§ 103-38 — General method of demolition
Code of Ordinances of the City of Buffalo, New York (Code 2026-03-31: eCode360 publication current through the 2026-03-31 codification (imported 2026-11-12)) · Buffalo City Code § 103-38
Corpus is an independent public-information project, not the official City of Buffalo website. Stable reference: corpuslaw.us/code/5ce66cec-30e5-4318-b774-f999ddafbe22
§ 103-38: General method of demolition.
All demolition operations shall be conducted in accordance with all requirements of City of Buffalo Ordinance §§ 103-10, 103-13, 103-45, 103-46, 103-47, 103-48 and 144-11, Chapter 356, and New York State Code Rule 23. Any and all salvage work performed prior to demolition work will require a building permit. The City of Buffalo Department of Permit and Inspection Services shall license the contractor performing salvage work. Demolition work once commenced must be continuous until the demolition work and filling and final grading are completed by a licensed demo contractor. In the case of an emergency condition, the Commissioner of Permit and Inspection Services is authorized to permit emergency demolition work to be done pending the issuance of the demolition permit. Any deviation from this ordinance shall not be granted unless prior written approval is received from the Commissioner of Permit and Inspection Services. A. Preparations. Before starting demolition, the following must be completed: (1) An asbestos survey, asbestos abatement letter, and an inspection report supplied by a New York State licensed asbestos inspector, must be submitted as part of the application for a building demolition permit. An asbestos survey is needed for the demolition of any building built before January 1, 1974, excluding agricultural. A licensed asbestos handler contractor shall perform any and all asbestos abatement projects performed in the City of Buffalo. This contractor shall also be licensed by the City of Buffalo as a specialty contractor. (2) A building demolition permit must be applied for, approved and issued. (3) Prior to the issuance of the building demolition permit, all building must be baited for rodents. The demolition of the baited structure shall commence no later than ten days after the baiting is completed. The applicant is responsible to provide written proof of such rodent baiting being performed by a City of Buffalo licensed exterminator. (4) All gas, electric, water, steam and other supply lines shall be shut off and capped. In each case, the service company involved shall be notified in advance of any dismantling and or demolition activity. It is the responsibility of the owner/ contractor/ agent to notify UFPO (Underground Facilities Protective Organization). All sewer service connections shall be bulkheaded and closed to infiltration at the street line. The sewer and water service lateral to all buildings must be terminated to conform to this code section. Applications to continue sewer and water lateral service must be made to the City of Buffalo Water Authority, City of Buffalo Sewer Authority and the City of Buffalo Department of Public Works. (5) Where it is necessary to maintain any power, water, gas or electric lines during demolition, such lines shall be relocated or protected with substantial coverings in order to protect them from damage and to afford safety to the workmen. (6) Before any demolition or site work is done, and before any large machinery, including, but not limited to, backhoes, excavators, front-end loaders, tandem-axle dumps, tractor-trailers, dumpsters and their trucks, cranes, etc., is allowed on the site or on any City right-of-way adjacent to the site, a sidewalk survey inspection must be done and included as part of the demolition permit paperwork submission. The sidewalk survey shall include a drawing of the site and any adjacent City rights-of-way, and shall include the address, the date, the inspector, and a verbal description and photographs of the condition of all affected sidewalks, aprons, and other paved flatwork on the City right-of-way adjacent to the site or affected by the project. A follow-up inspection including new photos, drawings, and verbal description shall be done at the completion of all work, and shall be compared to the results from the initial sidewalk inspection to determine what damages, if any, have occurred. B. Procedure for sewer and water termination prior to demolition. (1) All sewer and water service termination shall be performed by a City of Buffalo licensed master plumber. (2) The master plumber shall report to the Water Authority to obtain the water plug. (3) The master plumber shall contact the Water Authority and Department of Permit and Inspection Services to arrange for the inspection of both water and sewer termination. (4) Where the termination of the sewer and water service involves a Y-type service or lateral servicing two structures, the master plumber shall contact the Plumbing Inspection Division of the Department of Permit and Inspection Services prior to the termination of service. C. Demolition work. All demolition work to be performed under this ordinance shall include the demolition and removal of all buildings and structures above and below grade level, above and below ground storage tanks, underground tunnels, floors and appurtenances thereto and foundations removed to virgin soil. No partial removal or partial demolition of any structure and its components may take place without the written approval of the Commissioner of Permit and Inspection Services. All demolition work shall including the following: (1) Removal of all old materials and rubbish of every description from the site of the demolition work including all basements and or cellars. (2) All foundations, concrete floors located in basements, sub basements, cellars, boiler rooms and crawl spaces, etc., shall be broken, removed, and disposed of in conformance with this ordinance. (3) In all cases where a retaining wall is demolished and or removed or where the pitch of the finished graded lot would likely cause erosion problems or where what is known as an embankment would have been