For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7-8-121 — Appendix A, charges, fees and deposits

Municipal Code of the City of White Plains, New York (Codified through Ordinance of October 5, 2026. (Supp. No. 79, Update 2)) · White Plains City Code § 7-8-121

Corpus is an independent public-information project, not the official City of White Plains website. Stable reference: corpuslaw.us/code/8da40d59-3259-4818-9e49-a1827f6a66ca

Sec. 7-8-121. - Appendix A, charges, fees and deposits.

The following charges, fees and deposits shall be applicable as indicated to this article: (a) Construction Meters: Meter Size (inches) | Deposit | Fee ⅝ to ¾ | $200.00 | $20.00 1 | $300.00 | $30.00 1½ | $500.00 | $50.00 2 | $600.00 | $60.00 Size of Backflow Preventer (inches) | Deposit | Fee ¾ | $250.00 | $100.00 1 | $350.00 | $200.00 1½ | $450.00 | $250.00 2 | $550.00 | $350.00 (b) Hydrant Permits: 1. Deposits: ..... per Hydrant .....$5,000.00 per Wrench .....$50.00 per Backflow Preventer (¾″) .....$250.00 per Backflow Preventer (1″) .....$350.00 per Backflow Preventer (1½″) .....$450.00 per Backflow Preventer (2″) .....$550.00 2. Fees: (30 consecutive calendar days or less): ..... per ¾″ Connection .....$100.00 per 1″ Connection .....$200.00 per 1½″ Connection .....$250.00 per 2″ Connection .....$350.00 The above fees and deposits shall be doubled for permits issued and/or renewed during the period from December 1 to April 1 or if any part of the effective life of such permit is or extends into said calendar period. (c) Tap Fee and Pipe Charge: Tap Size | Fee | Pipe Charge (per lineal ft.) 1″ | $4,300 | included in tap fee 1½″ | $5,650 | included in tap fee 2″ | $6,750 | included in tap fee 4″ | see table below | $20.00 6″ | see table below | $25.00 8″ | see table below | $30.00 10″ | see table below | $35.00 12″ | see table below | $40.00 Tap Size Main Size | 4″ | 6″ | 8″ | 10″ | 12″ 6″ | $4,600 | — | — | — | — 8″ | $4,600 | — | — | — | — 10″ | $4,700 | $5,100 | — | — | — 12″ | $4,900 | $5,150 | $6,250 | — | — 14″ | $5,500 | $5,400 | $6,500 | $8,800 | — 16″ | $5,800 | $6,000 | $7,450 | $9,650 | $11,600 18″ | $5,850 | $6,350 | $7,550 | $9,900 | $11,950 20″ | $6,200 | $6,400 | $7,650 | $10,000 | $12,100 24″ | $6,350 | $6,750 | $8,150 | $10,550 | $12,700 Note: Tapping of pipe which is of a material other than cast iron or ductile iron, or of a size not indicated above, shall require a special tap fee. This special fee shall be determined by the commissioner. (d) Meter Test Fee (Requested by Owner): Size (inches) | Fee ⅝ to 1 | $25.00 1½ to 2 | $90.00 (e) Charges for Missing, Frozen or Damaged Meters: (1) Material replacement charge: Item | Size (inches) | Charge Meter Base | ⅝ to ¾ | $200.00 Meter Base | 1 | $350.00 Meter Base | 1½ | $750.00 Meter Base | 2 | $1,150 Generator Head | ⅝ to 2 | $50.00 Remote Register | ⅝ to 2 | $20.00 Meter Transmission Unit (MTU) | ⅝ to 2 | $75.00 (2) Labor and equipment reinstallation charge: Item | Size (inches) | Charge Meter Base | ⅝ to 2 | $100.00 Generator Head and/or Remote Register including Sealing | ⅝ to 2 | $20.00 (3) Resealing Only: Meter and/or Remote Register .....$ 10.00 (f) Water Rates: Consumption (Semi-annual) | Basic Schedule (Semi-annual) | Excess Non-Per Capita Users Schedule 120,000cf and over (Quarterly as defined in this Chapter herein) First 2,500cf | —— | $5.44/100cf First 5,000cf | $2.87/100cf | —— Next 5,000cf | —— | $6.09/100cf Next 10,000cf | $3.21/100cf | —— Next 10,000cf | —— | $6.80/100cf Next 20,000cf | $3.63/100cf | —— Next 15,000cf | —— | $8.13/100cf Next 30,000cf | $5.24/100cf | —— Next 27,500cf | —— | $10.74/100cf Next 55,000cf | $5.76/100cf | —— Next 60,000cf | —— | $13.74/100cf Next 130,000cf | —— | $17.09/100cf Next 380,000cf | $7.99/100cf | —— Next 250,000cf | —— | $19.65/100cf Next 500,000cf | $10.17/100cf | —— Over 500,000cf | —— | $22.89/100cf Over 1,000,000cf | $11.88/100cf | —— (g) Special Meter Reading and Billing: $75.00. For those who choose not to participate in the City's Automated Meter Reading Program (AMR), a fee of $75 will be assessed for every meter reading required for normal billing purposes. (h) Water Availability/Demand Charge: These charges are applicable to the domestic service from the date the tap or connection made to the city's water supply system is placed in service until such time as the same tap or connection is permanently discontinued in accordance with section 7-8-30(c) of this Code: WITHIN CITY LIMITS: Basic Schedule | Excess Non Per Capita Schedule Size of Connection | Charge (semi- annual) | Size of Connection | Charge (quarterly) 1" & less | $39.59 | 1" & less | $19.81 1 ½" | $91.01 | 1 ½" | $45.56 2" | $158.35 | 2" | $79.20 3" | $356.31 | 3" | $178.16 4" | $645.48 | 4" | $322.73 6" | $1,512.84 | 6" | $756.41 8" & over | $2,602.05 | 8" & over | $1,301.07 OUTSIDE CITY LIMITS: Double the "within city limits" charge. (i) Fire Service Line Stand-By Charge: These charges are applicable to the fire service line from the date the tap or connection made to the city's water supply system or fire main is placed in service until such time as the same tap or connection is permanently discontinued in accordance with section 7-8-30(c) of this Code. Pipe Size (inches) | Charge (semi-annual) Up to 6 | $100.00 8 and up | $500.00 (j) Private Hydrant Stand-By Charge (Semi-Annual): These charges, for unmetered hydrants on private property, are applicable from the date the tap or connection made to the city's water supply system or fire main is placed in service until such time as same tap or connection is permanently discontinued in accordance with subsection (c) of this section. Hydrant $150.00 each (semi-annual). (k) Special Valve Installations: The charge shall be based upon the actual cost of labor, equipment and materials necessary to complete the work as determined by the commissioner. (l) Resetting and/or Relocating Hydrants: (1) Hydrant (removed and reset), $1,500.00 each; (2) Pipe (including fittings), $550.00 per L.F. installed. (m) New Hydrant Installed (excluding tap): (1) Hydrant furnished and installed, $3,900.00 each; (2) Pipe (including fittings), $550.00 per L.F. installed. (n) Billing Schedule: Water bills are to be rendered quarterly for applicable excess non-per capita users and semi-annually for basic schedule users as to individual accounts and are due and payable at the office of the commissioner of finance within thirty (30) days after being rendered. The city may be divided into control areas by the commissioner of public works to provide prompt reading and billing with different due dates for control areas. Arrears are subject to penalties as stated in section 200 of the Charter of the city. (o) Miscellaneous Charges: The charges for any work requested which is approved by the commissioner and performed by the bureau of water, not specified herein above, shall be based upon the cost of labor, equipment and materials necessary to complete the work as determined by the commissioner. (p) Water Fill Station (Orchard Street Pump Station): $50.00 per fill-up to a maximum of 2,500 gallons. (q) Chlorination Assistance Charge: These charges are payable in advance and cover the operation of valves, sampling and flushing the service line four (4) inches or greater in size. Weekdays 8:00 a.m. to 4:30 p.m., holidays excluded. $600.00 each line. (r) Backflow Preventer Charge: These charges are payable in advance and cover the cost of labor and equipment for observing the test of the approved backflow prevention device. Weekdays 8:00 a.m. to 4:30 p.m., holidays excluded. $25.00 each device up to and including two (2) inches in size. $50.00 each device above two (2) inches in size. Application fee: This charge is payable in advance and covers the cost of administrative functions to review and inspect all new backflow device applications and installations, $200 each application. (s) Observation of Meter Tests: $25.00 each test. (t) Municipal main connections done by an applicant's outside contractor charge. When directed by the commissioner, municipal water main connections done by an applicant's outside contractor under the direct observation of the commissioner or a designated representative will result in a charge to the applicant in the amount of 40% of the applicable tap fee and pipe charge, as set forth in section 7-8-121(c) herein.

