§ 128-5 — Final plat
Municipal Code, City of Rochester, New York (Rochester Municipal Code, City Charter, Zoning Ordinance and Code Tables current through legislation adopted October 20, 2026 (eCode360 publication RO0104, scraped 2026-11-18)) · Rochester Municipal Code Tables § 128-5
Corpus is an independent public-information project, not the official City of Rochester website. Stable reference: corpuslaw.us/code/8b91611c-4633-4505-8852-ac8b83eacda7
§ 128-5: Final plat.
A. Initiation. Within six months of the Director's action on the preliminary plat, the subdivider shall make application at the office of the Director for approval of the final plat. B. Application and requirements. (1) Such application shall be made at least 33 days prior to the next regularly scheduled meeting of the Commission at which action is desired and shall be accompanied by the following information and maps: (a) One original drawing in waterproof ink on tracing cloth or permanent tracing film and 12 reproductions of such drawing of the proposed subdivision which incorporates all of the information and conditions required by the Director's action on the preliminary plat. (b) Final design of any bridges, culverts or other such facility which may be required. (c) All other detail sheets, information and maps as required by the Director's action on the preliminary plat shall be shown and drawn to scale, with all the necessary dimensions shown, including the length of all lot and street lines, deflections, angles, radii length of curves, tangent distances and tangent bearings for streets and any necessary data for the location of any lot or street line in the field. All dimensions shall be shown in feet and decimals of feet. A blank oblong, three inches by five inches, shall be reserved for the use of the approving authority. (d) Detail sheets showing the exact location, construction and specifications of all required improvements, bearing certification by the Director of Water, the City Engineer and the Rochester Pure Waters District that all required improvements have been designed and planned in accordance with the engineering and improvement standards of the City of Rochester, § 128-7 of this chapter and the applicable codes of Monroe County. (e) A list of all improvements for which waivers are requested. (f) Letters of concurrence from the Director of Water, the City Engineer and the Rochester Pure Waters District that such requests for waivers of improvements are agreeable to all parties. (g) An offer to dedicate to the City all highways, streets and parks so indicated and described on the plats and accompanied by a letter of concurrence signed by the City Engineer. (h) If the subdivider is not making an offer for dedication to the public of the streets, highways and parks shown on the subdivision map, he or she shall mark a notation to that effect on the plat. (i) A performance bond or letter of credit shall be required for 100% of the estimated cost of the public improvement work to be done as determined by the City Engineer and shall be posted at the time of submission of the final plat. No reimbursement for any improvement shall be made by the City or any district, department or authority thereof. In addition, a separate guaranty bond for a two-year period or a two-year letter of credit in the amount of 25% of the estimated cost of the public improvement work, as determined by the City Engineer, shall be supplied at the time of acceptance of the improvements. Such performance and guaranty bonds shall conform to the requirements of § 33 of the General City Law of the State of New York. (j) Certification of approval by the Monroe County Department of Health shall also be submitted in the case of realty subdivisions as defined pursuant to Article III of the Monroe County Sanitary Code. (k) Proof of continued maintenance of common facilities by deed restriction or otherwise for furnishing of City services for those subdivisions where public dedication of access is not to be furnished. (l) A scheme for street naming and house numbering shall be drawn by the subdivider. Street names are approved by the City Council and house numbers are approved by the City Engineer.[1] (m) The locations and coordinates of all monuments shall be referenced to the nearest approved control point as directed by the City Engineer where and if such control points are in existence. In the absence of such a control point, the subdivider shall establish monuments for the subdivision to the satisfaction of the City Engineer. (n) The plat and each of the accompanying detail sheets, plans and maps shall bear the name, stamp and professional status of the preparer. (2) The Director may waive the submittal of any additional information and maps required by this Subsection B if he or she finds it not necessary. C. Hearing. Unless the subdivision is exempt pursuant to § 128-5H, a public hearing shall be held by the Commission on the proposed subdivision, which shall have been advertised by publication in an official paper or a newspaper of general circulation within the City at least 20 days prior to such hearing and by mail to all property owners within 200 feet of such subdivision at least 20 days prior to such hearing. D. Actions. (1) By City Engineer and Corporation Counsel. (a) Prior to hearing. Any deed restriction or other arrangement which describes the procedures for continued maintenance of common facilities shall be reviewed by the Corporation Counsel for conformity to law and by the City Engineer for feasibility. (2) By Commission. (a) The Commission shall present at the public hearing the character and extent of the required public improvements for which waivers have been requested and concurred with by the City Engineer and by the Rochester Pure Waters District. (b) Following final review and the public hearing concerning the proposed subdivision, the Commission shall, by at least five affirmative votes of its membership, approve, modify and approve or disapprove the final plat. (c) The Commission shall state, in writing, to the subdivider the terms of conditional approval or the reasons for disapproval. (3) By Director. (a) If, within 45 days of the completed application for approval of the final plat and submission of final drawings, the Commission has not approved, conditionally approved or disapproved the final plat, such final plat shall be deemed approved and a certificate shall be issued by the Director so stating. Approval shall be noted on the plat by signature of the Director. (b) If an exemption is permitted pursuant to § 128-5H such that no hearing is required and no action by the Commission is required, the Director shall determine whether or not the final plat conforms to the requirements of this chapter and of the Zoning Code.