§ 326-29 — Stormwater retention
Code of Ordinances of the City of Buffalo, New York (Code 2026-03-31: eCode360 publication current through the 2026-03-31 codification (imported 2026-11-12)) · Buffalo City Code § 326-29
Corpus is an independent public-information project, not the official City of Buffalo website. Stable reference: corpuslaw.us/code/9f8adfc6-fce6-4a11-a490-1f52ab3dbd4b
§ 326-29: Stormwater retention.
A. All new parking lots or other new paved and drained areas where the collected stormwater load would surpass that of the sewer system into which it would discharge shall have a complete stormwater retention system designed by an architect or engineer and approved by the Chief Plumbing Inspector and the Sewer Authority, as part of their construction. B. In all cases where a change in the potential peak amount of stormwater collected from a paved and drained parking lot, other paved and drained area, or drained collection area would create a new stormwater load that would be larger than the load capacity of the storm drainage system through which, or the sewer system into which, it discharges, a complete stormwater retention system designed and drawn by an architect or engineer and approved by the Chief Plumbing Inspector and the Sewer Authority shall be installed.
Ask a question about Buffalo law
Corpus searches the Buffalo sections it holds and shows the ones that match, with their citations. Free, no sign-in.
