§ 20.03.037 — Renewable energy
Code of Ordinances of the City of Sparks, Nevada (Codified through Ordinance No. 2676, adopted July 27, 2026 (Supp. No. 25)) · Sparks Code of Ordinances § 20.03.037
Corpus is an independent public-information project, not the official City of Sparks website. Stable reference: corpuslaw.us/code/422cb3ff-90ad-4c74-918e-a43044b6914a
Section 20.03.037 - Renewable energy.
Purpose: This chapter promotes and regulates renewable energy production used for private and utility generation of electricity. A. Applicability. This Section applies to any renewable energy production-utility or renewable energy production-private use. B. Solar Energy. 1. Private production. Any solar system and associated equipment is considered an accessory use and requires issuance of a building permit in order to install the equipment. The private solar system shall comply with the following standards: a. There are no restrictions on roof-mounted or building mounted solar systems. b. For ground mounted systems, the solar structure(s) including any associated components shall comply with the accessory structure side and rear yard setback requirements for structures over 200 square feet at five feet from side and rear property line and separation of ten feet from main permissive structure. Ground mounted solar structures shall not be located in front yard or exterior side yard setbacks. The maximum allowable total height is 12 feet from the ground. c. Any solar system can only be located on a parcel which has a primary structure or it will be interpreted to be a renewable energy production-utility. d. The system shall conform to public utility standards. No solar system shall be operated until a net metering agreement has been made with the electrical utility company(s), and the utility company(s) has approved the proposed method of interconnection. This excludes the temporary testing period, not to exceed ten days. Off-grid systems are exempt from this requirement. 2. Utility production. Any utility production using a solar system and associated equipment requires a conditional use permit followed by issuance of a building permit prior to installation of the equipment. The utility production solar system shall comply with the following standards: a. Height. The total height of the tallest structure(s) and setbacks shall be established through the conditional use permit process. b. Fencing. Security fencing shall be placed around the perimeter of the utility solar production facility and associated equipment. The height and materials of the fence shall be determined with the conditional use permit process. c. Warning Signs. Appropriate warning signs shall be placed on tower, electrical equipment and the utility solar production facility entrances. d. Misdirection of Solar Radiation. The utility solar production facility shall be designed and operated to prevent the misdirection of concentrated solar radiation onto nearby property, public roads or other areas accessible to the public. e. Cleaning Chemicals and Solvents. During the operation of the facility, all chemicals or solvents used to clean photovoltaic panels, mirrors or other equipment shall be approved by the city and environmental agencies. f. Roads and Parking. On-site roads for the installation and operation of utility solar production facility shall be minimized and temporary roads shall be regraded and revegetated to natural condition upon completion of construction. All roads, access easements, driveways and parking lots shall be a hard surface to the approval by the Administrator. g. Utility Notification. The system shall conform to the utility standards. No solar energy system shall be operated until a net metering agreement or power purchase agreement has been made with the electrical utility company(s), and the utility company(s) has approved the proposed method of interconnection. This excludes the temporary testing period, not to exceed ten days. Off-grid systems are exempt from this requirement. C. Wind Energy Conversion Systems (WECS). 1. General standards. a. Access. All WECS must comply with the following provisions: 1) The tower shall be designed and installed so that there are no exterior steps, bolts or ladder on the tower readily accessible to the public for a minimum height of 15 feet above the ground. For lattice or guyed towers, sheets of metal or other barriers shall be fastened to the bottom tower sections such that it cannot readily be climbed; and 2) All ground-mounted electrical and control equipment shall be labeled or secured to prevent unauthorized access. b. Rotor safety. Each WECS shall be equipped with both manual and automatic controls to limit the rotational speed of the blade within the design limits of the rotor. The minimum distance between the ground and any protruding blades on WECS shall be 15 feet as measured at the lowest point of the arc of the blades of horizontal shaft and 10 feet as measured at the lowest point of wind machine with a vertical shaft. c. Noise. All WECS shall comply with the noise requirements in this section. These levels, however, may be exceeded during short-term events such as utility outages and severe wind storms (as defined by manufacture specifications). A manufacturer's sound report stating tested noise levels is required with a building permit application. No WECS at installation shall create noise that exceeds a maximum of 60 dB(A), or in excess of 5 dB(A) above the background noise as depicted in the manufacturer's specifications, whichever is greater, as measured at the property line. This level, however, may be exceeded during