formed, the contractor and the Commissioner of Permit and Inspection Services or his designee shall meet at the site and agree on type and method of installing fill materials, angle, pitch and relation of finished grade to sidewalk and walkway. (4) Any damages to existing sidewalks, curbs or streets caused in the performance of the work of this contract shall be replaced in kind and/or repaired in accordance with the City of Buffalo specifications on file with the office of the Commissioner of Public Works. All remedial work shall be done by the contractor at his own expense, bearing the cost of restoring affected streets and curbs to a good and satisfactory condition. (5) In the filling of excavations, voids, and/or depressions, filling materials must conform to the following standards: The filling material shall be 66% clay materials or higher. The filling materials shall have no particles greater than 216 cubic inches in dimension. Sod, roots, stumps, trees, brush, or asphalt materials shall not be used so as to not disturb the environmental balance of the present and surrounding soils. Documentation of sources and custody of filling materials shall be provided to the Commissioner of Permit and Inspection Services or his designee. (6) If the filling material is found to be contaminated or unsuitable as fill in any way, such filling material shall be removed from the site and replaced at the demolition contractor's expense. Upon completion of the removal of the contaminated filling material, dumping and custody documentation shall be delivered to the Commissioner of Permit and Inspection Services or his designee. (7) Upon completion of the demolition work the work area shall be graded and leveled, taking care to properly fill all depressions and voids. The final grade shall be of 12 inches of 100% soil content free of all aggregate materials as well as lacking sod, roots, stumps, trees, brush, stone and asphaltic material. Bituminous is not allowed to be used as filling materials. The final grade is to also provide for proper drainage and to be done as to not collect any standing water or cause neighboring or adjacent properties to become a receptacle for the aforementioned drainage. (8) Barricades, "orange" construction fences and all other protection shall be continued, properly supported and maintained by this contractor for the full period of the contract and shall be removed by the contractor upon completion of the work. D. Inspection. (1) The contractor is to notify the Commissioner of Permit and Inspection Services or his designee 24 hours prior to the start of demolition to provide for proper inspections. (2) The contractor shall be required to obtain an inspection from the Commissioner of Permit and Inspection Services or his designee after all excavation work is completed and prior to the placement of any filling materials. No backfilling of any excavation shall be performed prior to obtaining written approval from the Commissioner of Permit and Inspection Services or his designee. (3) To verify proper excavation, removal and filling techniques, the contractor shall have available an excavating machine capable of digging as many as three test pits to verify compliance with this code section. (4) During demolition, continuing inspections shall be made as the work progresses to detect any hazards to workmen resulting from weakened or deteriorated floors or walls or loosened material. No employee of the demolition contractor shall be suffered or permitted to work where such hazards exist unless they are corrected by shoring, bracing, or other effective means. E. Removal of debris. Material and debris resulting from demolition for which a permit has been granted shall be removed from the premises as follows: (1) For all structures of not more than 2 1/2 stories in height above grade: within five calendar days. (2) For all structures of more than 2 1/2 stories and less than five stories in height above grade: within 10 calendar days, and (3) For all structures in excess of five stories in height above grade: within 45 calendar days. (4) The time limitations set forth above shall commence upon the date of the granting of such permit, and the permit shall state the time limitation on the face thereof. Extension of time beyond the limitations set forth above may be granted whenever unusual problems of demolition exist, but only upon a written request to the Commissioner of Permit and Inspection Services setting forth in detail the reason or reasons why such extension is necessary. The decision made by the Commissioner to extend the time frame shall be done in writing. Structures having a ground area in excess of 5,000 square feet or structures of reinforced concrete and/or steel frame construction, or structures in excess of 10 stories in height, merit consideration for an extension of the time limitations as set forth above. (5) All construction and demolition debris shall be disposed of in conformance and compliance with all state, federal and local legislation governing the disposal of this debris. The staging and or storage of any construction and or demolition debris from any demolition and or cleanup job that does not have its origin at the respective job site is prohibited. (6) Wrecking operations shall be kept within the property lines. (7) Chutes for the removal of materials and debris shall be provided in all such parts of demolition operations as are deemed necessary by the Commissioner of Permit and Inspection Services, or his designee. F. Watering-down of airborne particles. (1) General requirements. The site of demolition activity shall be watered down whenever necessary to prevent the dispersion of airborne particles. (2) Debris shall be "watered down" during all demolition activity before and during handling to hold down dust. The contractor shall apply for a hydrant permit as issued by the Buffalo Water Authority. The hose, nozzle and backflow prevention device shall be supplied by the contractor and shall be a minimum of 2 1/2 inches in size. The back flow prevention device shall be supplied by the contractor and shall be a minimum of two inches in