For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 1106.04 — Final plat submission requirements (pre-construction)

Codified Ordinances of the City of Delaware, Ohio (Codified through Ordinance No. 26-37, enacted September 14, 2026. (Supp. No. 28)) · Delaware Codified Ordinances § 1106.04

Corpus is an independent public-information project, not the official City of Delaware website. Stable reference: corpuslaw.us/code/94ee8d4f-8b96-431c-9317-da1895282159

1106.04. - Final plat submission requirements (pre-construction).

The owner of land who desires to subdivide shall submit the required information set forth in the application checklist on file in the Planning and Community Development Department. (a) A complete final plat (pre-construction) application shall be submitted to the Director of Planning and Community Development and shall be processed in accordance with this section. (b) The Director of Planning and Community Development shall review each submitted application to determine compliance with the submission requirements. If the application is deemed insufficient or incomplete, the Director of Planning and Community Development shall notify the applicant in writing within ten (10) business days of receiving such application of necessary changes or additional information needed. When the application is deemed sufficient and complete and the application fee has been paid, the Director of Planning and Community Development shall officially accept the application for consideration of the action(s) requested on the date such determination is made. (c) Surveying practices, plats and legal descriptions shall meet the requirements of the Ohio Revised Code and these regulations. All research, investigation, monumentation, measurement specifications, plat of survey, descriptions, and subdivision plats shall conform to the standards for boundary surveys in the State of Ohio in accordance with Ohio Administrative Code Rule 4733-37. The final plat shall contain all the information required for the preliminary plat, adhere to all conditions imposed by the City Engineer, meet all requirements imposed by the Planning Commission and include the following: (1) The name of the surveyor who made the plat. (2) Layout, numbers, and dimensions of lots and blocks. (3) Lot width and lot frontage lines plus the distance between them shown graphically with dimensions. (4) Boundary of plat, based on an accurate traverse, with angular and lineal dimensions, and the datum used. (5) True angles and distances to the nearest established street lines or official monuments, not less than three, accurately described on the plat. (6) Municipal, township, county or section lines accurately tied to the lines of the subdivision by distances and angles. (7) Radii, internal angles, points of curvature, tangent bearings, and lengths of all chord dimensions. (8) All lot numbers and lines with accurate dimensions in feet and hundredths. (9) Boundary monuments shall be in accordance with ORC Rule 4733-37-03. One such monument shall be placed at each corner and at each change of direction of the boundary. Monumentation shall be placed in the centerlines of all new roads at intersections and at other locations where required by the City Engineer. Boundary monuments installed in roadway pavement, areas of future roadway pavement, or at any other location required by the City Engineer, shall be installed in a cast iron monument box in accordance with the Engineering Standards, current at time of submission. The datum shall be stated. (10) Exact location, width, and name of all streets and other public ways. Lines of adjoining public and private streets and alleys, with their widths and names and including radii, arcs, points of tangency, and central angles for all curvilinear streets and alleys plus radii for all rounded corners. (11) Location, dimensions, acreage, and legal descriptions of any areas to be dedicated or reserved for public use, with the purposes indicated thereon, and of any area to be reserved by deed covenant for the common use of all property owners. (12) A statement by a surveyor registered in the State that the plat represents a survey made by them and that all dimensional and geodetic details are correct. (13) Notarized certification by the owner of the adoption of the plat and the dedication by him to public use of the streets and other public areas shown on the plat. (14) The proper form for the approval of the Planning Commission, with space for signatures, plus providing case number and date, plus Planning Commission case number and date. (15) Space for acceptance by signature of the City Manager of the public improvements required. (16) Coordinates of property corners, and major intersections within subdivisions shall be shown in the State Plane Coordinate System. A. Referenced to the Delaware County Monumentation System. The plat must specify which monuments were used to establish the coordinates. A map of the available monuments and their coordinates is available from the City of Delaware Engineer's Office or the Delaware County Map Office. (17) Notes concerning the establishment of a homeowners' association or other controlling party. (18) Proposed and existing easements (especially including electric and streetlight easements), and/or preservation zones as well as their purpose and width. (19) Within planned unit developments, a table summarizing building setbacks. (20) Other information necessary for the evaluation of the final plat, as deemed necessary by the Director of Planning and Community Development or the Planning Commission. (21) At the discretion of the Director of Planning and Community Development, the applicant can be required to show any off-site easements within 100 feet of the subject property. (d) The final plat (pre-construction) shall be drawn on standard size paper twenty-four inches by thirty-six inches in size, unless otherwise authorized. If the final plat (pre-construction) is to be drawn in sections, each section shall be accompanied by a key map, showing the location of the several sections. (e) The Planning Commission shall approve, approve with conditions, or disapprove the final plat (pre-construction). Failure of the Planning Commission to act within 120 days from the date the application was deemed complete, or an extended period as may be agreed upon, shall, at the election of the applicant, be deemed a disapproval of the application. (f) The Planning Commission approves the final plat (pre-construction) only if satisfied that the plat complies in all respects with this chapter: (1) That the owner shall make no conveyance of any lot smaller in width or area than indicated on the plat; (2) That all construction work and materials used in connection with public improvements in the area platted shall conform to the requirements and standards of the City and be installed under the City's supervision; and (3) A preconstruction meeting shall be held prior to beginning construction on all projects. (g) The approval of the final plat (pre-construction) shall be effective for a maximum period of thirty-six (36) months. During this time, construction of public improvements must be started within twelve (12) months of approval of a final plat (pre-construction) as evidenced by approval of the City via documented inspections. Within twenty-four (24) months of the public improvements being started, they must be installed or bonded to be installed per Section 1106.15, and approved by the City, or the final subdivision plat (pre-construction) shall be resubmitted to the Planning Commission for consideration of reapproval. (h) Upon request by the owner, a one-time only, administrative extension of the approval period may be granted by the Director of Planning and Community Development. In the event such an extension is granted, the period of extension shall not exceed one (1) year. (1) The owner shall submit a written request with any additional requested information to the Planning and Community Development Director. (2) Within ten (10) days from receipt, the Director of Planning and Community Development shall either, in writing, deny the request, approve the request as submitted, or approve the request for extension for a lesser period of time than requested by the owner. (3) Any extension of the approval period shall become effective and begin on the date of approval of such extension. (4) After approval of the final plat (pre-construction) by the Planning Commission and acceptance of the public improvements by the City according to the provisions of Section 1106.15, the final plat (post construction) shall be submitted for review and signature by the City followed by recording with the County Recorder. The owner shall file and record the final plat (post construction) with the County Recorder within sixty (60) days of City acceptance of the public improvements. If not recorded within this time, such plat (pre and post construction) shall become null and void, unless the delay is excused by the City for good reason, in its sole discretion. The owner shall provide the City a copy (or copies) of the recorded final plat (post construction) in a format(s) acceptable to and as required by the City.

(Ord. 25-38. Passed 7-14-25)

Ask a question about Delaware law

Corpus searches the Delaware sections it holds and shows the ones that match, with their citations. Free, no sign-in.