For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7-3-44 — Same—Calculation generally, disposition, etc., of deposit

Municipal Code of the City of White Plains, New York (Codified through Ordinance of October 5, 2026. (Supp. No. 79, Update 2)) · White Plains City Code § 7-3-44

Corpus is an independent public-information project, not the official City of White Plains website. Stable reference: corpuslaw.us/code/f9c80ac6-c2ca-49e1-8472-40eeb4447cf3

Sec. 7-3-44. - Same—Calculation generally, disposition, etc., of deposit.

(a) The amount of deposit for street openings shall be computed in accordance with the following unit prices for pavements or other areas to be disturbed or work to be done, as determined by the commissioner, except that no deposit shall be required in the case of an opening made in an area other than a sidewalk, located within the limits of a county road under the jurisdiction of the county commissioner of public works, or within the limits of a state highway under the jurisdiction of the state commissioner of transportation, nor shall a deposit be required for connecting to a storm-water drain or other structure under the jurisdiction of said county commissioner of public works or state commissioner of transportation: CONCRETE OR REINFORCED CONCRETE pavement to be disturbed, for each square yard .....$150.00 PLANT-MIXED OR HOT-MIXED BITUMINOUS surfaced pavement to be disturbed, for each square yard .....125.00 ASPHALTIC MACADAM pavement to be disturbed, for each square yard .....125.00 BRICK PAVEMENT to be disturbed, for each square yard .....125.00 ALL OTHER TYPES OF PAVEMENT to be disturbed, for each square yard .....100.00 UNPAVED surfaces, of any type, to be disturbed, for each square yard .....30.00 SIDEWALKS, bituminous to be disturbed, for each square foot .....20.00 SIDEWALKS, other types, to be disturbed, other than for the installation of underground storage tanks, for each square foot .....25.00 GUTTERS (brick) to be disturbed, for each square foot .....30.00 GUTTERS (other types) to be disturbed, for each square foot .....25.00 CURBING (bituminous) to be disturbed, for each lineal foot .....40.00 CURBING GRANITE (saw-cut) to be disturbed, for each lineal foot .....60.00 CURBING (other types) to be disturbed, for each lineal foot .....40.00 STRUCTURES—connection to existing manhole, catch basin or other structure, for each separate connection .....600.00 STRUCTURES—construction of new manhole, catch basin or other structure, for each separate structure .....3,500.00 TRENCHING in any type of street surface within street right-of-way (including sidewalk area) and in addition to above specified deposits: (a) Where total depth is five (5) feet or less below pavement surface, for each lineal foot of trench .....60.00 (b) Where total depth is greater than five (5) feet and not more than twenty (20) feet below pavement surface, for each lineal foot of trench .....150.00 (c) Where depth is greater than twenty (20) feet below pavement surface, for each lineal foot of trench .....200.00 TEST BORINGS on any public street or other public area, for each boring hole .....150.00 CONNECTION of sewer service line or drainage service to cast iron pipe sanitary sewer or stormwater drain, for each separate connection .....350.00 CONNECTION of sewer service line or drainage service line to other type of sanitary sewer or stormwater drain, for each separate connection .....275.00 INSTALLATION OF UNDERGROUND VAULTS in sidewalk areas, for each square foot of overall horizontal surface disturbed .....350.00 and not less than minimum of .....4,000.00 EXCAVATION RELATED TO BUILDING CONSTRUCTION for foundation work, shoring, etc. (a) for each front foot when maximum depth of excavation below sidewalk grade is five (5) feet or less—for each foot of depth .....20.00 (b) for each front foot when maximum depth of excavation below side walk grade is greater than five (5) feet and not more than twenty (20) feet—for each foot of depth feet for each foot of depth .....25.00 (c) for each front foot when maximum depth of excavation is greater than twenty (20) feet-for each foot of depth .....75.00 INSTALLATION OF TIEBACKS (cable or bar types) under pavements or sidewalks for shoring support purposes for each tieback .....3,500.00 TRAFFIC CONTROL ITEMS—Excavation or any construction activity within public rights-of-way which will disrupt, damage, or interfere with any portion of the following: (a) Pavement markings: ..... Straight arrow, each .....350.00 Turn arrow, each .....400.00 