For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 116.31 — Service maintenance standards

Code of Ordinances, City of Dayton, Ohio (Supp. No. 36: codified through Ordinance No. 32173-25, passed December 31, 2025) · Dayton City Code § 116.31

Corpus is an independent public-information project, not the official City of Dayton website. Stable reference: corpuslaw.us/code/19d2f2b8-97ad-440d-86ac-26422ece59fd

Sec. 116.31. - Service maintenance standards.

(A) Grantee will maintain its Cable Television System in conformity with generally accepted standards for Systems of comparable size and age to the System serving the city. (B) The Grantee shall render prompt and efficient service and repairs and shall voluntarily interrupt service only for good cause and for the shortest time possible. Such interruptions, insofar as is reasonably possible, shall be preceded by notice and shall occur during periods of minimum use. (C) Without additional charges to any subscriber, the Grantee shall maintain its facilities in good working order and repair. Any verbal, telephonic, or written complaint relating to the quality or continuity of service shall be attended to as soon as possible. In the event of an outage, if service is not restored as outlined in the NCTA Customer Service Standards, the subscriber shall be entitled upon request to a rebate of one-thirtieth of the monthly service fee for each day or part thereof until service is restored. In the event of an outage caused by an event of force majeure, the provisions of § 116.64 shall control. (D) The Grantee shall maintain the existing System and any rebuilt System installed and operated pursuant to § 116.21(H), so that, at a minimum, it conforms with the following technical guidelines: (1) C/N—36dB (2) Gain vs. Freq. Single Channel—+/-2dB from 75 MHz to 5.0 MHz above lower boundaries frequency of the television channel (3) Gain vs. Freq. Sys.—12 dB (overall) (4) 2nd Order Dist.—54 dBc (5) Hum Mod.—less than five percent (6) Carrier to Triple Beat—52 dB (7) System Leakage— Up to 54 MHz,—15 microvolts/meter @ 100 ft. 54 to 216 MHz,—20 microvolts/meter @ 10 ft. Above 216 MHz,—15 microvolts/meter @ 100 ft. (8) Subscriber Isol.—18 dB (9) Sys. Level Stab.—12 dB in a 24-hour period (10) Min. Signal Level—0 dBmV (11) Aural Carrier Level—12-17 dB below related visual signal carrier level (12) Vis. Car. Freq.—1.25 MHz from lower boundaries +/-25åKHz (nonaeronautical channels) +1/-5KHz (aeronautical channels) +1/-250 KHz (converter output) (13) Aur. Car. Freq.—4.5 MHz + 1 KHz from visual carrier (E) The Grantee shall perform proof of performance tests from the System following the rebuild and at other times at least annually throughout the life of this Franchise. Tests shall be performed at the end of each trunk line and on each headend. These tests shall be completed within a 30 day time frame and a written report of the results shall be completed within seven days. Included in this report will be any corrective measures and the results of all retests made to the trunk, distribution System, or headend(s) that fail to meet the performance specifications outlined in subsection (D) of this section. The proof of performance report shall be kept on file and made available to the city upon request. (F) The city retains the right to perform proof of performance tests for the System at any time upon reasonable notice to the Grantee, and the Grantee shall cooperate in such tests. The city shall bear the costs of performing such tests.

(Ord. 28338, passed 7-24-91)

Ask a question about Dayton law

Corpus searches the Dayton sections it holds and shows the ones that match, with their citations. Free, no sign-in.