size. If directed by the Building Inspector of Demolition to water down a demolition site during times considered the winter season (November 15 to and through April 15), the contractor shall make arrangements with the Buffalo Water Authority to pump the fire hydrant of its water contents on a daily basis to prevent damage from freezing. G. Use of explosives during demolition. Final approval for a demolition permit using the detonation of explosives for demolition by implosion will not be granted until the following requirements are fulfilled to the satisfaction of the Commissioner of Permit and Inspection Services: (1) The contractor using the method of explosives for demolition shall be licensed by the Department of Permit and Inspection Services as a Type 4 demolition contractor. The implosion contractor shall have a current New York State Department of Labor certificate of competency issued by the New York State Department of Labor for demolition by implosion. (2) The Department of Public Works Division of Streets shall be supplied with a working plan for cleanup of public thoroughfares. The Department of Public Works shall be consulted and approve the installation and location of protective curtains and or vehicles (tractor-trailers) and placement of barriers to contain flying debris. This proposed plan must be approved by the Commissioner of Public Works before the permit is issued. (3) The Department of Permit and Inspection Services shall be provided with work plans for the weakening of the structure and placement of explosives. A New York State licensed structural engineer with an original seal and signature placed upon the document shall certify this plan. The structure being demolished shall have all windows and glass removed from the building prior to the implosion. The demolition contractor shall provide the Department of Permit and Inspection Services with an interior and exterior survey of surrounding properties to assess conditions prior to and after the completion of the implosion. The Demolition contractor shall provide for a procedure to address follow-up complaints, including a time frame for repairs and a summary of damage to surrounding buildings and utilities. The demolition contractor shall have qualified workman on duty for immediate repairs to windows that may be broken as a result of the demolition activity. This proposed plan must be approved by the Commissioner of Permit and Inspection Services before the permit is issued. (4) The Department of Parking Enforcement shall be provided with a plan that meets the criteria and approval of the Director of Parking Enforcement. This plan shall include and provide for the posting of signage for the limiting of parking of all unauthorized vehicles in the one-thousand-foot safety zone. The proposed parking plan must be approved by the Director of Parking Enforcement before the permit is issued. (5) The Department of Public Works shall be provided with a plan as to how the traffic flow and emergency equipment shall be deployed throughout the one-thousand-foot safety zone. This proposed plan must be approved by the Commissioner of Public Works before the permit is issued. (6) The Department of Fire, Division of Fire Prevention shall be provided with a plan showing the location of the command post and the transit and storage of explosives. This proposed plan must be approved by the Commissioner of Fire and/or the Battalion Chief of Fire Prevention before the permit is issued. (7) The demolition contractor shall notify all utility companies including but not limited to electric, natural gas, television cable, telephone, water, sewer, communications and fiber optic cable. The contractor shall notify all utilities in writing of the impending implosion at least 30 days in advance of the actual implosion. The contractor shall allow all utility companies time and access to the proposed demolition site for inspection and or protection of their supply lines. Upon completion of the utility inspections the contractor shall obtain written confirmation of all utility inspections and or reports assuring each utility supplier has addressed all precautionary measures. The demolition contractor shall provide copies of all written communications to the Commissioner of Permit and Inspection Services for his review and approval. (8) The contractor and the implosion contractor shall have an insurance policy delivered to the Department of Permit and Inspection Services, which must be approved by the City of Buffalo Corporation Counsel's office. The value of the insurance shall be in an amount satisfactory to the Commissioner of Permit and Inspection Services or his designee. This insurance policy shall have an endorsement naming the City of Buffalo as "certificate holder," and as "named as additional insured." H. contractor identification signage. Any and all demolition work being performed by a licensed demolition contractor shall have a sign installed at the work site, for the full duration of the work, meeting the following requirements: (1) The size of said sign shall not be less than two feet by three feet in area. (2) The sign shall be supported by two-inch by four-inch lumber sunken into the earth and two-inch by four-inch diagonal bracing attached to withstand normal wind loading of at least 50 miles per hour. Other materials which are deemed acceptable by the Commissioner or his designee may be also be used. (3) The sign shall be painted with a white background. Dark blue or black lettering shall be placed on the sign. The size of the letters and identification number shall be a minimum of three inches in height. Exterior grade oil-based paint or approved equal must be used in the painting of the signage. (4) The information on the sign shall list the name of the company performing the work, the address of the company, the phone number of the company, and the name and job title of the contact person representing the company.
[Amended 7-20-2004 , effective 8-2-2004 ]
Ask a question about Buffalo law
Corpus searches the Buffalo sections it holds and shows the ones that match, with their citations. Free, no sign-in.