[2] [1] If the Director finds that the requirements of § 128-5H have been met, the Director shall issue an exemption from the hearing and action provisions of § 128-5C and D(1) and (2) [2] Following the issuance of the exemption, the Director or his or her appointed representative shall give notice of the pending application. The notice shall inform interested parties that they may submit written statements relevant to the application and shall set a final date on which statements may be submitted. The notice shall be given by mail to the applicant; to the owner if different from the applicant; to any person deemed by the Director to have a direct interest in the application; and to owners of lots that abut the subdivision or that lie directly across a street which abuts the subdivision. [3] The Director shall then approve, modify and approve or disapprove the final plat. The failure of the Director to act within 45 days of the completed application for approval of the final plat or such longer period of time as may be agreed to by the applicant shall be deemed approval of the final plat. [4] The Director shall state, in writing, to the subdivider the terms of conditional approval or the reasons for disapproval. [5] Action by Planning Commission. If the Director shall decline to approve the application or approve it subject to modification which is not acceptable to the applicant or if any person is aggrieved by the action of the Director, such action shall not be deemed final administrative action but shall only be authorization for the applicant or the person aggrieved to refer the application to the Planning Commission for review and decision. Such referral shall be made by filing a written request with the Director within 30 days of the action, specifying the grounds therefor. The Director shall promptly refer such request to the Planning Commission, which shall review and act upon the application within 33 days of receipt. The decision of the Planning Commission shall be final. (4) By City Engineer. (a) Prior to construction of surface drainage facilities. The construction plans for surface drainage requirements shall be approved by the City Engineer prior to construction of any drainage facilities within the subdivision. The plans shall bear the certification of a professional engineer as evidence of responsibility for the surface drainage planning within the development. All surface drainage construction shall be subject to adequate inspection. (5) By City Engineer, Director of Water and Fire Marshal. (a) Following filing. As soon as the required public improvements are completed, the City Engineer, the Director of Water and the Fire Marshal shall inspect them and certify that they comply with the City's specifications and standards. (6) By Rochester Pure Waters District. (a) Following filing. As soon as the required sewer improvements are completed, the Rochester Pure Waters District shall inspect them and certify that they comply with the applicable codes of Monroe County. (7) By City Engineer. (a) Following inspection. As soon as the required public improvements are completed, the City Engineer shall communicate to the City Council a recommendation to accept the offer to dedicate the streets and highways shown on the subdivision map. (8) By City Council. Following receipt of the City Engineer's recommendation for acceptance of streets and highways, the offer of dedication shall be presented to the City Council for acceptance or rejection. E. Filing. (1) The Commission shall retain one reproduction of the final plat as approved and transmit two reproductions to the Manager of Maps and Surveys, upon which shall appear the terms of any conditional approval and signature of the Director. The original drawings shall be returned to the subdivider for filing in the Office of the Monroe County Clerk. (2) Within 90 days of the approval or conditional approval of the final plat or within 90 days of the issuance of a certificate granting approval of the final plat due to the failure of the Commission to act as required in accordance with § 128-5D of this article, the subdivider shall file the original drawing of the final plat as approved with the Office of the Monroe County Clerk or such approval or certificate granting approval shall expire and be void. F. Limitations on approval. (1) No changes, erasures, modifications or revisions shall be made in any final plat after approval has been granted by the Commission or after issuance of a certificate granting such approval or by the Director pursuant to § 128-5D(3)(b). In such cases the plat shall be void and shall be stricken from the records of the City of Rochester and the County of Monroe. (2) The approval of plans of proposed surface drainage and flood hazard prevention requirements shall not constitute the representation, guaranty or warranty of any kind or nature by the City of Rochester as to the safety, operation, adequacy or intent of the proposed facilities and shall create no liability upon or course of action against such public body or employee thereof for any damage that may result from construction pursuant thereto. G. Effects of approval and filing. (1) Upon approval, the three reproductions of the original drawing become part of the records of the City of Rochester. (2) Upon filing, the streets and highways shown on the final plat of the subdivision shall be deemed private until such time as required improvements have been inspected, approved and certified as complying with City standards and specifications by the City Engineer and have been formally accepted by ordinance of the City Council. The responsibility for maintenance, improvement and operation of required public improvements shall not rest with the City until such acceptance. The subdivider shall be responsible and liable for the provision and the cost of streetlighting prior to acceptance. (3) The streets, highways and parks shown on the final plat of the subdivision may become part of the Official Street Map of the City of Rochester pursuant to the procedures in § 115-23 of the Zoning Code.[3] H. Exemption. A subdivision shall be exempt from the hearing and action provisions of § 128-5C and D(1) and (2) of this chapter, provided that: (1) Fewer than five lots are created; (2) No new private or public street or public right-of-way is proposed; and (3) All proposed lots will have frontage and driveways on an existing, improved public street.
[Amended 2-14-2006 by Ord. No. 2006-22 ]
Ask a question about Rochester law
Corpus searches the Rochester sections it holds and shows the ones that match, with their citations. Free, no sign-in.
