For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 3-6-13 — Title

Municipal Code of the City of White Plains, New York (Codified through Ordinance of October 5, 2026. (Supp. No. 79, Update 2)) · White Plains City Code § 3-6-13

Corpus is an independent public-information project, not the official City of White Plains website. Stable reference: corpuslaw.us/code/66213a13-61bc-4131-a6a4-6e6626a41ef3

Sec. 3-6-13. - Title.

If the provisions of any section, subsection, paragraph, subdivision or clause of this chapter shall be judged invalid by a court of competent jurisdiction, such order or judgment shall not affect or invalidate the remainder of any chapter, section, subsection, paragraph, subdivision or clause of this chapter. Schedule A Storm Water Management Practices Acceptable for Water Quality (From: New York State Storm Water Management Design Manual, Table 5.1) Group | Practice | Description Pond | Micropool Extended Detention Pond (P-1) | Pond that treats the majority of the water quality volume through extended detention, and incorporates a micropool at the outlet of the pond to prevent sediment resuspension. Wet Pond (P-2) | Pond that provides storage for the entire water quality volume in the permanent pool. Wet Extended Detention Pond (P-3) | Pond that treats a portion of the water quality volume by detaining storm flows above a permanent pool for a specified minimum detention time. Multiple Pond System (P-4) | A group of ponds that collectively treat the water quality volume. Pocket Pond (P-5) | A storm water wetland design adapted for the treatment of runoff from small drainage areas that has little or no baseflow available to maintain water elevations and relies on groundwater to maintain a permanent pool. Wetland | Shallow Wetland (W-1) | A wetland that provides water quality treatment entirely in a shallow marsh. Extended Detention Wetland (W-2) | A wetland system that provides some fraction of the water quality volume by detaining storm flows above the marsh surface. Pond/Wetland System (W-3) | A wetland system that provides a portion of the water quality volume in the permanent pool of a wet pond that precedes the marsh for a specified minimum detention time. Pocket Wetland (W-4) | A shallow wetland design adapted for the treatment of runoff from small drainage areas that has variable water levels and relies on groundwater for its permanent pool. Infiltration | Infiltration Trench (I-1) | An infiltration practice that stores the water quality volume in the void spaces of a gravel trench before it is infiltrated into the ground. Infiltration Basin (I-2) | An infiltration practice that stores the water quality volume in a shallow depression before it is infiltrated into the ground. Dry Well (I-3) | An infiltration practice similar in design to the infiltration trench, and best suited for treatment of rooftop runoff. Filtering Practices | Surface Sand Filter (F-1) | A filtering practice that treats storm water by settling out larger particles in a sediment chamber, and then filtering storm water through a sand matrix. Underground Sand Filter (F-2) | A filtering practice that treats storm water as it flows through underground settling and filtering chambers. Perimeter Sand Filter (F-3) | A filter that incorporates a sediment chamber and filter bed as parallel vaults adjacent to a parking lot. Organic Filter (F-4) | A filtering practice that uses an organic medium such as compost in the filter in place of sand. Bioretention (F-5) | A shallow depression that treats storm water as it flows through a soil matrix, and is returned to the storm drain system. Open Channels | Dry Swale (O-1) | An open drainage channel or depression explicitly designed to detain and promote the filtration of storm water runoff into the soil media. Wet Swale (O-2) | An open drainage channel or depression designed to retain water or intercept groundwater for water quality treatment. Schedule B SAMPLE STORM WATER CONTROL FACILITY MAINTENANCE AGREEMENT WHEREAS, the City of White Plains ("City") and the ___________ ("facility owner") want to enter into an agreement to provide for the long term maintenance and continuation of storm water control measures approved by the City for the below named project, and WHEREAS, the City and the facility owner desire that the storm water control measures be built in accordance with the approved project plans and thereafter be maintained, cleaned, repaired, replaced and continued in perpetuity in order to ensure optimum performance of the components. Therefore, the City and the facility owner agree as follows: 1. This agreement binds the City and the facility owner, its successors and assigns, to the maintenance provisions depicted in the approved project plans which are attached as Schedule A of this agreement. 2. The facility owner shall maintain, clean, repair, replace and continue the storm water control measures depicted in Schedule A as necessary to ensure optimum performance of the measures to design specifications. The storm water control measures shall include, but shall not be limited to, the following: drainage ditches, swales, dry wells, infiltrators, drop inlets, pipes, culverts, soil absorption devices and retention ponds. 3. The facility owner shall be responsible for all expenses related to the maintenance of the storm water control measures and shall establish a means for the collection and distribution of expenses among parties for any commonly owned facilities. 4. The facility owner shall provide for the periodic inspection of the storm water control measures, not less than once in every five year period, to determine the condition and integrity of the measures. Such inspection shall be performed by a Professional Engineer licensed by the State of New York. The inspecting engineer shall prepare and submit to the City within 30 days of the inspection, a written report of the findings including recommendations for those actions necessary for the continuation of the storm water control measures. 5. The facility owner shall not authorize, undertake or permit alteration, abandonment, modification or discontinuation of the storm water control measures except in accordance with written approval of the City. 6. The facility owner shall undertake necessary repairs and replacement of the storm water control measures at the direction of the City or in accordance with the recommendations of the inspecting engineer. 7. The facility owner shall provide to the City within 30 days of the date of this agreement, a security for the maintenance and continuation of the storm water control measures in the form of (a Bond, letter of credit or escrow account). 8. This agreement shall be recorded in the Office of the County Clerk, County of Westchester together with the deed for the common property and shall be included in the offering plan and/or prospectus approved pursuant to ___________. 9. If ever the City determines that the facility owner has failed to construct or maintain the storm water control measures in accordance with the project plan or has failed to undertake corrective action specified by the City or by the inspecting engineer, the City is authorized to undertake such steps as reasonably necessary for the preservation, continuation or maintenance of the storm water control measures and to affix the expenses thereof as a lien against the property. 10. This agreement is effective ___________.

(Ord. of 12-20-07, § 1)

Ask a question about White Plains law

Corpus searches the White Plains sections it holds and shows the ones that match, with their citations. Free, no sign-in.