provider will use best efforts to forecast construction for the future, however, the city recognizes that construction is driven by customer demand for service which is highly unpredictable. The provider shall not be subject to termination, suspension, fines or other penalties if its actual construction does not meet the timelines stated in the forecasts. The city and provider shall hold such additional meetings as they deem necessary to exchange additional information with a view toward coordinating their respective activities in these areas where such coordination will prove mutually beneficial to the public by minimizing disruption costs to the public. Provider will comply with all building and zoning codes and assure that aesthetic and other relevant planning principles have been given due consideration. It is recognized that, notwithstanding the foregoing, the city retains absolute discretion over the timing and all other aspects of the city's proposed projects. The parties will make reasonable efforts to allow each party's work to be incorporated in the other's respective projects. Provider will not cut or otherwise disturb any new or rehabilitated roadway within two (2) years of its placement as limited by and pursuant to Section 23-2 SFCC 1987 Excavations, Street Cuts and Restoration Ordinance, except or unless in emergency conditions. Where conflict occurs between the city's construction plans and schedules and the provider's construction plans and schedules, the city's plans and schedules shall take precedence. Where unresolved conflicts occur between the two (2) or more providers' construction plans and schedules, the city shall determine precedence. E. Installations, Excavations, and Restorations. (1) Pursuant to any franchise granted under this section, the provider shall have the right to excavate in, occupy, and use any and all public rights-of-way for the purpose of installing, erecting, constructing, repairing, maintaining, removing, relocating, and operating its facilities after obtaining any and all appropriate permits from the city, and in compliance therewith provided, however, that: (a) The provider shall not place any of its facilities on, over, under, or within any city park, open space or trail not located in a public rights-of-way, duly designated as such by the city except in accordance with city requirements; (b) Where appropriate and as may be required by the city through any permitting process, installation, excavations, and restorations affecting street and/or lane closures shall be approved by the city and in accordance with current city policies and ordinances; (c) The city reserves the right to direct the coordination and scheduling of any provider projects where such project may be reasonably coordinated with the placement of other provider facilities. Otherwise, and subject to city permitting processes and approvals, it is recognized that, notwithstanding the foregoing, the provider retains discretion over the timing of the provider's proposed projects. In directing these activities, the city will make a good faith attempt to accommodate the provider's construction schedule and desired service initiation dates as long as they were disclosed in the construction schedule provided for in subsection 27-2.8D SFCC 1987; (d) The provider shall, to the extent feasible, employ "trenchless" technology (for example, directional boring) in the placement of its underground facilities; and (e) A franchise does not include the right to use the city's sewer or storm sewers, which requires a separate discretionary license from the city and fee for such application and use. (2) Except in an emergency, not less than two (2) working days prior to the commencement of any work by the provider which involves excavation in any public rights-of-way, the provider shall notify the director through the street cut permit process, including payment for any and all fees, as set forth in Section 23-2 SFCC 1987. Provider shall comply with Section 23-2 SFCC 1987 as it now or may exist in the future. In an emergency, the director shall be notified the next working day and shall be provided with a description of the emergency and the action taken. The right of the city to require a post-emergency city permit(s), inspection(s) and fee(s) is preserved. (3) Whenever work is performed in any public rights-of-way, the provider shall take all reasonable precautions to minimize interruption to traffic flow, damage to property, or creation of a hazardous condition. A plan for traffic control shall be provided to the director for their approval prior to issuance of a permit. (4) After any excavation shall be made and after work is completed, the provider, at provider expense, shall as soon as practicable but not longer than forty-eight (48) hours, weather permitting, remove all surplus material in compliance with specifications, requirements, and regulations of the city in effect at the time of such restoration and restore the portion of the public rights-of-way to the same condition as nearly as practicable to its condition before the start of construction and in a manner consistent with the normal specifications and requirements of the city. All vegetation, landscaping and grounds removed, damaged or disturbed as a result of the construction, installation, maintenance, repair or replacement of telecommunications facilities, shall be replaced, or restored, as nearly as may be practicable, to the condition existing prior to performance of work. If the provider fails to restore promptly the affected portion of the public rights-of-way following written notice to provider, and reasonable opportunity to cure, the city may make the restoration in a manner satisfactory to city, and all reasonable and documented costs incurred for such restoration, whether done with city work forces and equipment or otherwise, shall be paid by the provider, or recovered from any posted bonds, including the cost of any inspectors the city may assign to the project. (5) The provider shall be responsible for the maintenance of its own equipment, facilities, and appurtenances