§ 227-26 — Sheathing and shoring
Code of the City of Mount Vernon, New York · Mount Vernon City Code § 227-26
Corpus is an independent public-information project, not the official City of Mount Vernon website. Stable reference: corpuslaw.us/code/34a88914-5b40-4abc-969f-4f8799cafd5c
§ 227-26: Sheathing and shoring.
A. When so directed by the Commissioner, tight sheathing at least two inches in thickness, securely fastened in place with whalers and braces throughout the duration of the work, shall be placed in all trenches; shall be driven to the same depth as the lowest part of the pipe, conduit or structure proposed to be installed; and shall be carried down in such a manner that the bottom of the sheathing shall at no time be more than one foot above the bottom of the excavation. B. Whenever conditions make it necessary, the Commissioner may require that the sheathing be driven ahead of the excavation as the latter proceeds. C. Unless otherwise authorized in writing by the Commissioner, sheathing and shoring shall be left in place with a cutoff line 18 inches below ground surface.
Ask a question about Mount Vernon law
Corpus searches the Mount Vernon sections it holds and shows the ones that match, with their citations. Free, no sign-in.