Sec. 7-5-28. - Review and approval of pre-construction site development plans and on-site implementation procedures.

This section shall apply to development on any site or part thereof under an approved building plan, site plan, conservation development, subdivision plan or other approved plan where the approving agency has made issuance of permits for the development of the site subject to review and approval by the tree preservation committee of a pre-construction site development plan and on-site implementing procedures. (a) For an approved project meeting the above requirement, the developer shall prepare and the tree preservation committee shall review a pre-construction site development plan and on-site implementation procedures for pre-construction phase activities which shall include the following: (1) Pre-construction phase I activities: Activities subject to review in this initial phase include site preparation for rights-of-way, streets, utility easements, and construction equipment and materials storage areas. (2) Pre-construction phase II activities: Activities subject to review in this phase include site preparation for building lots, detention basins, drainage swales and other development activities not included in phase I. The basis for preparation of the pre-construction site development plan and on-site implementation procedures, shall be the plan approved by the approving agency including all conditions and attachments thereto. (b) Prior to the issuance of any permits for phase I activities, except as may be required to provide limited access to the site for the sole purposes of surveying the site and analyzing trees and site conditions, the following procedures shall be followed: (1) The developer shall prepare a pre-construction site development plan showing boundaries and maximum disturbance areas for the rights-of-way, streets, utility easements and construction equipment and materials storage areas that are proposed to be developed. (2) The maximum disturbance areas for the activities shown on the phase I pre-construction site development plan shall be clearly staked and marked on the site. (3) Any trees, tree clusters and environmentally sensitive features which are required to be preserved according to the approved plan and which are located in or within ten (10) feet of disturbance areas for phase I activities and shown on the pre-construction site development plan, shall be clearly marked, cordoned off and protected in a manner prescribed by the tree preservation committee. (4) After the phase I pre-construction site development plan has been received by the tree preservation committee and all disturbance areas and areas to be protected have been marked and protected on-site according subsections (2) and (3) above, the tree preservation committee shall inspect the site with the developer or his designee and the professional, as required by the approving agency, who developed the pre-construction site development plan, to determine that all trees, tree clusters, and environmentally sensitive features to be preserved according to the approved plan and the proposed pre-construction site development plan have been properly identified and protected on the site. The tree preservation committee may make recommendations to the developer for modifications to the proposed pre-construction site development plan and on-site implementation procedures to better protect trees, tree clusters and environmentally sensitive features. (5) Except as provided in paragraph (b) above, no departments or agencies shall issue any permits for phase I activities until the tree preservation committee has filed a report approving the pre-construction site development plan and on-site implementing procedures with the approving agency and the departments and agencies responsible for issuing said permits. (c) Prior to the issuance of any permits for phase II activities, the following procedures shall be followed: (1) The developer shall submit a staged pre-construction development plan for phase II activities for approval by the tree preservation committee. The plan shall designate the clusters of lots to be reviewed in each stage. The plan shall indicate the proposed maximum disturbance area on each lot in each lot cluster and show within the disturbance areas the maximum approved building foot print in a location having the least impact on existing grades, trees, tree clusters, and environmentally sensitive features. Tree clusters and environmentally sensitive features will necessarily cross lot lines and, within the approved lot layout, tree preservation and preservation of environmentally sensitive features shall be achieved irrespective of lot lines. (2) The maximum disturbance areas for the phase II activities and the maximum building footprint as shown on the phase II pre-construction site development plan shall be clearly staked and marked on the site, and the environmentally sensitive features, trees and trees clusters to be preserved shall be properly identified and protected in a manner prescribed by the tree preservation committee. (3) After the phase II pre-construction site development plan has been reviewed by the tree preservation committee and the developer has marked the site and protected trees, the tree clusters and environmentally sensitive features on-site according paragraph (2) above, the tree preservation committee shall inspect the site with the developer and/or his designee and with the professional who developed the pre-construction site development plan, as required by the approving agency, to determine that all trees, tree clusters, and environmentally sensitive features shown to be preserved on the approved plans and the pre-construction site development plan have been properly identified and protected on the site. The tree preservation committee may make recommendations to the developer for modifications to the proposed pre-construction site development plan and on-site implementation procedures to preserve and protect the trees, tree clusters and environmentally sensitive features. (4) No departments or agencies shall issue any permits for phase II activities until the tree preservation committee has filed a report approving the pre-construction site development plan and on-site implementing procedures for the phase II activities with the approving agency and with the departments and agencies responsible for issuing said permits. The tree preservation committee may issue separate approval reports for separate clusters of lots.

(Res. of 2-5-96, § 5)