short-term events such as utility outages and severe wind storms. d. Appearance and Maintenance. All WECS shall comply with the following requirements. (1) Appearance. WECS shall, subject to any applicable standards of the FAA, be of non-reflective, non-obtrusive color: galvanized, off-white, light silver, tan, gray, sand or similar are permitted. The painting or coating shall be kept in good repair for the life of the WECS. Monopole design is required, unless the Administrator finds that monopole structures are not reasonably available in the marketplace, a different design is required by a Nevada or federal agency, or the applicant obtains a variance. (2) Maintenance. WECS shall be maintained in good repair, as recommended by the manufacture's scheduled maintenance or industrial standards, and shall be free from visible rust. (3) Repair and Removal. The owner shall repair any WECS found to be unsafe by an official of the Building and Safety Department to meet federal, state and local safety standards, or be removed within six months. The owner shall remove WECS that are not operated for a continuous period of 6 months. When WECS is removed from the site all associated and ancillary equipment, batteries, devices, structures or supports for that system shall also be removed. For purposes of this section, non-operation includes, but is not limited to, the blades of the WECS remaining stationary so that wind resources are not being converted into electric or mechanical energy, or WECS are no longer connected to the public utility electricity distribution system. e. Lighting. WECS towers and/or blades shall not be artificially lit unless required, in writing, by the Federal Aviation Administration (FAA) or other applicable authority that regulates air safety. f. Signs. The only sign allowed on WECS shall be a logo on the generator housing or pole. The logos shall not exceed eight square inches. g. Utility Notification. The system shall conform to the utility standards. No WECS shall be operated until a net metering agreement or power purchase agreement has been made with the electrical utility company(s), and the utility company(s) has approved the proposed method of interconnection. This excludes the temporary testing period, not to exceed ten days. Off-grid systems shall be exempt from this requirement. 2. Wind energy conversion systems (WECS), private. The following standards apply to private WECS: a. Setbacks. (1) For private WECS, a minimum side and rear setback of 15 feet for WECS up to 40 feet in total height, 25-foot side and rear setback for WECS with total height of 40 to 60 feet and a minimum of 1.1 times the total height side and rear setback for WECS over 60 feet shall be maintained from the project property line. (2) Guy wire anchors may not extend closer than ten feet from the property line. (3) Private WECS shall not be located within the front yard setback of any parcel of land nor within the exterior side yard setback facing a street on a corner parcel of land and shall be placed minimum of ten feet from main structure. b. Height. For private WECS, the maximum total height shall be highest point of any structure on the site plus 20 feet. c. Electrical Wires. Electrical wires leading from the tower to electrical control facilities shall be located underground. d. Building Mounted. Attachments of the WECS to a building shall strictly comply with the City of Sparks' codes and regulations. e. Number Per Parcel. A maximum of one WECS per parcel is permitted on parcels less than one-half acre in size. Up to one WECS per one-half acre is permitted on parcels greater than one acre in size for renewable energy production—private. f. A WECS is allowed only on a parcel which has a primary structure. Otherwise, it will is considered a renewable energy production-utility. 3. Wind energy conversion systems (WECS), utility. The following are the standards for installation of utility WECS. a. A setback of 1.5 times the total height, including the uppermost extension of any blades, shall be maintained from the property line of any residential use properties. b. For utility WECS, at least 1.0 times the total height, including the uppermost extension of any blades, shall be maintained from the property line of any non-residential use properties. c. Guy wire anchors may not extend closer than ten feet from the property line. d. For utility WECS, the maximum height shall be established as a condition of a conditional use permit. D. Geothermal Resources. 1. Required permits. All geothermal development shall obtain all necessary permits from the Nevada Department of Minerals, the Nevada Division of Environmental Protection, the Nevada Division of Water Resources, the Washoe County District Health Department and if the geothermal development is located an any federal lands, the U.S. Bureau of Land Management, Bureau of Reclamation or U.S. Forest Service prior to the issuance of any building permits for the project. A city building permit is required. 2. Geothermal gradient and exploration/development test wells. The following provisions apply to the location and development of geothermal temperature gradient and exploration/development test wells. a. Fluid or Steam Production. No fluid or steam shall be used for energy production from the geothermal temperature gradient and exploration/development test well(s). b. Proximity to Water Wells. Geothermal temperature gradient and exploration/development test wells shall be situated with a minimum separation of 500 feet from any adjacent private domestic well(s) or state permitted municipal and industrial or quasi-municipal and industrial purpose well(s) unless a monitoring well is required by another permitting agency. c. Reclamation of Site. Upon abandonment, in accordance with the Nevada Department of Mineral requirements, the temperature gradient and exploration/development well pad site shall be revegetated and returned to approximately its original condition. d. Conditional Use Permit. All geothermal temperature gradient and exploration/development well projects within 500 feet of a residential district require a conditional use permit. 