§ 13.85.080 — Reclaimed water main extensions
Code of Ordinances of the City of Sparks, Nevada (Codified through Ordinance No. 2676, adopted July 27, 2026 (Supp. No. 25)) · Sparks Code of Ordinances § 13.85.080
Corpus is an independent public-information project, not the official City of Sparks website. Stable reference: corpuslaw.us/code/a934b728-9949-4b5b-86ad-ea71e54f9568
Section 13.85.080 - Reclaimed water main extensions.
A. In cases where extension of the City's main is required to provide a reclaimed water supply to a subdivision or other parcel of property, the Customer may construct a mainline service pipe, at his own expense, from points of use to a point where connection can be made directly to the City's then-existing main. No main extensions shall be constructed to provide reclaimed water for single-family residential properties. B. Standard Main Extensions 1. Main extensions constructed by persons for development of subdivisions or other property shall not be considered as reserved for supply to those properties exclusively. Extensions of and connections to such mains shall be permitted when, in the opinion of the City, such connections will not substantially affect supply to the original development or property. 2. The cost of all main extensions to be constructed under this section, including service laterals and other appurtenances, shall be borne by the Developer or Customer. 3. A person proposing an extension to the City reclaimed water distribution system shall submit an application and construction plans in accordance with section 020 of this chapter. 4. Reclaimed water mains and appurtenances shall be located within dedicated rights-of-way or within easement grants to the city not less than twenty (20) feet in width, or as the city may otherwise specify. All rights-of-way or easements shall be indicated on the construction plans submitted and recorded prior to release of approved plans. 5. The minimum size of any main to be constructed as part of the city's distribution system shall be four (4) inches in diameter. 6. Reclaimed water service will not be activated until the city accepts the construction. C. Oversized main extensions. An oversize main extension proposed for construction under this section is subject to subsection B of this section and the city reserves the right to: 1. Determine its appropriate location; and 2. Enter into an agreement with the developer in which the city's participation in construction costs is set forth. D. Participation by the city for the over-sizing of a main extension shall be based on the difference in actual cost of pipe, fittings, and valves between the size required for the main extensions and the size required for over-sizing. The cost difference shall be established by a certified price list from the supplier. Prices quoted on the list shall be the actual prices charged to the buyer. The city may, in lieu of a lump sum payment of the city's portion of the construction costs, arrange with the developer or customer for an alternate method of payment.
(Ord. 2390, Add, 02/25/2008)
Ask a question about Sparks law
Corpus searches the Sparks sections it holds and shows the ones that match, with their citations. Free, no sign-in.
