§ 13.65.270 — Inspection
Code of Ordinances of the City of Sparks, Nevada (Codified through Ordinance No. 2676, adopted July 27, 2026 (Supp. No. 25)) · Sparks Code of Ordinances § 13.65.270
Corpus is an independent public-information project, not the official City of Sparks website. Stable reference: corpuslaw.us/code/a4225268-e530-4558-b56a-ac0dd1682b84
Section 13.65.270 - Inspection.
A. All Construction activities which fall within Sections 13.65.210 through 16.65.280 of this title shall be subject to the inspection provisions provided herein. B. The city maintains the right to inspect any site of construction activity. The responsible person shall schedule inspection through the community development or environmental control departments. An inspection is required to be conducted prior to the initiation of construction to verify placement of storm water controls. Initial inspections must be requested a minimum of twenty-four (24) hours prior to the desired time of inspection, excluding Saturdays, Sundays, and holidays. Follow up inspections will not be scheduled but may occur as follows: 1. Prior to commencing construction when BMP's are in place. 2. At the end of construction when the site has been finished and cleaned and permanent erosion controls are in place and temporary erosion controls have been removed. 3. For those sites with a combination of extreme factors including slopes greater than ten (10) percent, proximity to floodplains and waterways, long project duration (in excess of six (6) months) and environmental sensitivity, additional inspections shall be based upon such reasonable selection processes as may be deemed necessary to carry out the objectives of this title. 4. For phased projects, the city may inspect installed measures per the storm water prevention plan (SWPPP) prior to the commencement of each phase. C. If an inspector determines the installed storm water controls are placing the city at risk of violating its NPDES permit, the inspector may order change to the storm water controls. If the change to the storm water controls is not acceptable or is not immediately implemented, enforcement action may be taken, including but not limited to, verbal or written request for action, notice of violation, administrative fine, stop work order, civil penalty or criminal penalty. D. Emergency control measures may be ordered when pollutants are actually leaving the site. E. A complaint of violation shall be promptly investigated by inspection.
(Ord. 2420, Amended, 01/26/2009; Ord. 2291, Add, 08/22/2005)
Ask a question about Sparks law
Corpus searches the Sparks sections it holds and shows the ones that match, with their citations. Free, no sign-in.
