§ 39-221 — Fees for permits

Municipal Code, City of Rochester, New York (Rochester Municipal Code, City Charter, Zoning Ordinance and Code Tables current through legislation adopted October 20, 2026 (eCode360 publication RO0104, scraped 2026-11-18)) · Rochester Municipal Code § 39-221

Corpus is an independent public-information project, not the official City of Rochester website. Stable reference: corpuslaw.us/code/3ac8669a-684e-4113-ae9b-90780a674757

§ 39-221: Fees for permits.

A. The fee for a permit to construct, enlarge, alter, improve, relocate, convert, maintain use, establish use, legalize use or change the occupancy of a building or structure, or for the installation or replacement of a heating appliance or system, shall be based on the actual cost of such work, per the following schedule: Actual Cost | Base Fee | Plus Incremental Fee $0 to $2,000 | $75 | None $2,001 to $4,000 | $110 | None $4,001 to $6,000 | $145 | None $6,001 to $8,000 | $175 | None $8,001 to $10,000 | $205 | None $10,001 to $12,000 | $235 | None $12,001 to $14,000 | $270 | None $14,001 to $16,000 | $300 | None $16,001 to $18,000 | $330 | None $18,001 to $20,000 | $360 | None $20,001 to $22,000 | $395 | None $22,001 to $24,000 | $425 | None $24,001 to $26,000 | $455 | None $26,001 to $28,000 | $485 | None $28,001 to $30,000 | $520 | None $30,001 to $32,000 | $550 | None $32,001 to $34,000 | $580 | None $34,001 to $36,000 | $610 | None $36,001 to $38,000 | $645 | None $38,001 to $40,000 | $675 | None $40,001 to $42,000 | $705 | None $42,001 to $44,000 | $735 | None $44,001 to $46,000 | $770 | None $46,001 to $48,000 | $800 | None $48,001 to $50,000 | $830 | None $50,001 to $52,000 | $860 | None $52,001 to $54,000 | $895 | None $54,001 to $56,000 | $925 | None $56,001 to $58,000 | $955 | None $58,001 to $60,000 | $985 | None $60,001 to $100,000 | $235 | .014 x Actual Cost $100,001 to $500,000 | $590 | .011 x Actual Cost $500,001 to $1,000,000 | $2,305 | .008 x Actual Cost $1,000,001 and Over | $6,500 | .008 x Actual Cost B. Actual cost shall be based on a signed contractual agreement or detailed cost estimate provided by the applicant. Actual cost shall include expenditures for all labor, materials, construction, equipment, rental and equipment installations. Mechanical work, in addition to general contractual work, is specifically included. In the event that no contractual agreement or detailed cost estimate is available, or there is a discrepancy with the cost estimate provided, the current "RS Means Square Foot" costs shall be used to determine the actual cost. C. Actual cost need not include: (1) Cost of labor and material of electrical wiring fixtures and equipment where an electrical permit is obtained pursuant to § 39-304 of the Municipal Code. (2) Cost of material and labor of plumbing work when a plumbing permit is obtained pursuant to Chapter 40, Building Construction: Plumbing, of the Municipal Code and the plumbing provisions of the New York State Uniform Fire Prevention and Building Code. (3) The cost of land, surveying, site preparation, soil investigation, private sidewalks, professional fees and other work intended primarily for appearance or embellishment. (4) Costs of materials, equipment and systems related to production, manufacturing or processing or which are requirements of owners, specialized codes or specialized regulations. D. If separate permits are obtained for building appurtenances such as signs, elevators and tanks, the cost of such items may be subtracted from the permit fee calculation and a separate fee paid for these items. E. There shall be no fee for a building permit to legalize an existing occupancy or to change occupancy where other work is not involved. F. Building permit fees for the following actions shall be as follows: Purpose | Fee Demolition1 of: Any structure, the demolition of which would be a Type II action as identified in § 48-5B of Chapter 48, Environmental Review, of the Municipal Code or in 6 NYCRR 617.13, State Environmental Quality Review | $100 Frame building up to 3 stories in height | $300 Any other structure | $470, plus $215 for each full 5,000 square feet of building floor area Installation of exterior paved area or parking lot | $160 Installation, alteration, repair or removal of a flammable liquid storage facility Per tank | $160 Per pump | $125 Installation of other structures such as tents, amusement devices, temporary classrooms or construction trailers where it is impractical to base a fee on cost | $125 Deck < = 144 square feet | $75 > = 144 square feet | $160 > = 400 square feet | $235 Wood-burning stove, solid fuel device, fireplace insert, gas fireplace | $160 Swimming pool | $85 Electrical inspections Residential New dwelling unit with service | $275 + $120 per each additional unit Renovation/addition Less than or equal to 200 square feet | $160 Greater than 200 and up to 1,000 square feet | $200 Greater than 1,000 square feet | $235 Commercial new construction or alteration/renovation Less than or equal to 1,500 square feet | $235 1,501 to 5,000 square feet | $430 Greater than 5,000 square feet | $430 + $0.08 per square foot (All above-listed fees do not include service installation.) Alarm system | $100 A/C or heat pump | $100 Elevator/escalator | $100 Fuel dispensing unit | $100 New service installation or upgrade less than or equal to 200 amps each | $160 + $55 per each additional meter New service installation or upgrade greater than 200 amps each | $220 + $55 per each additional meter Other | $100 Pool/hot tub wiring | $100 Reinspection fee | $100 Safety inspection (2 meters or fewer) | $100 Safety inspection (more than 2 meters) | $110 + $20 per meter over 2 Signs | $75 Temporary service installation | $100 Exterior lighting | $100 Pole lights | $110 + $20 per pole Plumbing inspections:2,3 Base fee for all plumbing permits | $100 In addition to the base fee, plumbing permit fees shall be as follows: Fixtures: installation, removal or capping Residential (3 units or less), each | $20 Commercial (4+ units or non-residential), each | $25 Backflow prevention devices (installation): Less than 2 inches, each | $25 More than 2 inches, each | $50 Water service renewal: Renewal of water service, less than 2 inches, without any street, each | $135 Water main services in property line of 3/4 inch to 2 inches, each | $55 Water repair or replacement to the outside of gas, domestic water, storm, sanitary, or vent piping, over 2 inches | $55 for first 60 feet; $20 per additional 100 feet All notice and order plumbing violations, each | $20 Repair or replacement to the supply of gas, domestic water, storm, sanitary or vent piping | $20 for first 100 feet, and $4 per foot thereafter Reinspection or callback when work is not ready for inspection, each | $100 NOTES: 1For demolition work done after 5:00 p.m. on weekdays or at any time on weekends, an additional fee equal to the demolition fee shall be charged. 2 For items not listed in the Fee Schedule, the permit fee shall be established by the Commissioner of Neighborhood and Business Development. 3 For any inspections requested on Saturdays, Sundays, holidays or other than regular working hours, the rate shall be $100 per hour. A minimum of four hours may be charged if the inspector was called in and/or has no other inspections during the four hours. G. Upon completion of a plan review, if the contract documents are determined to be insufficient and require revision and resubmission or if the applicant resubmits drawings due to significant changes in the proposed work, an additional fee of $50 or 50% of the full permit fee, whichever is greater, shall be required.

[Last amended 6-16-2026 by Ord. No. 2026-191 ]

Ask a question about Rochester law

Corpus searches the Rochester sections it holds and shows the ones that match, with their citations. Free, no sign-in.