placed upon, over, or under the public rights-of-way, including the removal of all graffiti therefrom. If after ten (10) days' notice, unless a lesser time period is required by another city ordinance, such graffiti has not been removed, it may be removed by the city at provider's sole cost which shall be paid in full by provider to city within ten (10) days of the date of the city's billing. (6) The provider shall ensure its public facilities in public rights-of-way are located and constructed in a manner such that the public's physical access to such rights-of-way is not impaired and in full compliance with the Americans with Disabilities Act (ADA). Where existing facilities constructed prior to ADA (legal nonconforming facilities) are modified or replaced, the provider shall insure that such modification or replacement shall then fully comply with ADA. Any intersection upgrades shall include upgrading all four (4) corners with ADA accessibility compliant ramps. Following notice by the city of an ADA construction problem, the provider shall have thirty (30) days or other reasonable time to remedy the problem. In the event that the city and the provider cannot agree that a problem exists, the city and the provider shall follow the dispute resolution provisions of this section. F. Location and Relocation of Facilities. (1) All facilities of the provider shall be placed so that they do not interfere with the use of public rights-of-way by the city and shall only be placed after approval of the location by the city's planning commission pursuant to subsection 27-2.19 SFCC 1987 and by the director and in accordance with all barricade, excavation and permitting ordinances and regulations adopted by the city governing the location of facilities. The city reserves the right to construct, install, maintain, and operate any public improvement, work, or facility, including without limitation, telecommunications facilities, do any work that the city may find desirable on, over, or under any public rights-of-way, and vacate, alter, or close any public rights-of-way subject to provider's rights and obligations under subsections 27-2.8F(2) and (3) SFCC 1987. All such work shall be done, if possible, in such a manner as not to obstruct, injure, or prevent use and operation of the provider's network or system. Pursuant to any franchise, provider agrees to obtain the city's express written approval before placing structures in public rights-of-way that do not currently exist in public rights-of-way. (2) The city may require the removal or relocation of facilities used by the provider in any public rights-of-way as follows: (a) After notice to the provider, where relocation cannot reasonably be avoided and where the city and the provider agree that no reasonable alternative exists, the city may require the removal or relocation of facilities used by the provider in any public rights-of-way as may reasonably be required by the city or caused or occasioned by any city project, including but not limited to the installation of water, sanitary sewer, storm drainage, or traffic signal facilities, road reconstruction, or other public right-of-way construction. The provider shall complete the removal and relocation of such facilities within sixty (60) days following notice to do so from the city. Projects requiring, in the opinion of the director after consultation with the provider, in excess of sixty (60) days to complete shall be completed in a time frame determined by director on a project specific basis. Prior to any such relocation, the city agrees to provide for a suitable similarly sized location for such relocated facilities sufficient to maintain service. The cost of any removal or relocation of its facilities shall be borne by the provider. To the extent that a delay in a city project is due to provider's relocation, then such provider shall pay all reasonable, documented expenses and costs incurred by the city as a result of and proportionate to its contribution to the delay. Notwithstanding the foregoing, provider shall not be required by the city to relocate its facilities to accommodate another provider or other nongovernmental third party in the city. The costs of any relocations occasioned by another provider or authorized non-governmental rights-of-way user of the city in no event shall be the responsibility of the city. (b) The provider shall reconstruct, replace, or restore any street, alley, or public way or place in a timely fashion and any water, sewer, sanitary sewer, storm drainage, traffic signalization facilities, or other facility of the city disturbed by the provider, without cost to the city, to the condition that existed prior to the work by provider, consistent with city standards and specifications for public works construction. Any facility so disturbed by the provider shall be reconstructed, replaced, or restored only under the supervision of city personnel. (c) Subject to the provisions of this subsection and upon notice to the city and receipt of all required city permits, the provider may remove or relocate facilities maintained by the provider on its own initiative. (3) Where the city, acting through itself, an agent, contractor, or permit holder, proposes to improve a street, which requires the relocation of an existing aerial facility within the public rights-of-way under its jurisdiction or control, the provider shall replace such overhead distribution facilities as are then within the affected right-of-way with underground facilities unless the provider can demonstrate to the city that such facilities cannot functionally be located underground or that the cost of relocation is economically unreasonable. All such relocations of provider facilities shall be at such provider's expense. The conversion from overhead to underground shall be nondiscriminatory and shall be conditioned upon the city requiring the under grounding of all existing and new facilities located or to be located in the area. Such replacement of overhead with underground distribution facilities of a provider shall be paid for by such provider. G. Public Works