§ 4A-11: Construction and installation of system.
A. Any franchisee is hereby granted the right and privilege and an easement to construct, erect, place, operate, repair and maintain poles, wires, transmission lines, distribution lines, service lines and cable television and communications equipment in and on, under and over all public streets, lands and places in the City for the purpose of furnishing the City and its inhabitants with cable services, subject to the approval of the City Engineer and the requirements of Chapter 104 of the Municipal Code and the rules and regulations for work in the right-of-way ("rules and regulations") adopted thereunder. B. A franchisee shall not erect any poles on the streets of the City without the prior approval of the City Engineer as to specific locations. Whenever the telephone or other utility companies have erected poles, a franchisee shall be expected to enter into a joint use agreement for those poles. A franchisee shall not apply to the City Engineer to erect its own poles unless a franchisee has been unable in good faith to enter into such joint use agreement, and any new poles shall be subject to approval as set forth in the rules and regulations. C. In those areas of the City where no poles exist and where a franchisee has not secured the City Engineer's approval to install its own poles, which approval shall not be withheld unreasonably, all wiring of the system shall be constructed underground. D. Prior to the commencement of any construction, including reconstruction, rebuild or upgrade, of any part of the system, a franchisee shall submit to the City Engineer a construction plan showing the location and design of all proposed construction and a schedule therefor. E. The proposed construction schedule shall be subject to the approval of the City Engineer; provided, however, that construction shall take no longer than four years to complete. All construction, including reconstruction, rebuild and upgrade, required pursuant to a franchise agreement shall commence no later than six months after the award or renewal of the franchise or the order of the City, whichever is applicable, and shall proceed according to the approved schedule. F. A franchisee shall apply for all required permits and shall not undertake any construction without receipt of such permits, which shall not be delayed or withheld unreasonably. G. The construction, installation and maintenance of a cable system shall meet or exceed any and all technical performance standards of the FCC, the National Electrical Code, the National Electrical Safety Code, and any other applicable federal laws and regulations and the laws, ordinances and construction standards of the NYPSC and the generally applicable laws, ordinances and construction standards of the City, as amended from time to time. H. The City shall have the right to specify the methods and materials to be used by a franchisee in any construction affecting the surface or bed of any public street or any public lands or places, and to specify the location of any equipment or facilities proposed by a franchisee to be placed within or upon any public street or any public lands or places. The City shall have the right reasonably to condition and limit the construction work of a franchisee to assure a minimum of inconvenience to the traveling public. I. All of a franchisee's construction shall be conducted in such a manner as to cause minimum interference with the rights and reasonable convenience of the public and any property owners that may be affected by the construction. J. A franchisee shall promptly repair and restore to its previous condition any private or public property which may have been damaged as a result of the construction or maintenance of the system within 10 business days of the occurrence of the damage, weather permitting. All repairs and restorations shall comply with the rules and regulations, so long as the rules and regulations are applied to franchisee in a nondiscriminatory manner. Upon failure of a franchisee to timely comply with the requirements of the rules and regulations and the City having notified franchisee in writing of the repairs and restoration required, the City may cause proper repairs and restoration to be made, and the costs of such work shall be paid by the franchisee upon demand by the City, by direct payment or, in the City's sole discretion, a claim against the surety bond. The franchisee shall be treated the same as other similarly situated entities. K. Cable service shall be extended at regular installation and monthly service rates to all residential areas where there is a density of 20 residences per linear strand mile for aerial cable as measured from a franchisee's closest technologically feasible tie-in point that is actively delivering cable service as of the date of a request for service. A franchisee shall extend cable service to areas where there is a lesser density upon payment by requesting households in such areas of a higher installation rate not to exceed the franchisee's actual and direct costs divided equally among the number of requesting households. L. For subscribers requesting connection requiring an aerial drop line within 150 feet aerial distance from a franchisee's point of connection to its distribution line, a franchisee shall extend cable service at the regular installation rate. For aerial connections in excess of 150 linear feet and any underground installations, subscribers shall pay at a rate not to exceed the franchisee's actual costs of installation. M. The system shall be constructed so as to provide an emergency alert system as required by the FCC. N. The City Engineer shall have the right to inspect all construction and all installation work within any public street or on any public lands or places that is performed by a franchisee or under contracts with a franchisee. O. A franchisee shall submit to the City Engineer detailed as-built drawings reflecting the location of all construction, including reconstruction, rebuild or upgrade, as required by the City rules and regulations. P. A franchisee shall have the right to remove, trim, cut and to keep clear of its poles, cables, underground conduits and related equipment the trees in and along the public streets; however, a franchisee shall not cut or damage said trees to any greater extent than is reasonably necessary for the construction, erection, installation, maintenance and use of cable television system equipment. Any such tree trimming and any cutting down and removal of trees shall only be performed in accordance with § 89-9 of the Municipal Code and the rules and regulations. Q. A franchisee shall promptly upon discovery or notification cover or remove any graffiti on its equipment and facilities. R. A franchisee shall be required, at its expense, to protect, support, temporarily disconnect, relocate in or remove from public streets, lands or places any property of the franchisee whenever required by the Mayor upon reasonable notice by reason of traffic conditions, public safety, street construction or any other public purpose. In addition, a franchisee may be required, at its expense, to move any part or all of its equipment and facilities from any public streets, lands or places upon the termination or revocation of the franchise, as may be directed by the Mayor upon reasonable notice, provided that such direction is in accordance with federal and state law, where applicable. S. The franchisee, on the request of any person, firm or corporation holding a building moving permit issued by the City, shall temporarily raise or lower its wires to permit the moving of buildings. The direct and actual expense of such temporary removal, raising or lowering of wires shall be paid to the franchisee by the person, firm or corporation requesting the same, and the franchisee shall have the authority to require such payment in advance. The franchisee shall be given not less than 48 hours' advance notice to arrange for such temporary wire changes.
Ask a question about Rochester law
Corpus searches the Rochester sections it holds and shows the ones that match, with their citations. Free, no sign-in.