§ 17.20.020 — Filing of complete plans
Code of Ordinances of the City of Sparks, Nevada (Codified through Ordinance No. 2676, adopted July 27, 2026 (Supp. No. 25)) · Sparks Code of Ordinances § 17.20.020
Corpus is an independent public-information project, not the official City of Sparks website. Stable reference: corpuslaw.us/code/35a39ecd-650a-4df8-a63b-7c4220c54e9c
Section 17.20.020 - Filing of complete plans.
A. After a final plan has been submitted to the public works director, the subdivider shall file with the public works director, at least thirty days prior to the meeting of the city council at which approval of the subdivision is sought, complete plans covering, but not limited to, the specifications and locations of all alleys, streets, curbs, gutters, sidewalks, sewer mains, fire hydrants, subsurface drainage and other features of the subdivision. B. The plans shall include: 1. The original of the final plat; 2. A plan and profile of each street showing clearly existing grades and finished grades, distances, elevations, topography and other pertinent features; 3. A plan and profile of each storm drain and sewer line showing manhole locations, distances and grades, top of manhole elevations and invert of manhole elevations. Storm drain and sewer line plan and profile may be combined with street plan profiles; 4. A grading plan showing the drainage for each lot with existing ground elevations and proposed finished lot grade elevations; 5. Plans for streets, storm drains or sanitary sewers which may be extended in the future shall include sufficient information to assure that such extension of improvements can be accomplished by continuing approximately the same alignment and grade as the proposed improvements; 6. The time schedule for construction of off-site improvements; 7. Plans and profiles of all utilities showing the location of all surface-mounted equipment. These plans may be shown with the street plans and profiles or other appropriate plans. C. The complete plans, when submitted to the public works director, shall be accompanied by a plan checking fee. Plan checking fees, public improvement inspection fees and material testing fees are set by resolution of the City Council. Schedules of these fees are available from the City Clerk and are posted wherever permits are obtained and fees paid. Neither the plan checking fee nor the inspection and testing fee are returnable. D. Following any corrections required by the public works director, the subdivider shall, within ten days prior to presenting the final plat and plans to the city council, resubmit to the public works director: 1. The original final corrected subdivision plat; 2. The original or reproducible corrected improvement plans, specifically plans referred to in subdivisions 2 through 4 of subsection B of this section; 3. Any other plans or specifications as may be required by the public works director. E. Should the subdivider fail to submit the required corrected subdivision plat and improvement plans within one year of the initial submittal, he shall be required to resubmit the complete plans together with the plan check fee.
(Ord. 1763, 1992: Ord. 1250 § 1, 1979: Ord. 1056 § 1, 1976: Ord. 848 § 26, 1971: Ord. 656 § 1, 1966: Ord. 542 § 1, 1963: 1962 Code § 55.330.) (Ord. 2024, Amended, 05/24/1999; 1978, Amended, 03/16/1998)
Ask a question about Sparks law
Corpus searches the Sparks sections it holds and shows the ones that match, with their citations. Free, no sign-in.