3. Geothermal direct use wells for private energy production. This Section applies to the location and development of geothermal direct use wells for domestic, residential, utility or industrial space heating and food dehydration application, and all related wellfield gathering systems. a. Proximity to Water Wells. Geothermal direct use wells shall be situated with a minimum separation of 500 feet from any adjacent private domestic well(s) or state permitted municipal and industrial or quasi-municipal and industrial purpose well(s) unless a monitoring well is required by another permitting agency. b. Reclamation of Site. Upon abandonment, in accordance with the Nevada Department of Mineral requirements, the geothermal direct use well site shall be revegetated and returned to approximately its original condition. c. Minimum standards. (1) Visual Appearance. Placement of facilities on peaks, ridgelines, bluffs and other prominent topographic features as viewed from the property line shall be minimized to reduce the impact on the visual character of the surrounding area. (2) Height. Maximum height for all facilities associated with the geothermal direct well shall comply with the height standards for the property's zoning district. (3) Landscaping and Screening. Landscaping and /or opaque screening with a minimum height of six feet shall be placed around the immediate perimeter of all geothermal direct use wells and all related heat transfer structures. (4) Noise. All geothermal direct use wells and all related heat transfer structures shall not emit noise levels in excess 60 dBA measured at the property line in residential use and 65dBA measured at the property line in non-residential use parcels. Acoustical shielding is required for all wellheads and equipment if needed to comply with this standard. (5) Air Quality. All geothermal direct use wells and all related heat transfer structures shall not violate federal, state and Washoe County District Health Department air quality standards. (6) Any geothermal system can only be located on a parcel which has a primary structure. Otherwise, it is considered a renewable energy production-utility. 4. Geothermal wellfield gathering systems and power generation facilities for utility energy production. The following provisions apply to geothermal wellfield gathering systems and related power generation facilities. This includes the use of fluid or steam for energy production from any geothermal well(s). a. Geothermal wellfield gathering systems and related power generation facilities shall be sited in areas designated as either industrial or rural reserve on the land use map and zoned either Industrial ("I") or Agricultural ("A-5" or "A-40"). If necessary, an amendment may be required and obtained prior to any permits for the geothermal wellfield gathering system being issued. b. Conditional Use Permit. All utility geothermal wellfield gathering systems and power generation facilities require a Conditional Use Permit. c. Proximity to Water Wells. Geothermal wellfield gathering systems and power generation facilities shall be situated with a minimum separation of 500 feet from any adjacent private domestic well(s) or state permitted municipal and industrial or quasi-municipal and industrial purpose well(s) unless a monitoring well is required by another permitting agency. d. Reclamation of Site. Upon abandonment, in accordance with the Nevada Department of Mineral requirements, the geothermal wellfield gathering systems and power generation facilities site shall be revegetated and returned to approximately its original condition. e. Visual Appearance. Placement of facilities on peaks, ridgelines, bluffs and other prominent topographic features as viewed from the property line shall be minimized to reduce the impact on the visual character of the surrounding area. f. Height. Maximum height for all facilities associated with the geothermal direct well shall comply with the height standards for the property's zoning district. g. Landscaping and Screening. Landscaping and /or opaque screening with a minimum height of six feet shall be placed around the immediate perimeter of all geothermal direct use wells and all related heat transfer structures. h. Noise. All geothermal direct use wells and all related heat transfer structures shall not emit noise levels in excess 55dBA measured at the property line in residential use parcels and 65dBA measured at the property line in non-residential use parcels. Acoustical shielding is required for all wellheads and equipment where needed to comply with this standard. E. Other Resources. All renewable energy production systems not identified in this section require a conditional use permit for utility and private production. For systems combining more than one of the identified renewable resources, the standards for each renewable energy production system standards apply.
(Ord. 2512, § 1(Exh. A), Add. 08/24/2015)
Ask a question about Sparks law
Corpus searches the Sparks sections it holds and shows the ones that match, with their citations. Free, no sign-in.