(Regs. of 3-5-79, App. A; Regs. of 5-7-79; Regs. of 4-27-81; Regs. of 4-19-82; Regs. of 7-3-85; Ord. of 11-3-86, §§ 1, 2; Ord. of 5-3-93; Ord. of 5-25-95; Ord. of 5-20-99, § 1; Ord. of 4-3-00, § 1; Ord. of 4-7-04, §§ 2—5; Ord. of 5-25-05, §§ 2—4; Ord. of 5-25-06, §§ 1, 2; Ord. of 5-24-07, §§ 1, 2; Ord. of 5-22-08, §§ 1, 2; Ord. of 5-28-09, §§ 1, 2; Ord. of 12-6-10, §§ 1, 2; Ord. of 12-5-11, § 2; Ord. of 12-3-12, §§ 1—3; Ord. of 12-2-13, §§ 2—5; Ord. of 10-28-14, §§ 1, 2; Ord. of 11-2-15, §§ 1, 2; Ord. of 11-7-16, §§ 2—7; Ord. of 12-4-17, §§ 1, 2; Ord. of 12-3-18, §§ 1—3; Ord. of 11-4-19, § 2; Ord. of 12-11-23, § 1; Ord. of 5-27-2025(12), § 1; Ord. of 5-26-26(1), § 1)

Ask a question about White Plains law

Corpus searches the White Plains sections it holds and shows the ones that match, with their citations. Free, no sign-in.