For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7-1.11 — Permit Fees

Code of Ordinances of the City of Santa Fe, New Mexico (Codified through Ordinance No. 2026-16, adopted June 24, 2026. (Supp. No. 25)) · Santa Fe Municipal Code § 7-1.11

Corpus is an independent public-information project, not the official City of Santa Fe website. Stable reference: corpuslaw.us/code/9442ce83-8467-4a12-876f-c184e6c051f2

7-1.11 - Permit Fees.

Fees for permits and other matters associated with Chapter 7 SFCC 1987 are established in Table 7-1.11-1 below. Table 7-1.11-1 FEE TYPE | FEE | UNIT BUILDING PERMIT ACTIVITIES Mandatory Pre-Submittal Building Permit Metting - Large Projects with Multiple Subject Matter Experts (1.5 hours) | $500.00 | Per Meeting Optional Pre-Submittal Building Permit Meeting - Small Projects with 1 or 2 Subject Matter Experts (1 hour) | $150.00 | Per Meeting Pre-Submittal Building Permit Plan Review Consultations and Residential Master Model Review | $60.00 | Per Hour Green Building Code - Early Consultation | $60.00 | Per Consultation Green Building Code - Building Permit Review (Residential) | $100.00 | Per Permit PV Solar (Commercial or Residential) | $100.00 | Per Permit Permit Revisions/Corrections Review (1st Revision review per station free, and not subject to fee) | $60.00 | Per Hour Building Permit Extension | $100.00 | Per Six Month Extension Building Permit Revision (change information and reissue permit board) | $120.00 | Per Revision PRIMARY BUILDING PERMIT ADMINISTRATIVE FEES Administrative Fee | $40.00 | Each Permit Construction Valuation of (rounded to nearest full dollar): $1.00 to $500.00 | $25.00 $501.00 to $2,000.00 | $25.35 for the first $500.00 plus $3.05 for each additional $100.00 or fraction thereof, up to and including $2,000.00 $2,001.00 to $25,000.00 | $69.25 for the first $2,001.00 plus $14.00 for each additional $1,000.00 or fraction thereof, up to and including $25,000.00 $25,001 to $50,000 | $391.75 for the first $25,001 plus $10.10 for each additional $1000 or fraction thereof, up to and including $50,000 $50,001 to $100,000 | $643.75 for the first $50,001 plus $7 for each additional $1000 or fraction thereof, up to and including $100,000 $100,001 to $275,000 | $993.75 for the first $100,001 plus $5.93 for each additional $1000 or fraction thereof, up to and including $275,000 $275,001 to $500,000 | $1,830.00 for the first $275,001 plus $7.30 for each additional $1000 or fraction thereof, up to and including $500,000 $275,001 to $500,000 | $1,830.00 for the first $275,001 plus $7.30 for each additional $1000 or fraction thereof, up to and including $500,000 $500,001 to $1,000,000 | $3518.37 for the first $500,000 plus $5.60 for each additional $1000 or fraction thereof, up to and including $1,000,000 $1,000,001 and up | $5,893.37 for the first $1,000,001 plus $4.40 for each additional $1,000 or fraction thereof Signage Permit | $0.40/sq. ft. plus $45.00 review fee | Square Feet Residential Plan Review | 50% of Permit Fee Commercial Plan Review | 75% of Permit Fee Plan Amendment Review Fee | $60/Hr (minimum 2 hours) | Hour Demolition Permit Fee (Residential) | $40.00 | Permit Demolition Permit Fee (Commercial) | $60.00 | Permit Building Without a Permit | Double the original permit fee | Permit Expedited Plan Review | Cost of preapproved third party plan