§ 3-6-6.2 — Contents of storm water pollution prevention plans
Municipal Code of the City of White Plains, New York (Codified through Ordinance of October 5, 2026. (Supp. No. 79, Update 2)) · White Plains City Code § 3-6-6.2
Corpus is an independent public-information project, not the official City of White Plains website. Stable reference: corpuslaw.us/code/3ccf0e37-e890-4f28-89f6-5c7ee4d02db1
Sec. 3-6-6.2. - Contents of storm water pollution prevention plans.
(1) All SWPPPs shall provide the following background information and erosion and sediment controls: a. Background information about the scope of the project, including location, type and size of project; b. Site map/construction drawing(s) for the project, including a general location map. At a minimum, the site map should show the total site area; all improvements; areas of disturbance; areas that will not be disturbed; existing vegetation; on-site and adjacent off-site surface water(s); wetlands and drainage patterns that could be affected by the construction activity; existing and final slopes; locations of off-site material, waste, borrow or equipment storage areas; and location(s) of the storm water discharges(s). The site map should be at a scale no smaller than one (1) inch = one hundred (100) feet; c. Description of the soil(s) present at the site; d. Construction phasing plan describing the intended sequence of construction activities, including clearing and grubbing, excavation and grading, utility and infrastructure installation and any other activity at the site that results in soil disturbance. Consistent with the New York Standards and Specifications for Erosion and Sediment Control (Erosion Control Manual), not more than five (5) acres shall be disturbed at any one (1) time unless pursuant to an approved SWPPP; e. Description of the pollution prevention measures that will be used to control litter, construction chemicals and construction debris from becoming a pollutant source in storm water runoff; f. Description of construction and waste materials expected to be stored on-site with updates as appropriate, and a description of controls to reduce pollutants from these materials including storage practices to minimize exposure of the materials to storm water, and spill-prevention and response; g. Temporary and permanent structural and vegetative measures to be used for soil stabilization, runoff control and sediment control for each stage of the project from initial land clearing and grubbing to project close-out; h. A site map/construction drawing(s) specifying the location(s), size(s) and length(s) of each erosion and sediment control practice; i. Dimensions, material specifications and installation details for all erosion and sediment control practices, including the siting and sizing of any temporary sediment basins; j. Temporary practices that will be converted to permanent control measures; k. Implementation schedule for staging temporary erosion and sediment control practices, including the timing of initial placement and duration that each practice should remain in place; l. Maintenance schedule to ensure continuous and effective operation of the erosion and sediment control practice; m. Name(s) of the receiving water(s); n. Delineation of SWPPP implementation responsibilities for each part of the site; o. Description of structural practices designed to divert flows from exposed soils, store flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site to the degree attainable; and p. Any existing data that describes the storm water runoff at the site. (2) Land development or redevelopment activities as defined in section 3-6-5 and meeting condition "A", "B" or "C" below shall also include water quantity and water quality controls (post-construction storm water runoff controls) as set forth in section 3-6-6.2(3) below as applicable: Condition A - Storm water runoff from land development or redevelopment activities discharging a pollutant of concern to either an impaired water identified on the Department's 303(d) list of impaired waters or a Total Maximum Daily Load (TMDL) designated watershed for which pollutants in storm water have been identified as a source of the impairment. Condition B - Storm water runoff from land development or redevelopment activities disturbing five (5) or more acres. Condition C - Storm water runoff from land development or redevelopment activity disturbing between one (1) and five (5) acres of land during the course of the project, exclusive of the construction of single family residences and construction activities at agricultural properties. (3) SWPPP Requirements for condition A, B and C; a. All information in section 3-6-6.2(1) of this chapter; b. Description of each post-construction storm water management practice; c. Site map/construction drawing(s) showing the specific location(s) and size(s) of each post-construction storm water management practice; d. Hydrologic and hydraulic analysis for all structural components of the storm water management system for the applicable design storms; e. Comparison of post-development storm water runoff conditions with pre-development conditions; f. Dimensions, material specifications and installation details for each post-construction storm water management practice; g. Maintenance schedule to ensure continuous and effective operation of each post-construction storm water management practice; h. Maintenance easements to ensure access to all storm water management practices at the site for the purpose of inspection and repair. Easements shall be recorded on the plan and shall remain in effect with transfer of title to the property; i. Inspection and maintenance agreement binding on all subsequent landowners served by the on-site storm water management measures in accordance with section 3-6-8 of this chapter; and j. For condition A, the SWPPP shall be prepared by a landscape architect, certified professional or professional engineer and must be signed by the professional preparing the plan, who shall certify that the design of all storm water management practices meet the requirements in this chapter.
(Ord. of 12-20-07, § 1)
Ask a question about White Plains law
Corpus searches the White Plains sections it holds and shows the ones that match, with their citations. Free, no sign-in.
