§ 1134.03 — Wind energy systems (WES)
Codified Ordinances of the City of Delaware, Ohio (Codified through Ordinance No. 26-37, enacted September 14, 2026. (Supp. No. 28)) · Delaware Codified Ordinances § 1134.03
Corpus is an independent public-information project, not the official City of Delaware website. Stable reference: corpuslaw.us/code/a789fb4c-6a86-4b61-bbfb-1114183c21a0
1134.03. - Wind energy systems (WES).
Wind energy systems shall be permitted in all zoning districts and adhere to the following standards: (a) Building-mounted wind energy systems shall be permitted in all zoning districts where structures are allowed, and shall meet the following requirements: (1) Height. Wind energy systems mounted to a principal or accessory building may not exceed a height ten (10) feet above the highest point of the roof, excluding chimneys, antennae, and similar roof-mounted objects. (2) Location. Systems shall be located at least ten (10) feet apart. (3) Quantity. Quantity is limited to two (2) per building. (4) Historic District. Roof-mounted WES located within the City of Delaware Historic District shall be placed on the roof such that the components would not be visible from public rights-of-way and require a certificate of appropriateness prior to installation. (5) Permit Required. All building-mounted WES shall be required to receive a certificate of building and zoning compliance prior to installation and include the location of the proposed WES, wiring and any associated equipment or provision as required by the Ohio Building Code. (b) Accessory ground-mounted wind energy systems shall be permitted as a conditional use in all non-residential districts and shall meet the following requirements: (1) Height. The tower of a tower-mounted wind energy system shall not exceed 150 feet in height as measured at grade to top of the tower. Wind energy systems shall be built to comply with all applicable Federal Aviation Administration regulations. The tower of a wind energy system shall be designed and installed so as not to provide step bolts or a ladder readily accessible to the public for a minimum height of ten (10) feet above the ground. (2) Siting. Freestanding wind energy systems mounted on a pole or tower shall be set back a minimum distance equal to the height of the wind energy system from any principal building, property lines, aboveground transmission lines, and other wind energy systems. (3) Signage. Appropriate warning signage (e.g. "Danger, High Voltage") shall be placed where it is clearly visible by persons standing near the tower base or other ground-mounted electrical equipment. (4) Visual Impact. A. The applicant shall demonstrate through project site planning and proposed mitigation that a wind energy system's visual impact will be minimized for surrounding neighbors and the community. This may include, but not be limited to information regarding site selection, wind energy system design or appearance, buffering, and screening of ground mounted electrical and control equipment. B. The color of wind energy systems shall be painted with a non-reflective, unobtrusive color that blends in with the surrounding environment. C. Wind energy systems shall not be artificially lit unless such lighting is required by the Federal Aviation Administration. If lighting is required, the applicant shall provide a copy of the Federal Aviation Administration determination to establish the required markings and/or lights for the wind energy system. (5) Sound. Operation of wind energy systems shall not exceed sound levels set forth in Section 509.10 of the Codified Noise Ordinance of the City of Delaware. A. Utility Connections. i. All electric and control equipment shall be safely and appropriately enclosed from unintentional access by means such as lockable equipment cabinetry, enclosed tower with lockable access door, or similar. ii. Wiring between wind energy systems and point of interconnection shall be underground. iii. Wind energy systems proposed to be connected to the power grid through net metering shall adhere to Ohio Revised Code Section 4928.67 or any future corresponding statutory provision. (6) Permit Required. All ground-mounted WES shall be required to receive a certificate of building and zoning compliance prior to installation and shall include: A. A site plan drawn to scale showing property lines and physical dimensions of the applicant's property. B. Location, dimensions, and types of existing structures on the property. C. Location of the proposed wind energy system, foundations, guy wires and associated equipment or provision as required by the Ohio Building Code. D. Fall zone depicted as a radius around the center of the tower for a tower mounted wind energy system. E. The right-of-way or future right-of-way according to the City of Delaware Thoroughfare Plan for any public road that is contiguous with the property. i. All overhead utility lines. F. Any additional information as requested by the Director of Planning and Community Development. (7) Decommissioning. Wind energy systems shall be removed within six (6) months after they have reached the end of their useful life, which is determined if no electricity is generated for a continuous period of twelve (12) months. Time extensions may be permitted allowed when good faith efforts to repair can be demonstrated. Extensions shall be requested in writing to the Director of Planning and Community Development.
(Ord. 25-38. Passed 7-14-25)
Ask a question about Delaware law
Corpus searches the Delaware sections it holds and shows the ones that match, with their citations. Free, no sign-in.
