For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 155.08 — Permitted uses

Akron, Ohio, Municipal Code (Supp. No. 64: codified through Ordinance No. 40-2026, enacted February 9, 2026) · Akron Codified Ordinances § 155.08

Corpus is an independent public-information project, not the official City of Akron website. Stable reference: corpuslaw.us/code/a6d1bdfb-d187-462f-95cb-cd1ba55400ba

155.08 - Permitted uses.

A. The following uses are permitted within the riparian setbacks with prior approval of the design: 1. Stream Bank Stabilization/Erosion Control Measures. Best management practices (BMPs) for stream bank stabilization or erosion control may be allowed if such practices are within permitted uses by the local, state, and federal government regulations and are ecologically compatible and emphasize the use of natural materials and native plant species where practical and available. Such stream bank stabilization/erosion control practices shall only be undertaken upon approval of a Stormwater Pollution Prevention Plan by the Summit SWCD. 2. Crossings. All roadway crossings shall be approximately perpendicular to the stream flow, shall minimize disturbance to the riparian setback, and shall mitigate any necessary disturbances. In reviewing plans for stream crossings, the City may confer with the Summit SWCD, the Ohio Department of Natural Resources, Division of Natural Areas; the Ohio Environmental Protection Agency, Division of Surface Water; the County of Summit Engineer; the Summit County Health Department; or other technical experts as necessary. 3. Limited crossings of approved streams through the riparian setback by vehicles, storm sewers, sewer and/or water lines, and public utility lines will be per the approval of City and state governing agencies and as a part of the regular subdivision review process. 4. Construction or installation of recreation features or public park elements, including construction of a publicly accessible trail or pedestrian walkway. 5. Utility installation when such activities and installations cannot reasonably be located outside the riparian setback or other nearby areas of development. Placement of stormwater retention or detention facilities may be considered within the riparian setback if the stormwater quality treatment that is consistent with current state standards is incorporated into the basin. 6. Structures and uses within the riparian setback, existing at the time of passage of these regulations, that are not permitted under these regulations may be continued but shall not be expanded except as set forth in this chapter.

(Ord. 328-2023)

Ask a question about Akron law

Corpus searches the Akron sections it holds and shows the ones that match, with their citations. Free, no sign-in.