§ 102-5 — Construction inspections

Code of the City of Mount Vernon, New York · Mount Vernon City Code § 102-5

Corpus is an independent public-information project, not the official City of Mount Vernon website. Stable reference: corpuslaw.us/code/bbfe8c6a-6fe8-4df1-8945-959807f457c1

§ 102-5: Construction inspections.

A. Work to remain accessible and exposed. Work shall remain accessible and exposed until inspected and accepted by the Code Enforcement Officer, a Building Inspector, or a Fire Inspector, when applicable, authorized by the Code Enforcement Officer. The permit holder shall notify the Code Enforcement Officer when any element of work described in Subsection B of this section is ready for inspection. B. Elements of work to be inspected. The following aspects of the construction process shall be inspected, where applicable: (1) Worksite before the issuance of a building permit; (2) Footing and foundation; (3) Preparation for concrete slab; (4) Framing; (5) Structural, electrical, plumbing, mechanical, fire protection (sprinkler system, fire stops, fire alarm systems), and other similar service systems of the building; (6) Fire-resistant construction in conjunction with a Fire Inspector; (7) Fire-resistant penetrations in conjunction with a Fire Inspector; (8) Solid-fuel-burning heating appliances, chimneys, flues, or gas vents in conjunction with a Fire Inspector; (9) Inspections required to demonstrate Energy Code compliance, including but not limited to insulation, fenestration, air leakage, system controls, mechanical equipment size, and, where required, minimum fan efficiencies, programmable thermostats, energy recovery, whole-house ventilation, plumbing heat traps, and high-performance lighting and controls; (10) Installation, connection, and assembly of factory-manufactured buildings and manufactured homes; and (11) A final inspection will be conducted after all work authorized by the building permit has been completed. C. Inspection results. After inspection, the work or a portion thereof shall be noted as satisfactory as completed, or the permit holder shall be notified as to how the work fails to comply with the Uniform Code or Energy Code, including a citation to the specific code provision or provisions that have not been met. Work not in compliance with any applicable provision of the Uniform Code or Energy Code shall remain exposed until such work has been brought into compliance with all applicable provisions of the Uniform Code and the Energy Code, reinspected, and found satisfactory as completed. D. Fee. The fee specified in or determined by the provisions outlined in § 102-18 (Fees) of this article must be paid before or during each inspection performed under this section.

Ask a question about Mount Vernon law

Corpus searches the Mount Vernon sections it holds and shows the ones that match, with their citations. Free, no sign-in.