review + 20% service charge for administration and other required review | Permit ELECTRICAL PERMIT FEES Issuance of Electrical Permit (Commercial & Residential) | $40.00 | Permit Meter Loop New thru 100 AMP (Residential) | $45.00 | Permit 150-200 AMP/panel thru 200 AMP (Residential) | $72.00 | Permit Over 200 AMP/Panel thru 320 AMP (Residential) | $99.00 | Permit Over 320 AMP/Panel thru 400 AMP (Residential) | $225.00 | Permit Over 400 AMP/Panel (Residential) | $360.00 | Permit Over 200 AMP/Panel thru 400 AMP (Commercial) | $225.00 | Permit Over 400 AMP/Panel thru 600 AMP (Commercial) | $270.00 | Permit Over 600 AMP/Panel thru 800 AMP (Commercial) | $360.00 | Permit Over 800 AMP/Panel thru 1000 AMP (Commercial) | $450.00 | Permit Over 1000 AMP/Panel thru 2000 AMP (Commercial) | $630.00 | Permit Over 2000 AMP/Panel (Commercial) | $900.00 | Permit Temporary Power Pole (Commercial & Residential) | $27.00 | Permit Mobile Home Service | $27.00 | Permit Customer-Owned Power Distribution | $45.00 | Permit Each Pole | $6.00 | Permit Per 100 feet of Underground Wiring | $6.00 | Permit Service Change Only/No outlets | $27.00 | Permit Low Voltage | $20.00 | Unit MECHANICAL PERMIT FEES Issuance of Mechanical Permit (Commercial & Residential) | $40.00 | Permit Ventilation System | $10.00 | Permit Central Furnace | $10.00 | Permit Wall Heater | $10.00 | Permit Refrigeration System | $10.00 | Permit Duct Work System | $10.00 | Permit Solar Space Heating System | $20.00 | Permit Combination Unit HVAC | $10.00 | Permit Chiller | $10.00 | Permit Cooling Tower | $10.00 | Permit Commercial Kitchen Hood | $10.00 | Permit Commercial Duct System | $10.00 | Permit Medical Gas System | $10.00 | Permit Mini Split Installation | $10.00 | Permit Gas Fireplace | $5.00 | Permit Temporary Gas | $10.00 | Permit Temporary Heat | $10.00 | Permit Repairs or Additions, Heating Appliance, Refrigeration Unit, Cooling System | $8.50 | Permit Boiler Replacement or Repair | $8.50 | Permit PLUMBING PERMIT FEES Issuance of Plumbing/Gas Permit (Commercial & Residential) | $50.00 | Permit Exhaust Fan | $5.00 | Permit Water Distribution System | $5.00 | Permit Building Sewer | $5.00 | Permit Water Heater | $5.00 | Permit Each Swimming Pool | $50.00 | Permit Industrial Waste Interceptor/Trap & Vent | $10.00 | Permit Water Conditioner | $8.50 | Permit Evaporative Cooler | $10.00 | Permit Vacuum Breaker or Back Flow Device | $5.00 | Permit Gas Piping System | $5.00 | Permit Gas Appliance | $5.00 | Permit Gas Pipe Outlet | $4.00 | Permit Domestic Hot Water Solar Heating System | $10.00 | Permit Solar Space Heating System | $10.00 | Permit Sewage Ejector/Grinder | $5.00 | Permit Grease Trap/Interceptor | $5.00 | Permit Water Service Line | $5.00 | Permit Gas Yard Line | $5.00 | Permit Chilled Water Distribution System | $10.00 | Permit Roof Drainage System | $10.00 | Permit Hot Water Solar Potable System | $10.00 | Permit Gray Water System | $10.00 | Permit Sewer Yard Line | $10.00 | Permit Sewer Lateral | $10.00 | Permit Sewer Connection | $40.00 | Permit Line | $10.00 | Permit Lawn Sprinkler System | $13.00 | Permit Temporary Gas | $10.00 | Permit Temporary Heat | $10.00 | Permit

(Ord. #2020-23, § 2)

Ask a question about Santa Fe law

Corpus searches the Santa Fe sections it holds and shows the ones that match, with their citations. Free, no sign-in.