and Improvements. (1) The city reserves the right to construct, install, maintain, and operate any public improvement, work, or facility and do any work that the city may find desirable on, over, or under any public rights-of-way including rights-of-way facilities of any type and nature owned or controlled by the city. All such work shall be done, if possible, in such manner as not to obstruct, injure, or prevent free use and operation of the provider's telecommunications network, and shall be performed as expressly provided in subsection 27-2.8F(2) SFCC 1987. (2) Whenever the city shall excavate or perform any work in any present and/or future public rights-of-way of the city, or shall contract for such excavation or work, where such excavation or work may disturb but not require removal or relocation of provider's facilities, the city shall notify the provider sufficiently in advance of such contemplated excavation or work to enable the provider to take such measures as may be deemed necessary to protect and support such facilities from damage and possible inconvenience or injury to the public or the city's public rights-of-way. If the provider cannot take such measures, or if the city's work is performed in response to an emergency, the provider shall be required to relocate its facilities in accordance with this section. In such case, the provider upon request shall furnish field markings to the city or its contractor, as the case may be, showing the location of all its facilities in the area involved in such proposed excavation or other work. (3) Subject to the requirements of subsection 27-2.8F SFCC 1987, whenever the city shall legally vacate (terminate all of the city's rights in) any public rights-of-way for the convenience or benefit of any person or governmental agency or instrumentality, the provider's rights shall be preserved as to any of its facilities then existing in such public rights-of-way. H. Moving of Buildings. Whenever it becomes necessary to temporarily rearrange, remove, lower, or raise the aerial cables or wires or other apparatus of the provider to permit the passage of any building, machinery, or other object, the provider shall perform such rearrangement upon the receipt of written notice no less than thirty (30) days (or less time in the event of an emergency as determined by the city) prior to the move from the person or persons desiring to move said building, machinery, or other objects. The written notice shall detail the route and timing of movement of the building, machinery, or other object. The costs incurred by the provider in making such rearrangements of its aerial plant will be borne, excepting the city, by the person or persons seeking such rearrangement, unless the aerial plant is placed or maintained in violation of the applicable rules of any local, state, or federal regulatory agency and thereby interferes with the movement. I. Safety Standards. The facilities of the provider shall at all times be constructed, operated, and maintained so as to protect and safeguard the health and safety of the public, and to this end provider shall observe all rules pertaining thereto now or hereinafter existing prescribed by any local, state, or federal regulatory authority. J. Joint Use Agreements. The provider is authorized and encouraged to enter into joint-use agreements with any person or entity franchised by the city with respect to the placement or use of a telecommunications facility or network. The provider may require any such person or entity to pay reasonable compensation for such joint use and to furnish evidence of adequate insurance covering the provider and adequate bonds covering the performance of the person or entity attaching to the provider's telecommunications network as a condition precedent to granting permission to any such person or entity to attach its telecommunications network to the provider's network, provided that the provider's requirements for such insurance shall be reasonable. K. Interference. The provider shall not be required to attach its facilities to the facilities of any other person or to permit the facilities of any other person to be attached to the provider's facilities if it can be shown to the reasonable satisfaction of the city that the other person is not willing to accept the terms of a joint use agreement, the provider will be subjected to increased risks of interruption of service or if the facilities of such other person are not of the character, design, and construction required by, or are not being maintained in accordance with industry standards or practice or in a manner permitted by law. L. Supplying Maps. Provider shall maintain on file all available maps, operational data, and reports pertaining to its operations in the city. The city may inspect the maps, data, and reports at any time during business hours. The provider shall furnish to the city, as soon as practicable and without charge, current "As-Built" maps in the city's GIS format or compatible data base, showing the location and dimension of its telecommunications network located in the rights-of-way, but not other proprietary information, used in operating the provider's telecommunications network within the city of Santa Fe. M. Limitation on Privileges. All rights, authority, and grants contained or conferred are also conditioned upon the understanding and agreement that the exercise of these privileges in the public rights-of-way of the city are not to operate in any way so as to be an enhancement of the provider's properties or values or to be an asset or item of ownership in any appraisal thereof in the event of a city acquisition, by purchase or otherwise. In the event that the city shall at any time hereafter acquire the property of the provider, by purchase or otherwise, the value of any franchise shall be fixed and determined at one dollar ($1.00).

(Ord. #2010-14, § 9; Ord. #2010-33 § 6; Ord. No. 2016-42 § 4; Ord. No. 2023-7, Exh. A)

Ask a question about Santa Fe law

Corpus searches the Santa Fe sections it holds and shows the ones that match, with their citations. Free, no sign-in.