Combination arrow, each .....600.00 Stop bar—12 feet minimum, each .....350.00 Crosswalk—12 feet minimum, each .....300.00 Pavement message, each .....600.00 (b) Electronic traffic detection loops (all sides) approximate size: ..... *6 feet × 6 feet .....3,000.00 *6 feet × 20 feet .....4,000.00 *6 feet × 50 feet .....5,000.00 *Repairs to or replacements of electronic vehicular detection systems are to be performed by qualified personnel only, using procedures which are approved by the commissioner of traffic DRIVING PIPES under pavements or sidewalks (amount of deposit to be based on area which would have been disturbed if work had been performed by open-cut trenching method) MINIMUM AMOUNT OF DEPOSIT for each street opening in the R1-30, R1-20, R1-12.5, R1-7.5, R1-5 and R2-4 districts .....500.00 MINIMUM AMOUNT OF DEPOSIT for each street opening in all other districts .....1,250.00 PLATING between the dates December 1 and March 31 and for each traffic lane affected the daily fee shall be .....50.00 there shall be an additional charge of $10.00 per plate utilized. (b) When excavating machinery or other equipment is to be used on work related to street openings or when such work is to be performed in or contiguous to any district other than the R1-30, R1-20, R1-12.5, R1-7.5, R1-5 and R2-4 districts, as defined in the zoning ordinance of the city, the commissioner, in his discretion, may increase the amount of deposit to be required over and above the amounts herein above specified to an amount which in the opinion of the commissioner would be sufficient to reimburse the city for any damage to the street or for any expense incurred by the city in maintaining and protecting traffic in a satisfactory and necessary manner. (c) When the permittee exceeds maximum size of opening or work specified in permit, the permittee shall, when so ordered and before proceeding with the work, pay to the commissioner such additional amounts of deposit as the commissioner may require. Failure on the part of the permittee to comply promptly with said order will be considered sufficient cause for revocation of the permit. (d) The amount of deposit shall be retained by the city for the duration of the period of maintenance. Upon the failure or default by the permittee of any of the terms, agreements, covenants and conditions of the permit on the permittee's part to be done or performed, said deposit may be used by the city for any expense incurred by the city by reason of such failure or default on the part of the permittee. Any balance left after the expense of such failure or default, as determined and certified by the commissioner, has been paid and deducted from the amount of the deposit shall be refunded to the permittee. (e) The period of maintenance shall be considered as a period of six (6) months after the date of final completion, as determined by the commissioner, of the work to be done pursuant to the terms of the permit, except however that, in the event that the termination of the said six (6) months' period shall fall within the months of December, January, February, March or April, then and in that event the period of maintenance shall be considered as extending until the first day of May next thereafter. (f) The permittee shall be responsible for the entire work and shall keep every portion of said work in perfect order and repair during the entire period of maintenance and should the said permittee fail to make the needed repairs to the work or to adequately maintain surfaces disturbed by said permittee, the commissioner reserves the right, in said commissioner's discretion and without prior notice to the permittee, to cause such repairs to be made or such surfaces to be maintained by the city's own forces or by contract or otherwise in which case the city shall be reimbursed for any expense incurred thereby in accordance with the provisions of section 7-3-4 of this Code, and the permittee shall have no claim against the city for loss of anticipated profits or for any losses by reason thereof.

(Ord. of 4-5-48, Art. III, § 5; Ord. of 5-19-54, § 4; Ord. of 12-5-55, § 1; Ord. of 7-8-58, § 4; Ord. of 4-17-67, § 6; Ord. of 8-7-72, § 4; Ord. of 8-6-90, § 1; Ord. of 5-3-93; Ord. of 11-14-96, § 3; Ord. of 4-3-00, § 1; Ord. of 6-4-07, § 1; Ord. of 6-1-09, § 1; Ord. of 5-24-10, § 4; Ord. of 5-26-11, § 4; Ord. of 5-30-13, § 2, eff. 7-1-13)

Ask a question about White Plains law

Corpus searches the White Plains sections it holds and shows the ones that match, with their citations. Free, no sign-in.