§ 7-3-61 — Backfilling

Municipal Code of the City of White Plains, New York (Codified through Ordinance of October 5, 2026. (Supp. No. 79, Update 2)) · White Plains City Code § 7-3-61

Corpus is an independent public-information project, not the official City of White Plains website. Stable reference: corpuslaw.us/code/e122a0d0-88fa-4c0b-a745-3a0fe4d74b70

Sec. 7-3-61. - Backfilling.

(a) No backfilling shall be done by the permittee until the work being done under the permit shall have first been inspected, and backfilling authorized, by the commissioner. In case of nonconformity with this requirement, the commissioner shall have the right to require that the work be uncovered by the permittee at the latter's own expense so that proper inspection may be made. (b) The material used to backfill the bottom of the trench up to a level of two (2) feet above the completed pipe or other structure shall be clean earth, sand or rock dust and shall contain no broken rock, stone or frozen earth. (c) Above a level two (2) feet higher than the top of the completed pipe or other structure, the material used for backfill shall be approved material containing no frozen earth and not more than one-third broken rock and no stone or piece thereof shall exceed one-half (½) cubic foot in size. (d) The space between the pipe or other structure and the bottom and sides of the trench shall be packed full by hand and thoroughly tamped as fast as placed and up to the level of the top of the pipe or other structure, which shall then be covered by hand to a level of at least three (3) feet higher than the top thereof, the backfill material being carefully deposited and tamped in layers not more than six (6) inches thick. (e) Such tamping shall be done with a light tamper weighing from six (6) to eight (8) pounds and shall be conducted in such a manner as to secure compacted backfill without in any way injuring or disturbing the completed pipe or structure. At least one man shall be provided for tamping for each man engaged in backfilling. (f) Backfilling above the level of three (3) feet above the top of the pipe or other structure shall be done in successive horizontal layers not exceeding six (6) inches in depth and each layer shall be thoroughly compacted by means of approved pneumatic tamping equipment or by such other means as may be approved by the commissioner. (g) The use of power equipment or other mechanical means for backfilling will not be allowed unless provision has been made for adequate compacting of backfill material and then only with the prior written authorization of the commissioner. (h) Compacting the backfill by means of flooding or puddling with water will not be allowed except with the prior written authorization of the commissioner.

(Ord. of 4-5-48, Art. IV, § 4; Ord. of 4-17-67, § 9)