For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9-126 — Inspections and orders

Code of Ordinances of the City of Syracuse, New York (Supp. No. 41: codified through September 30, 2024) · Syracuse Code of Ordinances § 9-126

Corpus is an independent public-information project, not the official City of Syracuse website. Stable reference: corpuslaw.us/code/864d32a0-ab50-44be-bec8-dad460f627fa

Sec. 9-126. - Inspections and orders.

(1) Inspections required. (a) Work shall not be performed on any portion of a building, structure, or utility beyond the point indicated in each successive inspection without first obtaining the approval of the division. Such approval shall be given only after an inspection shall have been made of each successive step required by this article. (b) Mechanical permit inspection record cards shall be prominently displayed in a conspicuous location upon the premises at all times during the progress of said work so as to be readily seen. (c) The mechanical permit inspection record card shall include the information requested by the division and shall be maintained in such location until the work has been completed and final inspections made. Upon completion of the work and after all necessary inspections have been made and properly signed by personnel of the division, such record card shall be returned to the division by the inspector or the construction permit holder. (2) When required. It shall be required that at least the following inspections be made of heating system, ventilation system, air conditioning system, refrigeration system, fire suppression system and/or flammable and combustible liquid piping and tank system work, and each phase shall be approved before a contractor moves onto the next phase. (At least twenty-four (24) hour notification shall be given to the division before a required inspection.) (a) Initial. Approval required prior to the covering of any wall, floor, ceiling or underground facility where heating system, ventilation system, air conditioning system, refrigeration system, fire suppression system and/or flammable and combustible liquid piping and tank system work has been performed. (b) Intermediate inspection. Approval required when the furnace, boiler, compressor, chill air handler or other major equipment has been installed and connected to its energy source. (c) Final. When the installation is completed and the system is operational, approval is necessary prior to the issuance of a certificate of occupancy or certificate of completion. (d) Additional inspections. Additional inspections may be required by the director for the purpose of ascertaining progress. (3) Failure to have work inspected. Whenever any work is covered or concealed by additional work without first having been inspected as required, the division may order, by written notice, that such work be exposed for examination. The work of exposing and recovering shall not entail expense to the city. (4) Certification of work completed. Upon completion of the installation the license holder will submit to the division certification that the work was done properly and in conformance with all applicable codes, rules and regulations. Such certification shall be submitted on forms provided by the division.

(Gen. Ord. No. 39-2005, 8-1-05)

Ask a question about Syracuse law

Corpus searches the Syracuse sections it holds and shows the ones that match, with their citations. Free, no sign-in.