§ 117.02 — Construction time limit
Code of Ordinances, City of Dayton, Ohio (Supp. No. 36: codified through Ordinance No. 32173-25, passed December 31, 2025) · Dayton City Code § 117.02
Corpus is an independent public-information project, not the official City of Dayton website. Stable reference: corpuslaw.us/code/6fe587e4-2e61-4dbf-a5b5-ab0a4c14dd2b
Sec. 117.02. - Construction time limit.
(A) All of the wires and cables within the territory shall by the company be placed, maintained, and operated underground in conduits constructed beneath the surface of the streets, lanes, alleys, and public grounds in the parts of the city, and all necessary man and hand-holes may be constructed, and all other things required in connection with said conduits and underground wires may be done and are authorized to be done by the company. (B) The company shall commence the construction of the conduits and placing its wires and cables underground within 90 days from the taking effect of this chapter, and shall have same completed within 18 months from the same date.
(Ord. 6580, passed 7-31-05)
Ask a question about Dayton law
Corpus searches the Dayton sections it holds and shows the ones that match, with their citations. Free, no sign-in.